Running head: PROJECT MANAGEMENT Project: E-Toll system in India Hyderabad Ring Road Name of the Student Name of the University Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 PROJECT MANAGEMENT Table of Contents 1. Project introduction and initiation...............................................................................................2 1.1 Project background................................................................................................................2 1.2 Project need statement...........................................................................................................2 1.3 Project business case analysis................................................................................................3 1.4 Root cause analysis for initiating the project.........................................................................4 1.5 Project objectives...................................................................................................................5 2. Project scope, time and schedule management............................................................................5 2.1 Deliverables...........................................................................................................................5 2.2 Preliminary scope..................................................................................................................7 2.3 Milestone...............................................................................................................................8 2.4 WBS.......................................................................................................................................8 2.5 Gantt chart...........................................................................................................................10 Bibliography..................................................................................................................................12
2 PROJECT MANAGEMENT 1. Project introduction and initiation 1.1 Project background The project mainly reflects on the development of E-toll system in Hyderabad Ring road. Presently, manual toll system is mainly utilized in Hyderabad ring road which generally requires a toll collector or attendant who receives toll as per the classification of the vehicle. As the manual system of collecting toll is time consuming therefore the vehicles need to wait in queue in order to pay for the money which further creates a number of challenges [2].It mainly reduces the efficiency of traffic flow and causes problems like traffic congestion. In order to reduce the problem that are mainly faced by the vehicles on Hyderabad ring road, it is quite necessary to implement the E-toll system. It is found that the main aim of the project is to eliminate the delay on Hyderabad ring road which is one of the busiest 8lane ring road expressway that encircles the capital city of Hyderabad in India [3]. It is found that with the help of the electronic toll collection system, the speed as well as efficiency of the traffic flow can be improved which further helps in saving the time of the drivers. In addition to this, it is found that due to the better flow of the traffic, the congestion gets reduced and the fuel economy gets improved. Moreover, it is found that it further helps in increasing revenue by saving time and for attracting the customers properly. 1.2 Project need statement The presence of manual toll system on Hyderabad ring road generally have lot of demerits and are also considered to be difficult to solve the problems that are mainly related with traffic congestion as well as time wastage. In addition to this, it is found that the manual toll system is considered as one of the slow system that generally requires more tolls than any other for achieving proper traffic flow. Moreover, the traffic cost that is associated with the manual toll
3 PROJECT MANAGEMENT set-up is considered to be costly if the acquisition of the land is high. It is found that during the intervention of collecting moneys from tolls, the processing time that is generally required is quite high as the vehicle sensors need to crosscheck the data against the toll that is generally collected by the toll attendant. In order to resolve the issue, it is quite necessary to implement electronic toll system on Hyderabad ring road. The electronic toll system does not help in enhancing the traffic flow but also helps in saving the time of the drivers. 1.3 Project business case analysis The paper mainly focuses on the implementation of E-toll system on Hyderabad ring road in order to resolve the issues that occur due the utilization of manual toll system. It is found that the manual toll system mainly collects toll on the basis of vehicle classification by the attendant of toll and order to pay money, the vehicles need to stand in queue. As the manual system is utilized for completing the entire operation therefore the processing time that is needed is quite high. Due to delay of few minutes in processing within the manual toll system can creates traffic congestion. Furthermore, the drivers who cross the toll faces time related issues and challenges. In order to mitigate this type of issues and challenges, it is quite necessary to implement electronic toll system. It is found that the implementation of toll system not only helps in improving the efficiency of the traffic flow and help in saving the time of the drivers but also helps in providing a better flow of traffic by reducing congestion that further helps in increasing revenue in context to time savings. Moreover, it is found that the electronic toll system will be implemented within 7 months by utilizing budget of AUD 300,000 by following the scope of the project in order to achieve the objectives of the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PROJECT MANAGEMENT 1.4 Root cause analysis for initiating the project Root-causeanalysisisdefinedasoneofthesystematicprocedurethathelpsin determining the root causes of problems or events which further have proper approach of responding the root causes that are mainly related with the project. It is considered as one of the best idea that is needed for effective management. [4]. It is defined as one of the procedure that helps in properly defining, understanding as well as solving a problem quite effectively. It is found that the root cause of the problems that occur due to the utilization of manual toll system on Hyderabad ring road are generally analyzed on the basis of 5 Whys root cause analysis tool. Figure 1: 5 whys root cause analysis (Source: Created by Author) It is found that determining the root cause of the problems which mainly occurs due to the presence of manual toll system in Hyderabad ring road utilizes Five Whys analysis. It is identified that this specific type of analysis is mainly utilized in order to get idea about the root cause of the problem by asking 5 why. This analysis method reflects that the manual toll system 5whys Why Low processing time Why Expensive set up Why Slow Why Labour cost Why Inconsistency in data entry
5 PROJECT MANAGEMENT faces issues or problems as the processing time that is required the system is quite slow as the attendants need to cross check data. Secondly, traffic cost that is associated with the manual toll set-up is considered to be costly if the acquisition of the land is high. Thirdly, it is identified that the vehicles need to maintain queue in order to pay the toll which further causes wastage of time and this is because that the manual system that is utilized is slow [5]. The labour cost is high as an attendant is generally required who have the responsibility of undertaking the entire operation of tool in order to collect toll tax. Lastly, it is found that errors can be reflected in the bills and in updating details of the vehicles and it is mainly because of inconsistency in data entry. 1.5 Project objectives The main objectives of the project for the development of e-toll system on Hyderabad Ring road is generally provided below: To implement e-toll system on Hyderabad ring road To determine the issue that mainly occurs due to manual toll system To enhance the efficiency of traffic flow by reducing traffic congestion 2. Project scope, time and schedule management 2.1 Deliverables Deliverables are mainly defined as one of the project management term that helps in describing the quantifiable services as well as goods that are generally needed for successful completion of the project. Deliverables are generally categorized into tangible and intangible deliverables [7]. As a new toll system is required to be implemented on Hyderabad ring road, the various deliverables that are mainly associated with the work of the project are generally elaborated below:
6 PROJECT MANAGEMENT Progress report:The progress report generally contains information about the progress of the project and further provides details about the project status that helps in ensuring that the entire project is on track and it will get completed successfully within the expected time as per the assumption. Site investigation report:The site investigation report generally includes details about the stages of the project work that are completed and the future activities that are helpful in successfully completing the work of the project. In addition to this, the site investigation report includes details about the project site [4]. Feasibility report:The feasibility report is considered as the deliverables of the project that generally assess the potential solutions to the business problem or opportunity and further helps in determining which of the factors are generally viable for further analysis. In addition to this, the feasibility report ensures that the project is feasible and therefore the project can be undertaken. Tender document:The tender document includes details about referring the project suppliers that are generally required in order to complete the work of construction quite successfully. The tender documents are generally broken into number of packages for the design drawing that is considered to be suitable to be issued to the project contractor as well as sub- contractors for the implementation of E-toll system on the Hyderabad ring road. Design report:The design report is one of the written record of the project that generally includes details about the design of E-toll system. The design report generally helps in reflecting detailed design of the project for implementing the E-toll system successfully [5].
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7 PROJECT MANAGEMENT 2.2 Preliminary scope Projectscope isconsideredasa part of projectplanning thatgenerallyhelpsin determining as well as documenting a list of specific project goals, deliverables, features, functions as well as deadlines of the project. The scope of the project is mainly categorized into in-scope and out-scope. It is found that the scope of the project for the implementation of E-toll system on Hyderabad ring road are generally reflected below with the help of the Smart criteria: Specific:The main goal of the project is to implement the e-toll system successfully on the Hyderabad ring road in order to have effective flow of traffic that helps in providing proper driving experience to the customer and generally assists in minimizing the time that the drivers waste due to standing in the queue. Measurable:It is found that the development of the E-toll system will be successfully implemented within 7 months so that the chances of traffic congestion can generally be reduced successfully. Attainable:It is found that the implementation of E-toll system is considered to be beneficial in achieving the goals and objectives of the project as the electronic toll system reduces traffic congestion and generally enhances the efficiency of the traffic by reducing the time that is wasted by the drivers. Relevant:It is quite necessary to develop proper design report, training manuals as well as project status report in order to successfully implement the E-toll system that further helps in achieving the project objective. Timely:It is quite necessary to finish the implementation of E-toll system within the time period of seven months in order to complete the work of the project quite successfully.
8 PROJECT MANAGEMENT 2.3 Milestone Project milestone is considered as a task of zero duration that generally helps in reflecting that an important achievement within the project will generally accomplished [16]. It is considered as one of the important tool that is generally utilized for delineating a point within a project schedule. It is found that the milestone for the implementation of E-toll system within in the Hyderabad ring road is generally reflected in the table below: MilestoneCompletion date Milestone 1: Completion of initiation phaseThu 13-06-19 Milestone 2:Completion of planning phaseMon 05-08-19 Milestone 3:Completion of designing phase of the projectMon 09-09-19 Milestone 4: Completion of implementation phaseTue 24-12-19 Milestone 5: Completion of execution phaseThu 30-01-20 2.4 WBS A work breakdown structure is one of the important deliverable of the project that helps in properly organizing the work of the project team into a number of manageable sections. As per the PMBOK body of knowledge, it is found that a work breakdown structure is considered as one o the deliverable based hierarchical decomposition that helps decomposing the work of the project properly with the help of the project team [15].Itis found that the work breakdown structure is mainly createdin order to reflect the decomposition of project activities that are helpful in implementing the –toll system in Hyderabad ring road is generally provided in the table that is given below.
9 PROJECT MANAGEMENT WBSTask Name 0Implementation of e-toll system in Hyderabad Ring road 1Initiation phase 1.1Developing business case 1.2Undertaking feasibility study 1.3Establishing charter 1.4Appointing team members 1.5Milestone 1: Completion of initiation phase 2Planning phase 2.1Development of project plan 2.2Development of resource plan 2.3Developing financial plan 2.4Developing quality plan 2.5Developing acceptance plan 2.6Milestone 2:Completion of planning phase 3Designing phase 3.1Developing design for the E-toll system 3.2Sending the design for approval 3.3Getting approval on the project design 3.4Milestone 3:Completion of designing phase of the project 4Implementation phase
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10 PROJECT MANAGEMENT 4.1Connecting in-road sensors 4.2Putting overhead cameras 4.3Connecting toll checker 4.4Vehicle to Roadside Communication 4.5Development of e-toll system 4.6Testing of the system 4.7Milestone 4: Completion of implementation phase 5Closure phase 5.1Post project review 5.2Stakeholder sign off 5.3Documentation 5.4Milestone 5: Completion of execution phase 2.5 Gantt chart Gantt chart is one of the scheduling as well as planning tool that helps in properly assessing the duration of the project and further helps in determining the resources that are needed for planning in order to successfully complete the tasks of the project quite effectively. It is found that there are a number of benefits of using Gantt chart. It is found that the Gantt chart that is generally created for the implementation of the e-toll system in Hyderabad Ring road helps in providing clear picture of the activities that are generally needed to be executed in order to successfully complete the work of the project [12]. On the other hand, it is found that the Gantt chart that is provided below is quite helpful in managing the progress of the project
11 PROJECT MANAGEMENT effectively and it generally helps in reflecting that the project is in the right rack and it will get completed within the expected budget and time. In addition to this the Gantt chart that is provided below reflects on the task dependencies as well as on the time that is generally required in order to execute the work of the project quite successfully. Figure 2: Gantt chart (Source: Created by Author)
12 PROJECT MANAGEMENT Bibliography [1].T. Mawela., N.M Ochara, and H. Twinomurinzi., Missed opportunities for introducing transformationalgovernment:Assessingthecontentiouse-tollprojectinSouth Africa.Transforming Government: People, Process and Policy,10(1), pp.168-188, 2016. [2].A. Hovland., L. Jonasson., P. Garred., A. Yndestad., P. Aukrust., K.T. Lappegård.,T.Espevik,andT.E.Mollnes.,Thecomplementsystemandtoll-like receptorsasintegratedplayersinthepathophysiologyof atherosclerosis.Atherosclerosis,241(2), pp.480-494, 2015. [3].T. Sethi., A.E. Kovach., S.M. Rubinstein., L.Lee., Y. Wang., D.S.Morgan., G.P Greer., C. Vnencak-Jones., and N. Reddy., Correlation of Toll-like Receptor (TLR) and PD-1 Pathways in Central Nervous System Lymphoma: A Clinicopathological Study on Outcomes, 2016. [4].M.S. Marin., S. Quintana., M.R. Leunda., A.C Odeón, and S.E. Pérez., Distribution of bovine alpha-herpesviruses and expression of toll-like receptors in the respiratory system of experimentally infected calves.Research in veterinary science,105, pp.53-55, 2016. [5].L. Lechat., E. Bonnet., L. Queuille., Z. Traoré., P.A. Somé., and V. Ridde., Relevance of a Toll-Free Call Service Using an Interactive Voice Server to Strengthen Health System Governance and Responsiveness in Burkina Faso.International Journal of Health Policy and Management, 2019. [6].M.S. Satyanarayana., Reducing the Waiting Time at Toll Gates Using National E-Tolling System.Engineering and Science,1(2), pp.100-102, 2016.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
13 PROJECT MANAGEMENT [7].M. Schmidt., and M. Goebeler., Innate Immune System Response in Metal Allergy: Toll-Like Receptors. InMetal Allergy(pp. 75-84). Springer, Cham, 2018. [8].C.L. Liu., M.M .Santos., C. Fernandes., M. Liao., K. Iamarene,., J.Y. Zhang., G.K Sukhova., and G.P Shi.,Toll-like receptor 7 deficiency protects apolipoprotein E- deficient mice from diet-induced atherosclerosis.Scientific reports,7(1), p.847, 2017. [9].V. Paschon., S.H.Takada., J.M. Ikebara., E. Sousa., R. Raeisossadati., H. Ulrich, and A.H. Kihara., Interplay between exosomes, microRNAs and toll-like receptors in brain disorders.Molecular neurobiology,53(3) 2016. [10].M.J. Portou., D. Baker., D. Abraham, and J. Tsui., The innate immune system, toll-like receptors and dermal wound healing: a review.Vascular pharmacology,71, pp.31-36, 2015.. [11].Z. She., K. Topping., B. Dong., M.H Shamsi., and H.B. Kraatz., An unexpected use of ferrocene. A scanning electrochemical microscopy study of a toll-like receptor array and its interaction with E. coli.Chemical Communications,53(20), pp.2946-2949, 2017. [12].E. Bagiakou., E. Papaioannou., S. Athanassopoulos, and C. Kaklamanis., Online Collaborative TOll-card-sharing PUblic System, 2016. [13].H.S. Bedi., N. Goyal., S. Kumar, and A. Gupta., Smart Trolley using Smart Phone and Arduino.J Electr Electron Syst,6(223), pp.2332-0796, 2017. [14].M.X. Lee.,Wise shopping with radio frequency identification (RFID) based smart trolley system(Doctoral dissertation, UTAR), 2018.
14 PROJECT MANAGEMENT [15].P.T.Sivagurunathan.,P.Seema.,M.Shalini,andR.Sindhu.,SMART SHOPPINGTROLLEYUSINGRFID.InternationalJournalofPureandApplied Mathematics,118(20), pp.3783-3786, 2018. [16].R.Shaw.,A.Ranjan.,A.Radhakrishnan,andR.SenthilKumar.,Smart Kart.Advances in Computational Sciences and Technology,10(8), pp.2273-2288, 2017.