This project report provides a summary of the steps involved in completing a project for Camden Sickle Cell and Thalassaemia Service Group. It includes a network diagram, stakeholder matrix, work breakdown structure, risk analysis, and methodology analysis. The objective of the report is to provide an overview of project management for the organization.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
EXECUTIVE SUMMARY
The project report summarizes about all steps of completing a project. The task or project is
related to Camden Sickle Cell and Thalassaemia Service Group. In the report different aspects of
project management are summarized in detailed manner including network diagram, matrix of
stakeholders, analysis of risk and many more. The objective of report is to get an overview about
futuristic aspect is relation to project.
The project report summarizes about all steps of completing a project. The task or project is
related to Camden Sickle Cell and Thalassaemia Service Group. In the report different aspects of
project management are summarized in detailed manner including network diagram, matrix of
stakeholders, analysis of risk and many more. The objective of report is to get an overview about
futuristic aspect is relation to project.
Contents
EXECUTIVE SUMMARY.........................................................................................................................2
INTRODUCTION.......................................................................................................................................4
MAIN BODY..............................................................................................................................................4
Task 1 Network Diagram.........................................................................................................................4
TASK 2 Stakeholder Matrix....................................................................................................................8
TASK 3 Work Breakdown Structure.......................................................................................................9
TASK 4 Risk Analysis............................................................................................................................9
TASK 5 determined the measurement to control the event....................................................................11
TASK 6 critically analyze the methodology which would be appropriate for project............................12
CONCLUSION.........................................................................................................................................13
REFERENCES..........................................................................................................................................14
EXECUTIVE SUMMARY.........................................................................................................................2
INTRODUCTION.......................................................................................................................................4
MAIN BODY..............................................................................................................................................4
Task 1 Network Diagram.........................................................................................................................4
TASK 2 Stakeholder Matrix....................................................................................................................8
TASK 3 Work Breakdown Structure.......................................................................................................9
TASK 4 Risk Analysis............................................................................................................................9
TASK 5 determined the measurement to control the event....................................................................11
TASK 6 critically analyze the methodology which would be appropriate for project............................12
CONCLUSION.........................................................................................................................................13
REFERENCES..........................................................................................................................................14
INTRODUCTION
Project management is the method of directing the team's efforts in achieving the targets and
meeting the requirements for performance at a prescribed period. The primary task in project
management is to meet all the aims of the project within the limits set. The report is based on
Camden Sickle Cell and Thalassaemia Service Group’s project. In the report different kinds of
elements of project management are described including network diagram, risk analysis, work
break down structure etc.
MAIN BODY
Task 1 Network Diagram
A network chart illustrates graphically all activities, tasks and workflows for a project. The plan
and flow of activities for the plan are plotted and its progress is monitored by every phase and
completed (Kerzner, 2019). The Thalassemia Service Group and Camden Sickle Cell are
organizations that procure funds to arrange music concerts and inform people. The Sickle Cell
and Thalassemia Treatment Network is one of the key aims of this initiative to collect money for
sustained growth. The network diagram following gives clearer explanation of product start-and-
end day and guarantees the project leader is able to function appropriately. The following lists all
the tasks and timescales used by the project leader to finish the project successfully.
Activities:
Activities Duration (In days) Predecessor
Budget approval 1 -
Hire publicity director 14 1
Hire Set Designer 14 1
Hire Place for Audition 7 2
Advertising to hire Crew and Cast 7 2
Project management is the method of directing the team's efforts in achieving the targets and
meeting the requirements for performance at a prescribed period. The primary task in project
management is to meet all the aims of the project within the limits set. The report is based on
Camden Sickle Cell and Thalassaemia Service Group’s project. In the report different kinds of
elements of project management are described including network diagram, risk analysis, work
break down structure etc.
MAIN BODY
Task 1 Network Diagram
A network chart illustrates graphically all activities, tasks and workflows for a project. The plan
and flow of activities for the plan are plotted and its progress is monitored by every phase and
completed (Kerzner, 2019). The Thalassemia Service Group and Camden Sickle Cell are
organizations that procure funds to arrange music concerts and inform people. The Sickle Cell
and Thalassemia Treatment Network is one of the key aims of this initiative to collect money for
sustained growth. The network diagram following gives clearer explanation of product start-and-
end day and guarantees the project leader is able to function appropriately. The following lists all
the tasks and timescales used by the project leader to finish the project successfully.
Activities:
Activities Duration (In days) Predecessor
Budget approval 1 -
Hire publicity director 14 1
Hire Set Designer 14 1
Hire Place for Audition 7 2
Advertising to hire Crew and Cast 7 2
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Hire Production and Publicity Crew 28 4, 5
Set Designed and Build 35 3, 6
Train Production Crew 12 3, 6
Audition to hire cast 2 4, 5
Cast Rehearsal 66 9
Hire Orchestra 7 1
Music 7 1
Photograph Cast and Crew and Collect Biographies 35 6, 9, 11
Enter information into computer 1 13
Printing 5 14
Develop an advertising plan 7 6
Advertising Media 21 16
Orchestra Rehearsal 4 12
Order Costumes 7 9
Costume Parade and Alteration 5 7, 19
Dress Rehearsal 1 8, 10, 18, 20
Performance 10 15, 17, 21
Set Designed and Build 35 3, 6
Train Production Crew 12 3, 6
Audition to hire cast 2 4, 5
Cast Rehearsal 66 9
Hire Orchestra 7 1
Music 7 1
Photograph Cast and Crew and Collect Biographies 35 6, 9, 11
Enter information into computer 1 13
Printing 5 14
Develop an advertising plan 7 6
Advertising Media 21 16
Orchestra Rehearsal 4 12
Order Costumes 7 9
Costume Parade and Alteration 5 7, 19
Dress Rehearsal 1 8, 10, 18, 20
Performance 10 15, 17, 21
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
TASK 2 Stakeholder Matrix
A stockholder matrix is a tool of change to assess the project activities in order to identify steps
that correspond to the project. Stockholder analysis can help the strategy to consider all
stakeholders' priorities that could be affected or shaped by the plan (Layton, Ostermiller and
Kynaston, 2020). Camden Sickle Cell and Thalassemia Support Community have implemented
this stockholder information to better them recognize the interests and forces of each stockholder
in order to minimize potential negative outcomes and manage negative stakeholders. There are
many internal and external stakeholders who have specified their influence and interest
accordingly below. This graph with some clarification is given below:
High power, High Interest (Manage closely): This Project Manager matrix involves corporate
managers, promoters and partners who are extremely interested and willing to take strategic
choices. The people monitor the whole job very closely to ensure that each task is carried out
according to their schedule.
High Power, Low Interest (Keep Informed): In this process, those parties involved were those
who are influential but less interested in the market plan like vendors, the audience, etc.
Low Power, High Interest (Keep Satisfied): This involves those with low power and high
importance, like staff, public administration, media, industry, etc. They are comfortable with the
organizational function and accomplish their mission (Lock, 2020).
A stockholder matrix is a tool of change to assess the project activities in order to identify steps
that correspond to the project. Stockholder analysis can help the strategy to consider all
stakeholders' priorities that could be affected or shaped by the plan (Layton, Ostermiller and
Kynaston, 2020). Camden Sickle Cell and Thalassemia Support Community have implemented
this stockholder information to better them recognize the interests and forces of each stockholder
in order to minimize potential negative outcomes and manage negative stakeholders. There are
many internal and external stakeholders who have specified their influence and interest
accordingly below. This graph with some clarification is given below:
High power, High Interest (Manage closely): This Project Manager matrix involves corporate
managers, promoters and partners who are extremely interested and willing to take strategic
choices. The people monitor the whole job very closely to ensure that each task is carried out
according to their schedule.
High Power, Low Interest (Keep Informed): In this process, those parties involved were those
who are influential but less interested in the market plan like vendors, the audience, etc.
Low Power, High Interest (Keep Satisfied): This involves those with low power and high
importance, like staff, public administration, media, industry, etc. They are comfortable with the
organizational function and accomplish their mission (Lock, 2020).
Low Power, Low Interest (Minimal Contact): This process of project plan brings together
people who have low cost and high involvement which has limited communication with others
on market issues. Such as clients, leaders, visitor etc.
TASK 3 Work Breakdown Structure
A project management and system development work-breakdown arrangement is a can it
division into simple fragments. A job detailed breakdown is an essential project that organizes
the work of the team through manageable components (Rowe, 2020). The music concert
management uses the job deliverable oriented to identify his job to succeed. WBS is best
underplaying below and accompanied either by music festival project leader.
people who have low cost and high involvement which has limited communication with others
on market issues. Such as clients, leaders, visitor etc.
TASK 3 Work Breakdown Structure
A project management and system development work-breakdown arrangement is a can it
division into simple fragments. A job detailed breakdown is an essential project that organizes
the work of the team through manageable components (Rowe, 2020). The music concert
management uses the job deliverable oriented to identify his job to succeed. WBS is best
underplaying below and accompanied either by music festival project leader.
TASK 4 Risk Analysis
Risk Impact Mitigation strategy
Personal theft High Event organizers or micro owners already mindful
about burglary, so they can be mindful about their
personal items in concert.
Hearing damage High The high level of sound in concert will contribute to
a lot of ear injury. Manager must make sure publics
are separated from structures of music.
Violence and Altercation Low In order to avoid abuse, project managers have also
organized wards at different stages.
Slip and Fall injuries Medium Make sure that there are no casualties at the stage,
and before the final show, it is of the upmost priority
for the rehearsal.
Fire and Smoke Inhalation Low Smoke consumption must be limited to a minimum
and ensure it impacts anybody.
Food Poisoning Low Quality of the food must be great and chefs must
concentrate on food and sanitation performance.
Illicit Drug use Low In the musical concert region, narcotics are
specifically banned.
Heat exhaustion Medium Health services are still accessible and the risks of
humans collapsing due to heat stress are low.
Dehydration High Due to the high ambient noises, citizens begin to
love the performance or appreciate the dance.
Technical issues Medium In terms of making sure that each scientific
instrument has not encountered any challenging task,
Risk Impact Mitigation strategy
Personal theft High Event organizers or micro owners already mindful
about burglary, so they can be mindful about their
personal items in concert.
Hearing damage High The high level of sound in concert will contribute to
a lot of ear injury. Manager must make sure publics
are separated from structures of music.
Violence and Altercation Low In order to avoid abuse, project managers have also
organized wards at different stages.
Slip and Fall injuries Medium Make sure that there are no casualties at the stage,
and before the final show, it is of the upmost priority
for the rehearsal.
Fire and Smoke Inhalation Low Smoke consumption must be limited to a minimum
and ensure it impacts anybody.
Food Poisoning Low Quality of the food must be great and chefs must
concentrate on food and sanitation performance.
Illicit Drug use Low In the musical concert region, narcotics are
specifically banned.
Heat exhaustion Medium Health services are still accessible and the risks of
humans collapsing due to heat stress are low.
Dehydration High Due to the high ambient noises, citizens begin to
love the performance or appreciate the dance.
Technical issues Medium In terms of making sure that each scientific
instrument has not encountered any challenging task,
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
it should be checked and evaluated.
Financial risk Moderate The Project manager will ensure that each operation
is performed in the budget specified.
Accident Low Pop festival plans and meets all prevention protocols
in order to avoid collisions with healthcare facilities
(Owusu, Chan and Shan, 2019).
Congestion High This is the main challenge, but it can be mitigated by
careful planning and orderly entry.
Climate issue Medium Pop festivals take place in open space to impact the
entire concert through global warming like rainfall or
severe winds. So, until establishing the music festival
time, weather prediction is critical.
Uncertain incident with
Crew members
Low Members of the crew will be uncomfortable on the
day of the music event; they must plan backup.
Damage resources of music
concert
High Both plans must be correct and individuals must
know that concert services are not detrimental to
audiences.
Physical injury Low Because of high crowds, physical injury risks arise.
So the project manager trains for emergency support
now.
Social impact High This music festival does not produce a detrimental
effect by the project leader.
Operational risk Medium Both members of the team must verify that the study
is carried out in compliance with effective
guidelines.
Workforce High Executives must recruit individuals with the requisite
Financial risk Moderate The Project manager will ensure that each operation
is performed in the budget specified.
Accident Low Pop festival plans and meets all prevention protocols
in order to avoid collisions with healthcare facilities
(Owusu, Chan and Shan, 2019).
Congestion High This is the main challenge, but it can be mitigated by
careful planning and orderly entry.
Climate issue Medium Pop festivals take place in open space to impact the
entire concert through global warming like rainfall or
severe winds. So, until establishing the music festival
time, weather prediction is critical.
Uncertain incident with
Crew members
Low Members of the crew will be uncomfortable on the
day of the music event; they must plan backup.
Damage resources of music
concert
High Both plans must be correct and individuals must
know that concert services are not detrimental to
audiences.
Physical injury Low Because of high crowds, physical injury risks arise.
So the project manager trains for emergency support
now.
Social impact High This music festival does not produce a detrimental
effect by the project leader.
Operational risk Medium Both members of the team must verify that the study
is carried out in compliance with effective
guidelines.
Workforce High Executives must recruit individuals with the requisite
skills to support archive project objectives.
TASK 5 determined the measurement to control the event.
Quality expectation- The Music Concert project team is scheduled to complete this project in
101 days and, if done faster, it will be helpful (Müller, Drouin and Sankaran, 2019). Both
operations must be performed by the Camden Sickle Cell and Thalassemia Service Group inside
the specified timeframe and in the volume and plan supported by an additional 5000 appointment
fees. The team leader also guarantees that all projects are provided by the vendors of quality
products and guarantees they are successful.
Acceptance criteria- For this activity to be done, the organizer set the requirements for hiring
anyone for this performance activity. In order to minimize the risks of error all results must be
really exciting and well proven. The team of photographers wants to make sure that they cover
the whole festival and that no activity is missed.
Quality specification- This assessment or control by the project leader by the creation of quality
criteria. Where nutrition, phase, raw materials, results, developers etc. are assured to achieve
project aims and objectives as per minimum requirements.
TASK 6 critically analyze the methodology which would be appropriate for project
The project leaders will use many methods and some of them listed hereafter:
Waterfall: The waterfall methodology splits the project operations into linear sequential stages,
where each step relies upon the viable product of the initiation section. The method is common
of some fields of engineering. Waterfall is a linear, sequential software development tool in
which transition causes current flows like a fountain. This is one of the traditional project
management approaches. Due to the absence of flexibility in earlier phase of production, it has
also emerged for the construction industry, but because of structured external surroundings it has
acquired joyfully more value. In regards to above project, this technique can be used in order to
complete the project in less time and more effective manner. Though, this is a complex way to
manage the project but it produces better and accurate outcome of project.
TASK 5 determined the measurement to control the event.
Quality expectation- The Music Concert project team is scheduled to complete this project in
101 days and, if done faster, it will be helpful (Müller, Drouin and Sankaran, 2019). Both
operations must be performed by the Camden Sickle Cell and Thalassemia Service Group inside
the specified timeframe and in the volume and plan supported by an additional 5000 appointment
fees. The team leader also guarantees that all projects are provided by the vendors of quality
products and guarantees they are successful.
Acceptance criteria- For this activity to be done, the organizer set the requirements for hiring
anyone for this performance activity. In order to minimize the risks of error all results must be
really exciting and well proven. The team of photographers wants to make sure that they cover
the whole festival and that no activity is missed.
Quality specification- This assessment or control by the project leader by the creation of quality
criteria. Where nutrition, phase, raw materials, results, developers etc. are assured to achieve
project aims and objectives as per minimum requirements.
TASK 6 critically analyze the methodology which would be appropriate for project
The project leaders will use many methods and some of them listed hereafter:
Waterfall: The waterfall methodology splits the project operations into linear sequential stages,
where each step relies upon the viable product of the initiation section. The method is common
of some fields of engineering. Waterfall is a linear, sequential software development tool in
which transition causes current flows like a fountain. This is one of the traditional project
management approaches. Due to the absence of flexibility in earlier phase of production, it has
also emerged for the construction industry, but because of structured external surroundings it has
acquired joyfully more value. In regards to above project, this technique can be used in order to
complete the project in less time and more effective manner. Though, this is a complex way to
manage the project but it produces better and accurate outcome of project.
Six Sigma- It provides companies with the knowledge to build their business operations. This
rise in efficiency and decline in process variations helps to reduce errors and boost income,
employee morals and goods or services quality. This attempt to improve the consistency by
reducing the number of mistakes in the process by identifying what was not working and then
withdrawing it from the process. It uses methods for quality management that are mostly
quantitative and testing that is often used by specialists in those methods. In the context of
project of Camden Sickle Cell and Thalassaemia Service Group’s project, this method can be
useful for minimizing errors and enhancing income for stakeholders.
Agile- AGILE is a practice that encourages addition to a strong iteration and checking during the
project application development period. Unlike the waterfall methodology the Agile model
incorporates development and testing practices (Pollard, 2019). Agile is one of the most
recognized methods for organizing tasks. It is suitable for flexible and progressive tasks. It is a
form of system where the combined activities of self-organization or cross-organization –
functional and consumer are created. The software is initially designed to fix the shortcomings of
the Waterfall solution. In the context of project of Camden Sickle Cell and Thalassaemia Service
Group’s project, this technique can be useful for managing overall duration of project and for
completing all tasks in an effective manner.
• Recognize consumer market transition
• Enhancing services and efficiency
• Waste and cost recovery
• The change continues
• Solid goods and procedures
• Enhancing productivity
rise in efficiency and decline in process variations helps to reduce errors and boost income,
employee morals and goods or services quality. This attempt to improve the consistency by
reducing the number of mistakes in the process by identifying what was not working and then
withdrawing it from the process. It uses methods for quality management that are mostly
quantitative and testing that is often used by specialists in those methods. In the context of
project of Camden Sickle Cell and Thalassaemia Service Group’s project, this method can be
useful for minimizing errors and enhancing income for stakeholders.
Agile- AGILE is a practice that encourages addition to a strong iteration and checking during the
project application development period. Unlike the waterfall methodology the Agile model
incorporates development and testing practices (Pollard, 2019). Agile is one of the most
recognized methods for organizing tasks. It is suitable for flexible and progressive tasks. It is a
form of system where the combined activities of self-organization or cross-organization –
functional and consumer are created. The software is initially designed to fix the shortcomings of
the Waterfall solution. In the context of project of Camden Sickle Cell and Thalassaemia Service
Group’s project, this technique can be useful for managing overall duration of project and for
completing all tasks in an effective manner.
• Recognize consumer market transition
• Enhancing services and efficiency
• Waste and cost recovery
• The change continues
• Solid goods and procedures
• Enhancing productivity
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
CONCLUSION
On the basis of above project report this can be concluded that project management is one of the
key part for any kinds of project. It is important for companies to apply all necessary aspect of
project management in their project so that their project can be completed in less time and cost.
The report articulates about different kinds of elements like risk analysis, stakeholder analysis
and many more for better management of project of Camden Sickle Cell and Thalassaemia
Service Group.
On the basis of above project report this can be concluded that project management is one of the
key part for any kinds of project. It is important for companies to apply all necessary aspect of
project management in their project so that their project can be completed in less time and cost.
The report articulates about different kinds of elements like risk analysis, stakeholder analysis
and many more for better management of project of Camden Sickle Cell and Thalassaemia
Service Group.
REFERENCES
Kerzner, H., 2019. Using the project management maturity model: strategic planning for project
management. John Wiley & Sons.
Layton, M.C., Ostermiller, S.J. and Kynaston, D.J., 2020. Agile project management for
dummies. John Wiley & Sons.
Lock, D., 2020. Project management. Routledge.
Rowe, S.F., 2020. Project management for small projects. Berrett-Koehler Publishers.
Owusu, E.K., Chan, A.P. and Shan, M., 2019. Causal factors of corruption in construction
project management: An overview. Science and engineering ethics, 25(1), pp.1-31.
Müller, R., Drouin, N. and Sankaran, S., 2019. Modeling organizational project
management. Project Management Journal, 50(4), pp.499-513.
Pollard, C.E., 2019. Lessons learned from client projects in an undergraduate project
management course. Journal of Information Systems Education, 23(3), p.3.
Kerzner, H., 2019. Using the project management maturity model: strategic planning for project
management. John Wiley & Sons.
Layton, M.C., Ostermiller, S.J. and Kynaston, D.J., 2020. Agile project management for
dummies. John Wiley & Sons.
Lock, D., 2020. Project management. Routledge.
Rowe, S.F., 2020. Project management for small projects. Berrett-Koehler Publishers.
Owusu, E.K., Chan, A.P. and Shan, M., 2019. Causal factors of corruption in construction
project management: An overview. Science and engineering ethics, 25(1), pp.1-31.
Müller, R., Drouin, N. and Sankaran, S., 2019. Modeling organizational project
management. Project Management Journal, 50(4), pp.499-513.
Pollard, C.E., 2019. Lessons learned from client projects in an undergraduate project
management course. Journal of Information Systems Education, 23(3), p.3.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 out of 18
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.