Running head: PROJECT MANAGEMENT
Project Management
Name of Student
Name of University
Author Note
Project Management_1

1
PROJECT MANAGEMENT
Table of Contents
Introduction..........................................................................................................................2
1. Project Objectives............................................................................................................2
2. Scope of the Project.........................................................................................................2
3. Work Breakdown Structure (WBS).................................................................................3
4. Duration of Each Activity................................................................................................4
4.1. Gantt Chart................................................................................................................5
5. Cost for Each Activity.....................................................................................................6
6. Assumptions....................................................................................................................9
Conclusion...........................................................................................................................9
Bibliography......................................................................................................................11
Project Management_2

2
PROJECT MANAGEMENT
Introduction
The report aims in development of a schedule and cost plan for five friends who are
travelling to Sydney for a holiday for 3 days. For this project, a schedule for 72 hours has been
prepared. Certain assumptions are made while developing the schedule for the project. The
report identifies the scope and objectives of the project and delivers a work breakdown structure.
The sequence of activities are presented in the report in form of a work breakdown structure. A
schedule Gantt chart has been prepared for the project as well. The cost of each and every
activities of the tour is calculated and the details are indicated in form of a cost table.
1. Project Objectives
The objectives “Travelling to Sydney” project are as follows-
To develop a schedule for the Project
To estimate the time required for completion of each activity
To estimate the cost of the entire project
2. Scope of the Project
The in-scope requirements of “Travelling to Sydney” project are as follows-
To ascertain that the project is completed in 72 hours
To ascertain that the project is executed in the allocated budget. Each friend has a
budget of AUD 1500, which indicates that the total budget of the project is AUD
7500
The schedule estimate includes the travelling and the resting time
The out-scope requirements of the project are as follows-
Project Management_3

3
PROJECT MANAGEMENT
The estimation has no scope for adding other activities apart from those
mentioned in the schedule
There is no scope of extending the holiday as the budget of the project is fixed
The schedule estimation is done considering both in-scope and out-scope requirements of
the project. Certain assumptions are considered for developing the schedule of the project, which
are discussed in the later section of this report.
3. Work Breakdown Structure (WBS)
The WBS of the project, generated from project scheduling is represented in the picture
below-
Travelling to Sydney
Start of Journey
Ariving at Sydney
Checking in to the
Hotel
Day 1 Activities
Breakfast in Hotel
Walking tour in
Darling Harbour
Walking Tour in
Circular Quay
Lunch
Boating Tour of
Sydney Harbour
Travelling to
Cockatoo Island and
Sight Seeing
Returning to Hotel
Dinner
Resting At hotel
Day 2 Activities
Breakfast in Hotel
Tour to museum of
Sydney
Lunch
Visiitng the Sydney
Cricket Ground
Travelling to Garigal
National Park and
sight seeing
Returning to Hotel
Dinner
Taking Rest
Day 3 Activities
Breakfast
Travelling to Bondi
Beach
Sight Seeing to
Sydney Botanic
Gardens
Lunch
Visiting the Rocks
Dinner
Checking out of the
hotel
Travelling back and
taking rest
End of the Journey
Figure 1: Showing the Work Breakdown Structure of Travelling to Sydney Project
The work breakdown structure in the figure above represents the works to be completed
in a time span of three days.