Running head: PROJECT MANAGEMENT
IT Waste Management System
Name of the Student:
Name of the University:
IT Waste Management System_1

1PROJECT MANAGEMENT
Executive Summary
IT waste management system is used in supermarket to eliminate solid waste with challenges of
air and water pollution. In order to overcome with this waste disposal issues, the system is
developed. The report will discuss aspects to develop the waste management system by
analyzing stakeholder analysis, scope management, time, and cost along with risk management
plan. Stakeholder analysis is used to classify key plan stakeholders with their interest and
expectations in the project. The scope management plan determined the project work
throughout project lifecycle. It is used to identify project activities included in development of
proposed system. Time management plan is used to manage project schedule and cost
management plan is used to determine total project cost based on project activities. Risk
management plan is used to classify, evaluate besides control project risks. Importance in
addition benefits of waste management system is elaborated in this report with software
development lifecycle model used to create the development plan. The start date of the project
is 3rd September, 2019 besides end date is 3rd April, 2020 with total period of the project is 154
days.
IT Waste Management System_2

2PROJECT MANAGEMENT
Table of Contents
1. Overview.................................................................................................................................. 4
1.1 Introduction........................................................................................................................ 4
1.2 Historical background.........................................................................................................4
1.3 Purpose of the report..........................................................................................................4
1.4 Scope of the report............................................................................................................. 4
2. Key Deliverables...................................................................................................................... 4
Project Charter......................................................................................................................... 4
2.1 Proof of concept.................................................................................................................6
2.2 Stakeholder Analysis..........................................................................................................8
2.2.1 Stakeholder Management............................................................................................8
2.2.2 Stakeholder Analysis.................................................................................................10
2.2.3 Communication Plan..................................................................................................13
2.2.4 Close with a summary...............................................................................................15
2.3 Develop scope management plan....................................................................................15
2.3.1 Scope management...................................................................................................15
2.3.2 Literature review........................................................................................................15
2.3.3 Functional and non-functional requirements of the waste management system........16
2.3.4 WBS baseline............................................................................................................ 18
2.3.5 Summary................................................................................................................... 20
2.4 Schedule Baseline............................................................................................................ 20
2.4.1 Importance and need to manage time of the project..................................................20
2.4.2 Schedule baseline.....................................................................................................21
2.4.3 Summary................................................................................................................... 23
2.5 Network Diagram............................................................................................................. 23
2.5.1 Definition of the network diagram...............................................................................23
2.5.2 Summary................................................................................................................... 25
IT Waste Management System_3

3PROJECT MANAGEMENT
2.6 Cost management plan....................................................................................................25
2.6.1 Importance of cost management plan........................................................................25
2.6.2 Cost baseline............................................................................................................. 25
2.6.3 Function point costing method chosen.......................................................................31
2.6.4 Summary................................................................................................................... 31
2.7 Risk Management Plan....................................................................................................31
a. Risk Register.................................................................................................................. 31
b. Risk identification in IT waste management project........................................................32
c. Six risk factors................................................................................................................ 32
2.7.1 Risk Register............................................................................................................. 34
2.7.2 Summary................................................................................................................... 35
3. Conclusion............................................................................................................................. 36
References................................................................................................................................ 37
Appendix.................................................................................................................................... 39
1. Agenda and minutes.......................................................................................................... 39
2. Timesheet.......................................................................................................................... 48
IT Waste Management System_4

4PROJECT MANAGEMENT
1. Overview
1.1 Introduction
IT waste management system is a process to extract parts of wastes to sell and reuse the
wastage materials. The e-waste materials are valuable as well as recyclable. In the
supermarket, organic wastes are increasing from increase in human population as well as
urbanization. The supermarkets are increasing awareness among the customers on
environmental. This awareness concerns with disposal of organic wastes. The proposed waste
management system included reduction of total waste amount by reducing and recycling of
waste materials. This system re-introduces organic waste in natural cycle.
1.2 Historical background
IT waste management system is developed in supermarkets so that its organic wastes are
eliminated. The supermarket is facing challenges of air and water pollution due to organic
wastes generated from the market. The system is used to collect, treat as well as dispose of
organic materials discarded. Improper disposal of organic wastes create unsanitary conditions
and those conditions lead to pollution of environment. The organic waste management is
presented with technical challenges. Those wastes create social, economic as well as
administrative issues that are being managed and eliminated. The technical advances are
continued through half of 20th century with development of garbage bins and pneumatic
collection system. Improper storage of organic waste caused problems to pollution as well as
public health. Landfills are designed to minimize risks towards public health and surroundings.
Modern waste management system is developed to recycle and reduce waste at source slightly
than land removal.
1.3 Purpose of the report
The purpose of this particular project report is to deliver organized project strategy for
demonstrating IT waste management system for supermarkets. This system would eliminate
organic wastes and provide a waste free environment.
1.4 Scope of the report
The opportunity of this particular report is to develop waste management system for
supermarkets. This project plan provided with key deliverables, scope management,
stakeholder analysis, and cost and schedule management plan. Finally, this plan provided with
risk management plan. Project management theories are applied in each project management
plans to demonstrate the project work efficient manner.
2. Key Deliverables
Project Charter
Project Title: Waste Management System for managing organic waste in Supermarket
Date: 6th September, 2019
Project Description:
IT Waste Management System_5

5PROJECT MANAGEMENT
The project is reflected on analyzing the organic waste in the supermarket. The waste is threat
to the health of human beings and quality of surrounding environment. The waste management
system is proposed as IT system to accomplish the organic waste. The organic waste
management system is used to collect and treat the organic wastes. It is provided with solutions
to the recycle items which are not belonged to garbage. Recycling is a method in organic waste
management where the waste items are being processed and cleaned. Recycling process is
used to convert waste materials in new materials. It saves the materials and also helps to low
the emissions of greenhouse gases.
Project Manager: Please enter your name
Project Objectives:
Following are the project objectives based on which entire project plan is carried out:
Propose of waste management system to manage the organic waste in supermarket
Storage, collect and disposal of the waste generated in supermarket and surroundings
Improve environmental health and provide solid free living environment
Implementation of lean software lifecycle for quick development of environment
Conversion of waste materials in new materials and lower the greenhouse gas
emissions
Reuse of the organic waste in form of recycling
Major deliverable schedule:
Project plan documentation- 1 month
Development of waste management system- 3 months
Recycling of the organic waste- 2 months
Purchasing of required equipments- 1 months
Critical success factors:
Lessening the dissatisfaction rate of the population of Victoria by 50%
Development of the waste management system to meet 60% requirements of the project
clients
Completion of the project plan in 7 months in estimated project budget
Improvement of the environmental waste and lessen greenhouse gases emission by
50% by next year
Assumptions:
The supermarket has no waste management system to manage their organic waste
before conducting this project
The supermarkets are complied with emerging regulations and incorporated food waste
recycling in waste management programs.
The waste management system has significant importance for improving the
environmental health.
Constraints:
Schedule constraints due to delay in one of the project activities
Budget constraints due to sudden addition of extra project resources
Scope constraints because of sudden modification in the development scope by the
project client
IT Waste Management System_6

6PROJECT MANAGEMENT
Risks:
i. Scope creep can affect the improvement of the project plan
ii. The development of waste management system might cause overrun of project budget.
iii. The development work is not finished on scheduled time.
iv. Lack of resources those have technical skills to implement waste management system.
Key roles and responsibilities:
Please enter your name: Playing the role of project manager to plan, schedule, execute, control
and monitor the entire project plan
Please enter name of the project team member: Providing project related ideas to other team
members
Please enter name of the project team member: Communication with the IT departments
Please enter name of the project team members: Collecting the project related ideas an
providing suggestions and taking feedback from the supermarket employees
Approvals:
The government of Victoria State has approved the development plan and the project sponsor
approved the development budget and other project documents.
2.1 Proof of concept
1. What waste management issue are you wanting to manage and explain the importance
of the waste issue? (For this question research must be presented to support your
decision.)
In this project, we are going to manage the organic waste for the supermarket. The
selected waste issue is organic food waste. The organic waste is contained food waste;
serve to avoid contamination among waste as well as environment. This waste issue
provides impact on environment. The waste is threat to the health of human beings and
quality of surrounding environment.
2. Outline what system/product you want to develop to support the waste issue you have
identified in 1. above.
The organic waste management system is used to collect and treat the organic wastes. It
is provided with solutions to the recycle items which are not belonged to garbage.
Recycling is a method in organic waste management where the waste items are being
processed and cleaned before it is recycled. This process is aimed to reduce energy
losses, new materials consumption plus reduction of landfills.
IT Waste Management System_7

7PROJECT MANAGEMENT
3. Explain the usefulness of the system to the stakeholders.(NB: remember the KISS
principle.)
To the project stakeholders, usefulness of organic waste management system is
explained to them so that the system provides storage, collect and disposal of the waste
generated in supermarket and surroundings. The proposed system is important to improve
environmental health and provide solid free living environment.
4. a. Identify and describe the software development lifecycle (in brief) you will use and
explain why your team chose this lifecycle.
Lean software development is used as software development lifecycle. The development
team has selected this lifecycle as it relies on the practices used in lean manufacturing
environment for establishing effective and quick development culture. This technique is
used to eliminate waste, make decisions, deliver fast, empower the team and view the
development by using the waste management system.
b. At each phase on the SDLC explain what part of the system will be developed. (In
brief)
The lean project team is aimed to improve over the project plan by eliminating organic
waste in the supermarket. The phases of lean SDLC are:
Planning and requirements: It is the initial step of the SDLC where the requirements of
project clients are collected.
Iteration plan: It is the event where the project team members can determine how the
team backlog can commit to deliver through the iteration.
Implementation: The project team uses the project management tools for performing the
project tasks. It is required to imagine workflow as it is not possible to detect with project
problems. The project developers are required to avoid waste on earlier stages.
Testing: The tests are required for the lean projects. It helps the plan developers to deliver
products to the clients on scheduled period.
Eliminate waste: The project team can analyse work, detects the actions and avoid waste
at the time of next iterations.
5. Describe how the waste issue you have identified for your project (from 1. Above) will be
managed by the new system/product. (This can be as simple as numbered points clearly
IT Waste Management System_8

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Integration Management
|47
|9786
|398

Construction of a Solar Energy System: Project Management
|40
|6093
|199

Project Management Assignment PDF
|35
|5405
|67

Development of Information System in Healthcare Industry
|44
|10574
|172

Network Security Plan for First National University
|51
|10015
|210

(PPMP20008) Office Renovation at Southern Cross
|33
|5476
|76