Project Management and Risk: A Comprehensive Analysis of Hostel Construction for Homeless Young Adults

Verified

Added on  2024/06/10

|17
|3675
|407
AI Summary
This report delves into the intricacies of project management, focusing on the construction of a hostel for homeless young adults in a specific London borough. It examines the application of a Gantt chart to illustrate the project's schedule and tasks, critically analyzes two project methodologies (Waterfall and Agile), and evaluates their suitability for the project. The report further explores a risk register template, highlighting legal and non-legal solutions to potential risks that could impact the project's timely delivery. Additionally, it discusses two potential issues faced when leading and managing a project team, outlining strategies to alleviate them. This comprehensive analysis provides valuable insights into the challenges and solutions associated with managing a complex construction project.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Project Management and Risk
1

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of Contents
Introduction:................................................................................................................................3
1. Using the Work Breakdown Structure (WBS) and task decomposition from the first part of
your assessment, devise a Gantt chart showing a graphical illustration of your project’s tasks
and the agreed schedule...............................................................................................................4
2. Critically discuss at least two project methodologies and decide which one will best suit
your project and why?.................................................................................................................5
2. Using a recognized risk register template of choice, critically discuss at least two legal and
non-legal solutions that may impact on the timely delivery of your project...............................9
3. Discuss at least two potential issues you may face when leading and managing your project
team. For each potential issue, explain what strategy you will adopt to alleviate it.................13
Conclusion:....................................................................................................................................15
References......................................................................................................................................16
2
Document Page
Introduction:
This report introduces the concept of project management. This report is focusing on the
construction of the Hostel for the homeless young grown-ups in the specific London borough.
This assignment presents a Gantt chart which is showing the graphical illustration of the
project’s schedule and tasks. In addition to this, the assignment highlights two project
methodologies which are Waterfall and Agile methodology for completing the project in
asuccessfulmanner. This report also shows the risk register template and non-lawful and lawful
solutions for developing this project. Moreover, this report highlights the issues which are faced
in the process of handling and leading a team with the effective and efficient solutions.
3
Document Page
1. Using the Work Breakdown Structure (WBS) and task decomposition from the first part
of your assessment, devise a Gantt chart showing a graphical illustration of your project’s
tasks and the agreed schedule
A Gantt chart:
Time Schedule - July - December 2018
Activities July August September October November December
Design
Structural
Utilities
Finishing
The above Gantt chart is prepared as per the specified work break down structures in part one.
The Gantt chart gives as a pictorial presentation regarding the activities undertaken in the
completion of the construction of the hostel for the homeless young adults. Each activity
required to complete in the set time frame so that the project can be completed in given time an
there is no wastage old resources. The above specifies Gantt chart is of 6 months which are
starting from July to December. Hence, a Gantt chart is essential for the project management.
The above specified Gantt chart is important for the construction of the hostel project as it
specifies all the activities. The Gantt chart also provides w clear insights regarding the
construction. each activity is important as it laid attention on the key aspect of the project. It is
important to keep in mind that project is essential so is its completion in set time frames. A
project is having numerous stages each of them is required to be followed in a correct manner.
4

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
The chart shown above is a graphical presentation which examines the activities which are
undertaken to complete the project in a well organized and effective manner. A Gantt chart is an
essential tool for the management of risk and completion of the project as it examines all the
necessary stages which are required to be undertaken for running a construction project of hostel
for the homeless young adults. Moreover, it is important to note that managing a project is an art
which is required to be adopted by the project manager and the project team. Gantt chart is one
of the most widely used tools in the fields of project management be it any kind of project. The
above Gantt chart is significant for the overall project completion in a well organized manner.
The work break down structure and time scale are the pre-essentially of the Gantt chart and
without them a Gantt chart cannot be completed in an appropriate manner. The chart is required
to be made by looking into all the time factors and barriers which can be faced in the procedure
of the completion of the project. It is essential to decide the scope and objective of the project
for devising a Gantt chart. The chart is showing distribution of activity in each month .deciding
the design of the project is a 1 month task and can be done in that specified time while the
structure of the hostel will be completed in the time span of 2 months which is important as
deciding structure is a complicated task . Similarly the other activities will take the remaining 3
months time in the success of the project. Without a Gantt chart a project cannot be completed.
hence, Gantt chart is an essential part of the project management and will be required for the
construction of the hostel for the homeless young adults who are suffering from mental disorder
and are involved in drugs in London.
5
Document Page
2. Critically discuss at least two project methodologies and decide which one will best suit
your project and why?
In the context of Hostel construction project for the homeless young adults the two project
methodologies which will be used consist of:
Waterfall or Traditional Project Management
Waterfall project management is considered to be the most common method of the construction
project management methods. Alternatively recognized as traditional project management, this
method comprises clear mileposts among each assignment there are fixed due days,
deliverables, and customer outlooks prearranged on the perfect timeline. The waterfallis the
methodical approach; one cannot construct a bathroom in the house without primary constructing
the household’s foundation. It can be understood like this: if the project is chronological,
considering traditional project management will be beneficial. Greatly like a genuine waterfall,
workflow procedure will travel downward in the direction of completion; think of each phase or
stage of end as its specific tier that “water” or end must wholly flow over before falling down to
the subsequent activity .this method is one of the most utilized method in the construction project
as it gives a clear picture regarding the cost of inputs and the outcomes (Turner, 2016).
Advantages:
This methodology is easy to understand and simple
In this methodology, the stages are managed and accomplished one at a time. Stages do
not intersect.
This methodology is very easy to manage to owe to the rigidity of this methodology-
each stage is having precise deliverables and a review procedure
This methodology is best fitted for the smaller projects where the necessities are very
well assumed
Disadvantages:
There is a high level of risk and uncertainty
This methodology is not suitable for ongoing and long projects
6
Document Page
Once the applications in the testing phase, it is actually difficult to go back and vary
something that was nit well planned out in the conceptual phase.
This methodology is not good for complicated and goal oriented projects
Agile methodology:
The AGILE methodology is the practice which encourages the uninterrupted iteration of
expansion and testing during the course of the software development lifespan of a project. The
Agile software development methodology is the procedure for emerging software. Though, agile
methodology varies meaningfully from other approaches. In English, Agile denotes to a
capability to move rapidly, easily and responding promptly to variation – this is considered to be
the most important aspect of the agile software development. Agile method infers an incremental
and iterative method of the management. It laid emphases on assisting teams in a developing
background and upholding the concentration on speedy delivery of corporate importance. The
methodologies which are utilized in the agile project management are the Kanab, XP,
Scrum, and others. All of them follow the Agile Platform which is grounded on continuous
enhancement, suppleness, the input of the group, and the delivery of outcomes with great value.
The agile software expansion underlines on the four central values and they are Team and
Individual communications over tools and processes, Operational software over wide-ranging
credentials, Consumer association over agreement arbitration and Replying to variation over
following the proposal (Soni and Kohli, 2017)
Advantages:
Face-to-face discussion is the finest form of interaction.
Close, ever collaboration among business persons and designers.
Uninterrupted attention towards the technical superiority and good scheme.
Unvarying adaptation to varying surroundings.
Even late variations in necessities are greeted (Soni and Kohli, 2017).
Disadvantages:
7

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
There is a lack of attention on necessary documentation and design
The project can effortlessly get taken off the pathway if consumer representative is not
vibrant what concluding consequence that they require
The methodology fails due to the unrealistic expectations
The best fit methodology: From the above specified methodologies, the best fit methodology
for the construction of hostel is the waterfall methodology.
Figure: Diagram of Waterfall-model
Source: (Peiris, et. al., 2018)
The Waterfall Methodology was the first Procedure Model which is to be presented. It is also
mentioned to as the linear-sequential life cycle prototypical. It is quite simple to use and
understand. In the waterfall model, each stage should be accomplished fully before the
subsequent stage can begin. One of the chief advantages of the waterfall methodology is that it
permits a group to emphasis the entire of their consideration on each feature permitting the
developers to guarantee high quality progress at each and every phase. It also helps in avoiding
the small facts from being ignored and can reduce the compatibility problems later on in
operation of the project. The other advantages of using this methodology are specified below:
High product quality
8
Document Page
Greater levels of consumer satisfaction
Increased project cost
Less chance of risk (Peiris, et. al., 2018)
Return on investments are realized early while the product is in development procedure
Agile offers liberty and flexibility when new variations are required to be implemented
9
Document Page
3. Using a recognized risk register template of choice, critically discuss at least two legal
and non-legal solutions that may impact on the timely delivery of your project
Risk register template: Below specified is the risk register for the construction project which is
undertaken by the management company for implementing the £15 million contract for the
hostel/ refuge for homeless young grownups in the specific London borough
Risk Type of
risk
Description of
risk
Probabi
lity
Legal
solution
Non-legal
solution
Continge
ncy plan
Tax or
Financia
l risk
Legal
risk
Local taxes,
availability,
Inflation and
variation in
overseas exchange
are the few of
likely monetary
risks which might
occur during the
construction
project. When the
projects are
worked on an
international level,
it is significant to
consider how the
foreign currency
will be exchanged.
Dissimilar nations
have drastically
dissimilar levies as
High
risk
The project
manager
should
align with
the taxation
policies,
rule and
regulations
of the
nation.
There must
be
transparenc
y of data
.
the
mangers
and other
staff of the
company
must be
trained in
conductin
g audits
and
knowing
all the tax
rules and
loopholes
The
contingen
cy plan
must be
focusing
on the
reduction
of risk.
Taxation
risk can
be voided
by
adopting
the
correct
principles
and
policies
and by
maintaini
ng a
10

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
well, so while
planning there is a
need to take these
different tax rates
into account before
opening the
project (Sadgrove,
2016)
regular
communi
cation
with the
governm
ent and
other
stakehold
ers
Interface
risk
Non-
legal
risk
Interfaces are the
points of
communication
among two or
more features of
the project:
Physical interfaces
arise where
different contracto
rs are involved in
the same project,
mainly where their
equivalent works
associate or
networks in some
way.
Relationship interf
Low risk The
communica
tions must
be safe and
secure and
a backup of
each
interaction
must be
encrypted
and
password
protected.
the conflict
of interest
among the
shareholder
The
company
must plan
for Fay
put and
outing so
that the
communic
ations and
relationshi
p among
the
stakeholde
r scan be
improved.
Moreover,
there must
The
contingen
cy plan
here will
also
focus on
reducing
the
adverse
impact of
this risk.
Continge
ncy
Planning
rises
from a
circumsta
11
Document Page
aces start between
different sharehold
ers on the project,
like community
groups, the client
regulatory bodies,
contractors, local
and so on
(Hopkinson, 2017)
s and the
community
must be
settled in a
legal
manner by
looking
into the
needs of all
the
stakeholder
s who are
involved
and will be
affected by
the project
be proper
planning
before
starting
the project
and at
each level,
a
communic
ation must
be
maintaine
d as per
the plan.
nce that
coverage
to danger
in
business
is
inevitable
. In the
business,
danger
can be
demarcat
ed as the
hazard
which
might
avoid the
organizat
ion or
business
from
striking
its aims.
The drive
of the
contingen
cy
planning
is,
therefore,
to make
12
Document Page
planned
replies to
measures
which
might
harmfully
influence
the
company
(Pritchar
d and
PMP,
2014).
Figure: Risk Register
Source: Self-created
The above specified risk register is used to present the risk which can be faced while completing
the project of constructing the hostel for the homeless young adults. The risk register is planned
with the risk management proposal. The manager of the project should seek involvement from
the team associates as well as shareholders and maybe from the end operators. The risk log or
risk register turn out to be indispensable as it records recognized dangers, their harshness, and
the steps or actions to be considered. It can be the simple paper, database system and spreadsheet
but the utmost operative layout is the table. A table showcases the inordinate deal of data in just
a fewsheets. Executives must outlook the risk log or register as an organization tool through the
update and reviewprocedure which classifies measures, and handless risks down to satisfactory
stages. The register offers an outline in which difficulties which threaten the distribution of
anticipated advantages are apprehended. Movements are then initiated to decrease the impending
influence and probability of explicit risks (Harris, 2017).
13

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4. Discuss at least two potential issues you may face when leading and managing your
project team. For each potential issue, explain what strategy you will adopt to alleviate it
A team comprises of numerous followers, each having the dissimilar character, handling and
supplying to their requirements can be a frightening duty at times. With countless persons
working on the project collectively, there can be differences and disagreements in the team
which can have an adverse influence on the work atmosphere and project
Challenge 1: Resistance to change
The Project Team is not able to identify that the variation has arisen. Anything which changes
the project deliverables, budget, consumer expectations or planned dates is required to be
approved and documented before application. The team is not required to go crazy with
alteration requests. The team faces this challenge at every level. .the team does not respond to the
changes in time which leads to the delays in the project and the overall cost of the project will
increase. The Project Team do not cope- up with the change. They usually get distressed when
the promoter starts a variation rather than submit it back as the variation request. The Project
Team does not offer opportunities to the sponsor. This can result in the rejection of change
request (Kerzner and Kerzner, 2017).
Strategy: Motivation and training
The project team leader should encourage the creation of relationships between the team
participants. When the associates of the team care about one another, they will be having an extra
purpose to put power and strength into the project in progress its important to provide time to the
team members to socialize, and encouraging them to develop relationships. Good motivation and
relationship among the team members can improve their promise to the business and project as a
whole motivation inspires the employees to bring change. Motivation is given to the employees
in the form of reward and incentives. Offering an incentive and a little reward can go an
elongated way. Creating a program in which the team members can receive incentives for
accomplishing aims or finishing the project. Similarly, training the team on the specifics of the
project can help in solving the issues of resistance to change. If the team members do not fully
comprehend the project as the whole or do not see the way in which the project will be valuable,
14
Document Page
they will not be as keen to do their part. Training the team participants for both the small and big
project is essential for leading changes in the project. Educating althea team associates on the
complete project procedure is also important (Boyle, 2017).
Challenge 2: Lack of Clarity of goals
The major challenge which the team members and project managers might face is not
recognizing what accurately to imagine from the project. If the objectives and goals are not
evidently well-defined, the project is condemned to fail. Starting the project deprived of clear
goals, the specific direction and an organized plan; it is like going on the road journey with no
knowledge. This impacts the management of the team.Due to the non-availability of clear
objectives any member will be doing anything, there will be no such question of expertise and
specification. A team without a goal is like a body without a heart so it is important to set goals
for managing and leading the team members in a well-organized manner.
Strategy: Routine communication
The most important strategy that can be used to minimize the above specified challenge is a good
communication between the team leader and its members. Good communications help the team
leader to understand the needs of its members. Communication enhances the relationship among
the team members and makes them feel more competent in the direction of accomplishment of
project goals and objectives. Moreover, effective communication helps in reducing the wastage
of time and efforts as good communication promotes proper distribution of work among all the
team members. Routine communication will make the team members clear about the roles,
deliverables and responsibilities. For leading a project successfully by the team members a kick
off meeting with all the shareholders must be undertaken so that discussions regarding the
deadlines, scope and the expected result can be taken (Turner, 2016).
15
Document Page
Conclusion:
From the above report, it can be concluded that the most effective project management
methodologies for the buildingproject are the waterfall methodology. Waterfall methodologies
help in the timely construction of the hostel for the homeless young adults. The waterfall
methodology helps in reducing the cost of the project. This report also concluded that the main
issues which are faced while managing a team consist of resistance to change and lack of clarity
of goals. This project also concludes the lawful and non-lawful solutions helps in the timely
delivery of the project. Further, it can be concluded that managing a project is totally dependent
on the team members. This project clearly concluded that drawing up a risk management plan is
significant for managing the risk which is associated with the construction project. Finally, from
this report, it can be concluded that Team members play a pivotal role in the success of the
project.
16

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
References
Boyle, G., 2017. Design project management. Routledge.
Harris, E., 2017. Strategic project risk appraisal and management. Routledge.
Hopkinson, M., 2017. The project risk maturity model: Measuring and improving risk
management capability. Routledge
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to
planning, scheduling, and controlling. John Wiley & Sons.
Peiris, D., Miranda, J.J. and Mohr, D.C., 2018. Going beyond killer apps: building a
better mHealth evidence base.
Pritchard, C.L. and PMP, P.R., 2014. Risk management: concepts and guidance.
Auerbach Publications.
Sadgrove, K., 2016. The complete guide to business risk management. Routledge.
Soni, D. and Kohli, P.J., 2017. Cost estimation model for web applications using agile
software development methodology. Pertanika Journal Of Science & Technology, 25(3),
pp.931-938.
Turner, R., 2016. Gower handbook of project management. Routledge.
17
1 out of 17
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]