logo

Project Management Assignment | Study

   

Added on  2022-08-22

9 Pages845 Words25 Views
 | 
 | 
 | 
Running head: PROJECT MANAGEMENT
Project Management
Name of the Student:
Name of the University:
Project Management Assignment | Study_1

PROJECT MANAGEMENT1
Table of Contents
Problem 1...................................................................................................................................2
Problem 2...................................................................................................................................3
a) Network Diagram............................................................................................................3
b) Earliest expected completion time...............................................................................3
c) Critical path.....................................................................................................................4
d) Activity 6 revised to take six weeks............................................................................5
Problem 3...................................................................................................................................5
Problem 4...................................................................................................................................7
A) Filling missing values..................................................................................................7
B) Network Diagram and critical path.............................................................................7
References..................................................................................................................................8
Project Management Assignment | Study_2

PROJECT MANAGEMENT2
Problem 1
The expected time is calculated by using the formula:
Expected time = (Ot+ 4* Mt + Pt) / 6
Ot = Optimistic time
Mt = Most likely time
Pt = Pessimistic time
The below table shows the expected time for each of the activities:
Activity Optimistic
Time
Most Likely
Time
Pessimistic
Time Expected Time
A 4 7 10 7
B 6 8 11 8.16
C 3 6 7 5.67
D 5 7 12 7.5
E 1 5 8 4.83
Project Management Assignment | Study_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Management Theories in Installation
|8
|1399
|18

EFT LFT Float (LF-EF) Project Description
|10
|1237
|120

Project Management: Network Diagram Question Answer 2022
|18
|3026
|16

Report on Networks, Scheduling & Analysis
|14
|1684
|39

Medium Rise Apartments: Precedence Diagram, Critical Path, S-Curve and Expenditure Summary
|7
|1153
|128

Project Management: Networks, scheduling and analysis 2022
|14
|1441
|40