Project Management Assignment | Wireless Warehouse

   

Added on  2020-03-16

14 Pages2509 Words151 Views
PROJECT MANAGEMENT
Project Management Assignment | Wireless Warehouse_1
Table of ContentsTask – 1 Project Schedule.....................................................................................................................2Task – 2 Network Diagram....................................................................................................................8Task – 3 Critical Path in Project Plan....................................................................................................8References.............................................................................................................................................81
Project Management Assignment | Wireless Warehouse_2
Introduction The Wireless warehouse initiative transforms materials management was improve theoperations and delivery speed by 66%. The Service providers are project management,vendor management and project scheduling. The wireless warehouse initiative transformsmaterial providers are provides the high efficient turbine drive gas compression, powergeneration packages and oil pumping. The warehouse materials management has severalchallenges such as increasing the labour costs and logistics threatening to impact the profitmargins. The company supply chain sector needs to improve the material management torising the order accuracy and increasing the material productivity and reducing the overallcosts. It controls the material management issues like shipping errors, receiving errors andinventory counts. These ar needs to improve the delivery speeds. To resolve these issues toorganization decided to take the SAP integration and radio frequency automation with warehouse to achieve the material productivity and optimum supply chain efficiency. It alsoimproves the delivery speeds. So, organization creates the project schedule to implement theRF solution in warehouse material management. These project schedule was created byorganization Project management team. The Project manager can be providing theimplementation of a ware house RF solution. The Project managers are managing anddeveloping the overall project plan. The Project manager performed the role of systemintegrator and project manager and also responsible for requirement gathering, installation ofrequired software and hardware, systems design, procurement and coordinating the useracceptance testing. The Project schedule, Network diagram and Critical path will bediscussed in detail.Task – 1 Project ScheduleThe wireless warehouse material management has the various challenges and one ormore issues (Kerzner, 2017). These are resolved by created the new RF solution to implementthe RF solution plan. The Organization team was decided to implement the RF solution bycreating the New project schedule for material management. The Project schedule wascreated by the project manager. The project manager was managed and developed by projectscheduling plan. The New RF solutions was providing the high delivery speed and orderaccuracy. The Project management overall plan is shown in below.2
Project Management Assignment | Wireless Warehouse_3
TasksThe project management schedule was based on the project task. The Project taskinclude the three main categories such as Install the shop floor wireless network., Build,configure and connect the RF devices and Incorporate RF associated SAP (Hobbs, n.d.). TheProject manager was assign the resources and allocate the time for the proposed project plan.The Implementation of RF solution Project Tasks are listed below.Task NameImplementation of a warehouse RF Solution Initialization Vendor credentialing Document approval Estimate project timeline and resources Allocate resources and form implementation team Planning and Execution Generate project-specific documentation Install shop floor wireless network Identify Your Networking Needs Technical documentation and specifications for Wireless LAN Installation of network infrastructure Router or remote connectivity Equipment installation System verification/commissioning Training Build, configure, and connect Radio Frequency devices Technical documentation and specification for Radio frequency devices Installation of Radio Frequency devices Configuration of Radio Frequency devices Connect the Radio Frequency DEvices System Verification Incorporate RF-associated SAP changes SAP’s Supply Chain Management (SCM) software Radio frequency (RF) automation SAP integration Testing Unit acceptance Testing Monitoring and controlling Finalize ware house RF Solution3
Project Management Assignment | Wireless Warehouse_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Electronics Engineer Job Profile
|5
|902
|154

Project Management: Renovation of the Royale Pizza
|14
|2100
|66

Project Report Aims in Expansion of Mamma’s Bakery
|14
|1388
|48

Network Design Document Assignment
|28
|7511
|217

Melbourne Polytechnic BIT 352 Systems Implementation.
|9
|2814
|60

EWB Design Challenge
|4
|1165
|25