Project Management - Building a One Bedroom House Bungalow 1
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 Business Case...................................................................................................................................3 Business Problem........................................................................................................................3 Benefits.......................................................................................................................................3 Stakeholder Analysis...................................................................................................................3 SMART Objectives..........................................................................................................................5 Work Breakdown Structure.............................................................................................................5 Activity List................................................................................................................................7 Risk Management.......................................................................................................................8 Activity Scheduling.......................................................................................................................12 Gantt Chart and Critical Path....................................................................................................12 Budget Modelling..........................................................................................................................13 Project Execution Challenges........................................................................................................15 CONCLUSION..............................................................................................................................15 REFERENCES..............................................................................................................................16 2
INTRODUCTION The application of processes, knowledge and skills in order to achieve the goals and objectives of a project. It is an important component in order to complete a project as it ensures that the client receives the right deliverables(Bjorvatn and Wald, 2018). There are many benefits of effective project management, like it helps in prioritising the resources available within the business and ensure that they are used efficiently. The project for this report is to build a one- bedroom house bungalow. Theclient has provided certain specifications that need to be delivered on time. If the project is managed effectively, the output will be delivered within the provided time frame. Therefore, it is important for the project manager to take informed decisions so that the project is completed properly. Business Case Business Problem The business problem in this case is that the client wants to build a one bedroom house bungalow. This is because the current area is not sufficient and also, there is a lack of resources. This is the reason why the client wants to get a new bungalow built. The bungalow will be built in a time span of 6 months. Benefits The benefits of undertaking this project will be that the there will be a better availability of resources(Bredillet, Tywoniak and Tootoonchy, 2018). Also, the area in which the house bungalow will be built, will be better as compared to the existing one. Stakeholder Analysis Thisisananalysiswhichcanhelpanorganisationinidentifyingthedifferent stakeholders of the company based on their levels of power as well as interest. A stakeholder analysis is described below - High Power, High Interest –Stakeholders that come under this category are considered to be the most important stakeholders for the company. They should always be kept happy and be informed about the progress of the project regularly. The general manager and owner of the project will come in this category. 3
High Power, Low Interest –Stakeholders who come under this category possess high power and low interest in the project. It is important to keep these stakeholders satisfied. But it is important to keep in mind that these stakeholders should be over-communicated with, as it can lead them to lose their interest in the project. Customers, investors and sponsors fall into this category. Low Power, High Interest –These stakeholders should be kept informed about the project and should be checked-in with regularly (Stakeholder Analysis,2020). This is done in order to make sure that they do not face any issues with the project. Suppliers and employees in this category. Low Power, Low Interest –These stakeholders should only be informed about the project periodically. This is because they possess low power as well as low interest. The receptionist, security guard come under this category. Therefore, stakeholder analysis is an important framework that can help the respective organisation in identifying the right stakeholders and communicating with them from time to time. This will lead to better decision-making and keeping the stakeholders satisfied as well. Communication Plan 4 Illustration1: Stakeholder Analysis Source :Stakeholder Analysis, 2020
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
A communication plan outlines how frequently each of the stakeholders should be communicated(Chawla and et. al., 2018). It is important to communicate the stakeholders in order to keep them informed about the progress of the project. A communication plan for the different stakeholders is given below - Stakeholder NameEngagementChannelFrequency General Manager and Owner of the Project Manage CloselyCheckpersonally, conduct meetings and send e-mails Once in two days Investors,Customersand Sponsors Keep SatisfiedE-mailsMonthly Suppliers and EmployeesKeep InformedMemosWeekly ReceptionistandSecurity Guard Monitor PeriodicallyShare NewsletterMonthly SMART Objectives The primary objective of the client behind undertaking this project of building a new one- bedroom house bungalow is to have a better accessibility of resources. A SMART objective for the same is stated below - To ensure the completion of project within 6 months for a given budget of £60,000 in order to have a better accessibility of resources. Work Breakdown Structure A work breakdown structure is a structure which is used in project management in order to break down a project into small and manageable tasks. It is an important component that helps in reducing the amount of complications in a project(Kerzner, 2018). Therefore, it is important for a project manager to monitor all the activities effectively so that there is no confusion among the project members regarding their roles and responsibilities. Not only this, a work breakdown structure also allows the project team to estimate the costs, risks as well as time in a much more effective way. 5
The above work breakdown structure will help the project manager in monitoring the various activities of the process effectively. Also, they will be able to track the progress of the project. This is because it will outline the various activities separately.The project manager can easily track the progress of the project and manage the performance of each team member closely. A work breakdown structure also helps the project manager in preparing a schedule so that the different project activities are carried out in time(Kivilä, Martinsuo and Vuorinen, 2017). This can lead to the project getting completed on time and based on the specifications provided by the client. In case of this project, the client wants a one-bedroom house bungalow to be constructed. This will include different activities. The activities are divided and grouped under four categories, planning, construction, furnishings and finalisation. This way, the project manager will be able to manage these activities effectively and deliver the final completed project to the client on time. 6
Activity List In order to build a one-bedroom house bungalow, there are different activities that will be involved. The same are described below - Planning StagePurchasing land and its registration –This is the initial stage before starting the project and will involve planning the land where the house bungalow has to be built and then purchasing the same. One the land is purchased, it has to be registered with the concerned development authority. Consulting the architect and engineer –After finalising the land and its registration, an experienced architect as well as engineer will be consulted. Although there roles might overlap with each other, this task is important(McClory, Read and Labib, 2017). The architect will be provide an appropriate design as well as draw a plan for the house bungalow. On the other hand, the engineer will play a role in making sure that the specifications provided by the client are fulfilled and the design which is developed by the architect is functional as well as safe at the same time. Construction StageBore Well –Next up, a bore well will be drilled near to the house and the shock waves that are generated during the drilling process can be abandoned through the layers of rock and soil.Pillars –A pillar will be constructed with the help of timber, concrete and steel having a good strength. It will help in effectively supporting the building.Soil Filling in Trenches –This process is also known as back filling and involves putting the soil back into a trench after the excavation work has been done(Meredith, Shafer and Mantel Jr, 2017). This process requires staff members who are skilled and can handle heavy equipment effectively. They should also possess effective knowledge of the different specifications as well as condition of the soil.Brick Work –This is another important activity during construction as it will help in setting up a structure of the bungalow. Either cement or mud can be used for brick work based on the type of bricks that are being used in the process. The different types of bricks include concrete bricks, burnt clay bricks, engineering bricks etc. 7
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Ducts for Electrical Wiring –Once the brick work has been done and the structure has become strong, the nest activity is installing ducts for electrical wiring in the bungalow. Ducts can be referred to rigid and strong trays which are used typically for wires and electric cables.Frames for Doors and Windows –After installing the ducts, the nest step is to install frames for doors as well as windows(Müller, Drouin and Sankaran, 2019). The frames are usually made up of wood and fit to the exact size of the wall opening. Once the frames are fixed to the walls, the windows and doors are attached to them. Water and Heat Treatment –There are different water as well as heat treatments and they are used based on the requirement. Furnishings StageTiling and Flooring –The third stage in building a one-bedroom house bungalow is tiling and flooring. This is an important activity as it helps in bringing the interiors of the bungalow together and add some beauty.Water Supply and Plumbing –Next, the water supply is checked and plumbing is done. This involves setting up the taps and fixing pipes in order to allow the water waste to drain off easily out of the house. Inside Furnishing –In this stage, the different items that will occupy the space and make it fit so that the residents can live in there. This can include furniture like sofas, tables, chairs bed etc. Finalisation Stage Completion –This is the final stage of building the one-bedroom house bungalow and will involve giving final touches to the house. Risk Management Risk Plan A risk plan involves different techniques and methods that an organisation can use to determine the various risks associated with a project that can affect its overall performance (Owusu, Chan and Shan, 2019). The plan can serve to be a very useful tool that can assist a project manager in eliminating any potential risks which can have a negative impact on the project. 8
Identify the Risk –If a risk management plan is used, it can help in identifying different risks and adopt certain measures so that they can either be reduced or eliminated. In context of this project, the project manager will be able to determine potential risks with the help of an effective risk plan. High Quality Work –If the risk management plan is developed effectively, it will help in saving time as well as ensure that the resources are utilised effectively(Radujković and Sjekavica, 2017). Also, the final quality of the finished product will also be high. PRIENCE 2 Theory This theory is usually used when a company undertakes a particular project and is primarily concerned with three different aspects. With the help of this theory, the manager can analyse the strengths as well as weaknesses. The same are described below - Strengths Predictable –One of the strengths is that any potential risks will be predicted easily and the project manager will be able to take effective measures. Standardisation –Any source of misdirection will be eliminated and the goals as well as objectives of the project will be achieved effectively. Weaknesses Complex –Besides having many strengths, there are certain weaknesses associated with the PRIENCE theory. It can be a little complex to understand and implement the same. Unrealistic –Some steps in this theory can seem to be unrealistic and can hinder the process of identifying risks. Risk Register Serial no. RiskLikeliho od ImpactOwnerMitigati on Continge ncy Weighti ng score (pre action) Weightin gscore (post action ) 1Safety hazards HighHighProject Manager Inorder to mitigate thisrisk, it will be Effective training regarding different safety 8 out of 10 9outof 10 9
ensured thatthe poweris turned offeach day once the work is finished. Also,if any hazard is identified bya worker, they will immediat ely inform others. measures willbe provided tothe project member. Apart from this, the maintena nce of the equipmen twillbe done properly. 2Unknow nsite condition s ModerateHighOwnerThesite condition sshould be analysed before the project is initiated. This will helpin Itis important to analyse the condition softhe siteand thiscan bedone eitherby conductin 7 out of 10 8outof 10 10
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
conducti ngthe project in an effective manner. ga research or having a discussio n with the ownerof the site. 3Shortage of labour LowModerateProject Manager Shortage of labour is another riskthat can adversely impact the overall progress ofthe project. Inorder to overcom ethis risk, skilled labour should be hired. Recruitm entfor experienc ed workers willbe carried out. Also, a back up planfor overcomi ngthe risk should be prepared. 6 out of 10 8outof 10 11
Activity Scheduling Gantt Chart and Critical Path It can be defined as a type of bar chart that outlines the schedule of a project in a structured manner. Gantt charts are a useful tool that are usually used by project managers in order to schedule and plan projects effectively(Shirley, 2020). On the other hand, a critical path can be defined as a sequence of different activities that form the longest duration of time. As a result, the project manager can determine the most efficient time duration. The Gantt chart will allow the project manager in scheduling the different activities of the project efficiently. Apart from this, the manager will also be able to make sure that the activities are completed within their respective timelines. 12
Budget Modelling Budget Modelling can be defined as a financial model which is used in order to develop a budget. The process comprises of management of different future costs as well as revenues. The project manager keeps updating the document as and when new information about the budget is obtained. A budget is commonly used in organisations as it helps the managers in allocating the money to different activities in an effective manner so that the resources are utilized in an effective way(Radujković and Sjekavica, 2017). Preparing a structured budget and following it can help in eliminating any kind of debt and completing the project efficiently. There are certain expenses that cannot be seen beforehand and usually come up during the project. Therefore, a 13
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
project manager can eliminate these risks by following a budget at all times. A budget in order to undertake this particular project is explained below - Cash Flow Statement Acashflowstatementinconsideredtobeanimportantfinancialstatementthat demonstrates how changes occurring in the balance sheet can affect cash within an organisation within a particular period of time. It is important because a reader can get insights about the cash position of the company within the industry(Bredillet, Tywoniak and Tootoonchy, 2018). It is very important to understand the cash position of a company in order to carry out a project in an effective manner. The main cash outflows can involve payment to labour, tools and machineries as well as purchasing raw materials. A cash flow statement is described below - 14
Project Execution Challenges There can be various challenges that can come up before, during or after the project is completed. Some of the challenges can include a lack of effective labour, lack of time and funds etc. These challenges can have an impact on the overall final product, when the project is completed(Willumsen and et. al., 2019). If there will be a lack of experienced and skilled employees, the project of building a one-bedroom house bungalow will not be able to carried out effectively. Similarly, a lack of funds can also affect the quality of materials that are used in the construction process. CONCLUSION From the above report, it can be concluded that project management is an important component for ensuring that the project is completed within the provided time frame from the client. WBS or work breakdown structure can be used in order to breakdown a complex project into small and manageable tasks, so that it is easy for the project manager to monitor the overall progress of the project. A Gantt chart can also be used to plan and schedule the different activities of the project. 15
REFERENCES Books & Journals Bjorvatn, T. and Wald, A., 2018. Project complexity and team-level absorptive capacity as driversofprojectmanagementperformance.InternationalJournalofProject Management.36(6). pp.876-888. Bredillet, C., Tywoniak, S. and Tootoonchy, M., 2018. Exploring the dynamics of project managementofficeandportfoliomanagementco-evolution:Aroutinelens. International journal of project management.36(1). pp.27-42. Chawla, V. and et. al., 2018. The sustainable project management: A review and future possibilities.Journal of Project Management.3(3). pp.157-170. Kerzner, H., 2018.Project management best practices: Achieving global excellence. John Wiley & Sons. Kivilä, J., Martinsuo, M. and Vuorinen, L., 2017. Sustainable project management through project control in infrastructure projects.International Journal of Project Management. 35(6). pp.1167-1183. McClory, S., Read, M. and Labib, A., 2017. Conceptualising the lessons-learned process in project management: Towards a triple-loop learning framework.International Journal of Project Management.35(7). pp.1322-1335. Meredith, J. R., Shafer, S. M. and Mantel Jr, S. J., 2017.Project Management: A Strategic Managerial Approach. John Wiley & Sons. Müller, R., Drouin, N. and Sankaran, S., 2019. Modeling organizational project management. Project Management Journal.50(4). pp.499-513. Owusu, E. K., Chan, A. P. and Shan, M., 2019. Causal factors of corruption in construction project management: An overview.Science and engineering ethics.25(1). pp.1-31. Radujković,M.andSjekavica,M.,2017.Projectmanagementsuccessfactors.Procedia engineering.196.pp.607-615. Shirley, D., 2020.Project management for healthcare. CRC Press. Willumsen, P. and et. al., 2019. Value creation through project risk management.International Journal of Project Management.37(5). pp.731-749. Online StakeholderAnalysis.2020.[Online].Available through:<https://www.productplan.com/glossary/stakeholder-analysis/>. 16