Running head: PROJECT MANAGEMENT Project management Name of the student Name of the University Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 PROJECT MANAGEMENT Table of Contents A) Compare and contrast top-down versus bottom-up cost estimating...........................................2 B) Analyze which you think produces the better cost estimates.....................................................3 References........................................................................................................................................5
2 PROJECT MANAGEMENT A) Compare and contrast top-down versus bottom-up cost estimating Top down estimation is considered as one of the technique that is mainly utilized by the upper level of the management for estimating the entire cost of the project by utilizing information from similar projects. On the other hand, bottom up estimation is one of the technique of project management that engages people who are generally going to take part within the entire estimation procedure (Lemmens, 2016).It is found that the bottom up estimation is considered as one of the most accurate approach of cost estimation. In this type of estimation, the entire project team is involved for getting the opportunity to take part within the development of estimates that is mainly utilized for measuring the work. According toBatselier and Vanhoucke (2015)top down estimation can be very much useful when the cost estimates are generally needed in the early phases of the project. As this technique is generally dependent on the high level of information, the estimated cost can be calculated with very much less resources as well as effort. Thus, it is considered as one of the less expensive as well as quick methodology for properly establishing the project budget in comparison to other cost estimation techniques which generally requires much more detailed information involving both project resources as well as time (Abdelhalim & Khoury, 2017). On the other hand, bottom up approach are considered to be very much accurate as each department mainly utilizes its specialized knowledge for developing the individual line items of the budget (Annadanam & Kota, 2019).This type of the entire budgeting procedure helps in improving the morale of the company and the motivation of the employees as the team generally gets involved in properly formulating the budget and takes appropriate ownership over achieving the budgeted targets of the project.
3 PROJECT MANAGEMENT It is stated byNicod et al.(2016) that top down estimates are considered to less accurate as compared to other types of cost estimation techniques. It is found that this approach overlooks the lower levels of input and can mislead.However, bottom up estimation needs time and for this the individual managers needs to create their own budget by properly referencing past budgets (Casey et al., 2017).Moreover, the managers who generally helps in using bottom up estimation generally overestimate budget which can create misinterpretation in the budget figures. Moreover, the bottom up estimation generally requires the managers to prepare the budget without the benefit in context to the organization. It is stated byJiang, Yu and Wang (2016)that top down estimation has number of disadvantages. The first and the major disadvantage of the project is lack of accuracy of the project due to exclusion of details. A bad estimation can generally result in good project getting scraped. It is found the accuracy of the estimation so it is generally dependent on the similarities between the projects that is being compared and the level of exercise of making the appropriate cost estimation (Abdelhalim & Khoury, 2017).On the other hand, it is found that utilization of bottom up estimation method is very much time consuming, misinterprets the budgeted figures. In addition to this, it is found that the bottom up estimation are done by the people who are associated with the project tasks and if the individuals are not experienced then it can cause number of challenges in performing the project work effectively. B) Analyze which you think produces the better cost estimates Bottom up estimation is considered as one of the best method of cost estimation. It is one of the basic method of cost estimation that helps in estimating the cost of the project quite effectively. The accuracy is generally achieved by using this methodology as this cost estimation approach takes into considerations number of different types of approaches each components of
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PROJECT MANAGEMENT the project work (Lemmens, 2016).In addition to this, it is found that accuracy is generally achieved within the project because the estimate for each of the project component are generally provided by the individuals who are mainly associated with the execution of that project activities. The main advantage of using the bottom up estimation is that it generally takes proper time to complete On the other hands, other types of cost estimation techniques generally utilizes high level of project requirements that are needed to be used to start at the project process (Batselier & Vanhoucke, 2015). Bottom up estimation helps in providing much more detailed schedule but it is considered as one of the time consuming approach that is compared with the top down task planning approach. It is found that this particular schedule that is created is generally based on the direct input from the experts that will be properly implementing the entire project (Annadanam & Kota, 2019).Furthermore, this technique is generally considered to be useful for properly developing proper detailed budget of the project, schedule as well as monthly project forecast. It further helps in defining the specific resource skills that are generally required during the key phases of the project for getting more accurate schedule of the project. Furthermore, the trade-off of utilizing the approach is that it generally requires much more time. It is opined byCasey et al.(2017) that bottom up estimation is one of the helpful technique in project management as it generally follows proper ability of getting much refined estimate for each of the component of the project. In addition to this, it is found that the bottom of estimate generally helps in providing the customers within an opportunity to properly compare the low cost, efficient method approach with any imposed restrictions.
5 PROJECT MANAGEMENT References Abdelhalim, A., & Khoury, A. E. (2017). Critical appraisal of the top-down approach for vesicoureteral reflux.Investigative and clinical urology,58(Suppl 1), S14-S22. Anghilante, R., Colomar, D., Brisse, A., & Marrony, M. (2018). Bottom-up cost evaluation of SOECsystemsintherangeof10–100MW.InternationalJournalofHydrogen Energy,43(45), 20309-20322. Annadanam, S. K., & Kota, S. H. (2019). Emission of greenhouse gases and criteria pollutants from railways in India estimated using a modified top-down approach.Journal of Cleaner Production,213, 610-617. Batselier, J., & Vanhoucke, M. (2015). Construction and evaluation framework for a real-life project database.International Journal of Project Management,33(3), 697-710. Casey, E., Beaini, S., Pabi, S., Zammit, K., & Amarnath, A. (2017). The triple bottom line for efficiency: Integrating systems within water and energy networks.IEEE Power and Energy Magazine,15(1), 34-42. Jiang, Z. W., Yu, H. Y., & Wang, X. S. (2016). Improvement of the “Bottom-up” Approach in Value Engineering. InProceedings of the 22nd International Conference on Industrial Engineering and Engineering Management 2015(pp. 461-468). Atlantis Press, Paris. Lemmens, S. (2016). Cost engineering techniques and their applicability for cost estimation of organic Rankine cycle systems.Energies,9(7), 485. Nicod, E., Jackson, T. L., Grimaccia, F., Angelis, A., Costen, M., Haynes, R., ... & Kanavos, P. (2016). Direct cost of pars plana vitrectomy for the treatment of macular hole, epiretinal
6 PROJECT MANAGEMENT membrane and vitreomacular traction: a bottom-up approach.The European Journal of Health Economics,17(8), 991-999.