Project Management for Camden Sickle Cell and Thalassaemia Service Group Music Event
VerifiedAdded on 2023/06/18
|12
|2397
|350
AI Summary
This report covers project management for a music event organized by Camden Sickle Cell and Thalassaemia Service Group. It includes a network diagram, stakeholder analysis, risk analysis, work breakdown structure, quality expectation, and critical evaluation of the methodology used. The methodology used is Waterfall. Subject: Project Management. Course Code: BM522. College/University: Not mentioned.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project
Management
Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents
INTRODUCTION...........................................................................................................................1
TASK 1 ...........................................................................................................................................1
Develop a network diagram to show relationship between all activities ....................................1
TASK 2............................................................................................................................................3
Stakeholder analysis for this project............................................................................................3
TASK 3............................................................................................................................................4
Develop a clearly numbered Work Breakdown Structure (WBS)...............................................4
TASK 4............................................................................................................................................6
Prepare a Risk Analysis for 20 different risks that could affect project......................................6
TASK 5............................................................................................................................................8
What are quality expectation, acceptance criteria, quality specification and measures to control
this event......................................................................................................................................8
TASK 6............................................................................................................................................8
Critically evaluation of what methodology are suitable for project and why..............................8
CONCLUSION................................................................................................................................8
REFERENCES .............................................................................................................................10
INTRODUCTION...........................................................................................................................1
TASK 1 ...........................................................................................................................................1
Develop a network diagram to show relationship between all activities ....................................1
TASK 2............................................................................................................................................3
Stakeholder analysis for this project............................................................................................3
TASK 3............................................................................................................................................4
Develop a clearly numbered Work Breakdown Structure (WBS)...............................................4
TASK 4............................................................................................................................................6
Prepare a Risk Analysis for 20 different risks that could affect project......................................6
TASK 5............................................................................................................................................8
What are quality expectation, acceptance criteria, quality specification and measures to control
this event......................................................................................................................................8
TASK 6............................................................................................................................................8
Critically evaluation of what methodology are suitable for project and why..............................8
CONCLUSION................................................................................................................................8
REFERENCES .............................................................................................................................10
INTRODUCTION
The term project management is a procedure where all disciplines process, skills and
knowledge towards accomplish their goal and objectives according to their project and manage
the way of project to take new initiatives within their organization (De Bruyne, Moensand
Vanhoucke, 2021). These type of project management consider basic principles and procedure to
a new way for implementing within their organization to create new work packages to
accomplish their goals and objectives. This report is based on Camden Sickle Cell and
Thalassaemia Service group. Main aim of this report is to provide a sustainable way to increase
their fund. This report covers several topics such as network diagram, stakeholder analysis,
identify many risk analysis, work based structure, quality expectation to control this event and
critical evaluation of this project.
TASK 1
Develop a network diagram to show relationship between all activities
This term network diagram is very significant tool for project management because it is
helpful to recognize all those activities which are needed to be cover or completed their project
during a given time of project. It also provides an essential task which are named as duration,
sequence and dependency which shows all activities to completed this project. A network
diagram is meant to be graphical presentation which is series of linked arrows to describe their
interrelationship activities that are need to be involved in this project. It also shows start and
finish time and other activities should be followed within these network diagram. Manager of
this project consist that there is a draw a network diagram but mainly it can consider to
diagramming procedure which are named as Camden Sickle Cell and Thalassaemia Service
Group to use this method is very effectively and efficiently manner to describe all those
activities (Einhorn, Marnewick and Meredith, 2019). This network diagram of this project which
are described below:
The term project management is a procedure where all disciplines process, skills and
knowledge towards accomplish their goal and objectives according to their project and manage
the way of project to take new initiatives within their organization (De Bruyne, Moensand
Vanhoucke, 2021). These type of project management consider basic principles and procedure to
a new way for implementing within their organization to create new work packages to
accomplish their goals and objectives. This report is based on Camden Sickle Cell and
Thalassaemia Service group. Main aim of this report is to provide a sustainable way to increase
their fund. This report covers several topics such as network diagram, stakeholder analysis,
identify many risk analysis, work based structure, quality expectation to control this event and
critical evaluation of this project.
TASK 1
Develop a network diagram to show relationship between all activities
This term network diagram is very significant tool for project management because it is
helpful to recognize all those activities which are needed to be cover or completed their project
during a given time of project. It also provides an essential task which are named as duration,
sequence and dependency which shows all activities to completed this project. A network
diagram is meant to be graphical presentation which is series of linked arrows to describe their
interrelationship activities that are need to be involved in this project. It also shows start and
finish time and other activities should be followed within these network diagram. Manager of
this project consist that there is a draw a network diagram but mainly it can consider to
diagramming procedure which are named as Camden Sickle Cell and Thalassaemia Service
Group to use this method is very effectively and efficiently manner to describe all those
activities (Einhorn, Marnewick and Meredith, 2019). This network diagram of this project which
are described below:
Early Start Activity Number Early finish
Slack
time
ACTIVITY NAME
Late Start Duration Late Finish
Slack
time
ACTIVITY NAME
Late Start Duration Late Finish
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
From the above calculations, early start time start with activity finishes is 0 and finish
time represent on 22 activity is 109 represent to when two task need to finish together.
This term consist that critical path are should be identified through this digram and
distance are should be covered for shortest for all these tasks. As per above diagram, it will
shows that various activities are performed during this event which is based on short time which
are named as 1,2,4,5,9,10,21, 22 which should be represented lowest time activities to finish time
will be about 117 days during this time of events duration (Ivanov, lasova and Orlova, 2020).
TASK 2
Stakeholder analysis for this project
Stakeholders analysis represents that procedure is going systematically identifying some
people in organization according to level of participation. It should gathering all information to
analyse qualitative information are taken into consideration when they implementing or
execution their policy and program. As they can useful technique for understanding, identifying
and prioritize all those stakeholders which should be influence their power or project.
Stakeholder analysis also affect their Camden Sicken Cell and Thalassaemia Service Group, their
participants, audiences and various organizer are should be considered as follows:
High power high interest: Many of stakeholders who are having their interests for the
performance to take right decision for this event which is based on such elements such as
investor, sponsors, organiser and participant all are involved in this project event.
Camden Sicken Cell and Thalassaemia Service group create a high power interests and
their produce a music concert through various stakeholders which is need to be influence
about power of project.
High power low interest: Various kinds of stakeholders has been regard of many
activities of firm but they have high power to take decision making. If government is
should be included various type of stakeholders which is not interested but they have
power to take decision in this event (Liu, 2020)
Low power low interest: When various stakeholder are should be represent does not
have nay power to take decision and participate in this music event. They are mainly
consider that staff members do not have any power and do not have nay right to take
time represent on 22 activity is 109 represent to when two task need to finish together.
This term consist that critical path are should be identified through this digram and
distance are should be covered for shortest for all these tasks. As per above diagram, it will
shows that various activities are performed during this event which is based on short time which
are named as 1,2,4,5,9,10,21, 22 which should be represented lowest time activities to finish time
will be about 117 days during this time of events duration (Ivanov, lasova and Orlova, 2020).
TASK 2
Stakeholder analysis for this project
Stakeholders analysis represents that procedure is going systematically identifying some
people in organization according to level of participation. It should gathering all information to
analyse qualitative information are taken into consideration when they implementing or
execution their policy and program. As they can useful technique for understanding, identifying
and prioritize all those stakeholders which should be influence their power or project.
Stakeholder analysis also affect their Camden Sicken Cell and Thalassaemia Service Group, their
participants, audiences and various organizer are should be considered as follows:
High power high interest: Many of stakeholders who are having their interests for the
performance to take right decision for this event which is based on such elements such as
investor, sponsors, organiser and participant all are involved in this project event.
Camden Sicken Cell and Thalassaemia Service group create a high power interests and
their produce a music concert through various stakeholders which is need to be influence
about power of project.
High power low interest: Various kinds of stakeholders has been regard of many
activities of firm but they have high power to take decision making. If government is
should be included various type of stakeholders which is not interested but they have
power to take decision in this event (Liu, 2020)
Low power low interest: When various stakeholder are should be represent does not
have nay power to take decision and participate in this music event. They are mainly
consider that staff members do not have any power and do not have nay right to take
decision because of generating low profitability. If there is low power and interests then
stakeholder analysis are generated their music event with low profitability because
stakeholders are also no there in this project there is low power of music concert are
recognized.
Low power high interest: There are stakeholders do not have right to take decision but
take interest in this music event and customer are considering that stakeholders have
power to success judgement with context to any event are highly interested for such
activities.
Communication strategies for each and every stakeholders is to follow consultation and
participation and has right to be concerned about their project and even to oppose it. They have
schedule meeting for every project, separate online screen to screen meetings, briefly about their
project report, meetings on conference call.
TASK 3
Develop a clearly numbered Work Breakdown Structure (WBS)
It is a method to defined to complex multi step project which is divided into various large
projects to getting things done in an efficiently and effectively manner. It is a tool which is used
to utilize such techniques and it is one of most significant project management documents. It is
stakeholder analysis are generated their music event with low profitability because
stakeholders are also no there in this project there is low power of music concert are
recognized.
Low power high interest: There are stakeholders do not have right to take decision but
take interest in this music event and customer are considering that stakeholders have
power to success judgement with context to any event are highly interested for such
activities.
Communication strategies for each and every stakeholders is to follow consultation and
participation and has right to be concerned about their project and even to oppose it. They have
schedule meeting for every project, separate online screen to screen meetings, briefly about their
project report, meetings on conference call.
TASK 3
Develop a clearly numbered Work Breakdown Structure (WBS)
It is a method to defined to complex multi step project which is divided into various large
projects to getting things done in an efficiently and effectively manner. It is a tool which is used
to utilize such techniques and it is one of most significant project management documents. It is
helpful to describe their project manager and allow final activities which are need to be produced
toward accomplish their successful project event (Motiejūnienė and Kasperavičienė, 2019). The
main purpose of this project is to conduct music event that Camden Sickle Cell and
Thalassaemia Service Group is designing to organize such activities set up perspective scope of
this project. Various activities of music event which are describe below:
Organization structure
toward accomplish their successful project event (Motiejūnienė and Kasperavičienė, 2019). The
main purpose of this project is to conduct music event that Camden Sickle Cell and
Thalassaemia Service Group is designing to organize such activities set up perspective scope of
this project. Various activities of music event which are describe below:
Organization structure
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
TASK 4
Prepare a Risk Analysis for 20 different risks that could affect project
No. Risk Effect Possibility Mitigation
1 Failure of power Low High To manage inverter in event has a
adverse effect of failure of power.
2 Loss of weather High low As per weather they ask weather
practised.
3 Adverse effect upon
atmosphere
high medium It would be dependent upon various
situation of health and safety
4 Lack of workers High Moderate There are number of effective
individuals for hiring
5 Security and safety Low Moderate Arrangements of privacy security and
safety
Prepare a Risk Analysis for 20 different risks that could affect project
No. Risk Effect Possibility Mitigation
1 Failure of power Low High To manage inverter in event has a
adverse effect of failure of power.
2 Loss of weather High low As per weather they ask weather
practised.
3 Adverse effect upon
atmosphere
high medium It would be dependent upon various
situation of health and safety
4 Lack of workers High Moderate There are number of effective
individuals for hiring
5 Security and safety Low Moderate Arrangements of privacy security and
safety
6 Food hygiene Low High Food safety are paying attention
7 Unseemly direction of
music event
High Low All essential event are prepared
componently
8 Small space Moderate Low There are various number of guests to
select their location
9 Social issues Moderate High All targeted people are gathered their
information
10 Award loss High Low All human activity of this music in a
very systematic way.
11 Parking set up are
improper
Low Moderate To determine parking arrangement
for guests
12 Loss of finance Low Moderate As per necessitate of event they
should arranged funds
13 Entrance of rowdy High Moderate Higher security are there and guest
are come in music event after see the
pass
14 Sponsor withdrawal Moderate Low It should contain interests of all
booster
15 Approval of domestic
polity
Moderate Low Permission from domestic authorities
for this music event.
16 Less equipments High High To arrange all furnish for specific
place and give responsibility of that
person
17 Workers safety Low Moderate To provide safety kit to all staff
members
18 Medical facility are
less provided
Low Moderate To set up first aid box and call
ambulance in case of any emergency
19 Time management
poor
Low Moderate To program all action which are
related to time and necessary to them.
20 Uncertainness Low High Future uncertainties are expected
7 Unseemly direction of
music event
High Low All essential event are prepared
componently
8 Small space Moderate Low There are various number of guests to
select their location
9 Social issues Moderate High All targeted people are gathered their
information
10 Award loss High Low All human activity of this music in a
very systematic way.
11 Parking set up are
improper
Low Moderate To determine parking arrangement
for guests
12 Loss of finance Low Moderate As per necessitate of event they
should arranged funds
13 Entrance of rowdy High Moderate Higher security are there and guest
are come in music event after see the
pass
14 Sponsor withdrawal Moderate Low It should contain interests of all
booster
15 Approval of domestic
polity
Moderate Low Permission from domestic authorities
for this music event.
16 Less equipments High High To arrange all furnish for specific
place and give responsibility of that
person
17 Workers safety Low Moderate To provide safety kit to all staff
members
18 Medical facility are
less provided
Low Moderate To set up first aid box and call
ambulance in case of any emergency
19 Time management
poor
Low Moderate To program all action which are
related to time and necessary to them.
20 Uncertainness Low High Future uncertainties are expected
TASK 5
What are quality expectation, acceptance criteria, quality specification and measures to control
this event
Quality expectation: This quality expectation defined that expected product of project
are captured with their customers. It is anticipated by event to carry out of all stakeholders and
proper management are necessary for clients and fulfil all requirements to their customers (Todt,
Weiss and Hoegl, 2019). In case of given project is music concert then customers and audience
are know about their quality expectation means what type of quality is expected for customers
and stakeholders are carry out fulfil all requirements related to this project.
Quality specification: It is considered to go through their project and quality is managed
to maintained their project and it will decided food, parking arrangements and other activities for
this event. Some specification are there in this project that is means their quality, food, drinks
and all facilities which is provided by event manager and all types of arrangements are provide
so that customers are satisfied about this project.
Acceptance criteria: This criteria will be predicted by event of funding which is based
on high expected level of stakeholders.
Measures: To analyse various kinds of levels or measurement to this event and use of
such activities which is related to food, arrangement, funds and so on. To measure safety and
security who are attend this music event and determine all expectation are should be measured.
Various measures are put control in this project such as eliminated their hazards, controls of
administration, protective equipment and so on.
TASK 6
Critically evaluation of what methodology are suitable for project and why
Aims: The main aim of this project is to organize the music concert in Camden Sickle Cell and
Thalassaemia Service Group successfully.
Objectives: To identify the purpose and budget of organizing the event.
To identify the risk that arises while organizing music concert in this project.
Methodology of project are should be considered which are applied for manager and
owners for manage different activities are recognize regarding this event. This project
management is based on Camden Sickle Cell and Thalassaemia Service Group which could be
What are quality expectation, acceptance criteria, quality specification and measures to control
this event
Quality expectation: This quality expectation defined that expected product of project
are captured with their customers. It is anticipated by event to carry out of all stakeholders and
proper management are necessary for clients and fulfil all requirements to their customers (Todt,
Weiss and Hoegl, 2019). In case of given project is music concert then customers and audience
are know about their quality expectation means what type of quality is expected for customers
and stakeholders are carry out fulfil all requirements related to this project.
Quality specification: It is considered to go through their project and quality is managed
to maintained their project and it will decided food, parking arrangements and other activities for
this event. Some specification are there in this project that is means their quality, food, drinks
and all facilities which is provided by event manager and all types of arrangements are provide
so that customers are satisfied about this project.
Acceptance criteria: This criteria will be predicted by event of funding which is based
on high expected level of stakeholders.
Measures: To analyse various kinds of levels or measurement to this event and use of
such activities which is related to food, arrangement, funds and so on. To measure safety and
security who are attend this music event and determine all expectation are should be measured.
Various measures are put control in this project such as eliminated their hazards, controls of
administration, protective equipment and so on.
TASK 6
Critically evaluation of what methodology are suitable for project and why
Aims: The main aim of this project is to organize the music concert in Camden Sickle Cell and
Thalassaemia Service Group successfully.
Objectives: To identify the purpose and budget of organizing the event.
To identify the risk that arises while organizing music concert in this project.
Methodology of project are should be considered which are applied for manager and
owners for manage different activities are recognize regarding this event. This project
management is based on Camden Sickle Cell and Thalassaemia Service Group which could be
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
applied effective methodology which is Waterfall. This methodology are consist that various
type of task are presented and perform various activities for music event and main aim is to raise
fund. They should be concentrated for specific process such as design, application, testing and
maintenance (Zhong, 2019). The main benefit is successful accomplish their long term goals and
objectives and helpful to execute such projects events. This project used waterfall methodology
because all tasks are completed in proper manner and sequential manner means each and every
stage related to project are identified before next start. Various requirements are there and used
in this project such as design, testing and maintenance. There is lot of problems about beginning
all things are done according to customer expectations.
CONCLUSION
As per above information, it has been understood that project management describe new
initiative new plan are should be changes to be implemented within their business concern.
Various planning for this music event to prepare network diagram work breakdown structure to
maintain relationship with all activities. Furthermore, to conduct stakeholders analysis and
various risk are analyse to occur in event that could be affect their project event, to define
quality expectation , specification, acceptance criteria, measurement and provide critical analysis
to determine what methodology should be suitable or not.
type of task are presented and perform various activities for music event and main aim is to raise
fund. They should be concentrated for specific process such as design, application, testing and
maintenance (Zhong, 2019). The main benefit is successful accomplish their long term goals and
objectives and helpful to execute such projects events. This project used waterfall methodology
because all tasks are completed in proper manner and sequential manner means each and every
stage related to project are identified before next start. Various requirements are there and used
in this project such as design, testing and maintenance. There is lot of problems about beginning
all things are done according to customer expectations.
CONCLUSION
As per above information, it has been understood that project management describe new
initiative new plan are should be changes to be implemented within their business concern.
Various planning for this music event to prepare network diagram work breakdown structure to
maintain relationship with all activities. Furthermore, to conduct stakeholders analysis and
various risk are analyse to occur in event that could be affect their project event, to define
quality expectation , specification, acceptance criteria, measurement and provide critical analysis
to determine what methodology should be suitable or not.
REFERENCES
Books and Journals
De Bruyne, M. J., Moens, E. and Vanhoucke, M., 2021. Project recovery: Project failures and
how to get rid of them. Journal of Modern Project Management. 9(1). pp.155-169.
Einhorn, F., Marnewick, C. and Meredith, J., 2019. Achieving strategic benefits from business
IT projects: The critical importance of using the business case across the entire project
lifetime. International Journal of Project Management. 37(8). pp.989-1002.
Ivanov, I., Vlasova, T. and Orlova, L., 2020, August. Project management regarded as a driver of
sustainable development. In E3S Web of Conferences (Vol. 210, p. 10005).
Liu, L., 2020, June. Research on Performance and Decision-making Method of Project
Management Mode. In IOP Conference Series: Earth and Environmental Science (Vol.
526, No. 1, p. 012219). IOP Publishing.
Motiejūnienė, J. and Kasperavičienė, R., 2019. Translation project management-an ultimate skill
for translators?. Current trends in translation teaching and learning E (CTTL E). 6.
pp.160-192.
Todt, G., Weiss, M. and Hoegl, M., 2019. Leading through innovation project setbacks: how
authentic leaders keep their innovators resilient. Project Management Journal. 50(4).
pp.409-417.
Zhong, Y., 2019, November. Research on Construction Engineering Project Management
Optimization Based on C4. 5 Improved Algorithm. In IOP Conference Series:
Materials Science and Engineering (Vol. 688, No. 5, p. 055036). IOP Publishing.
Books and Journals
De Bruyne, M. J., Moens, E. and Vanhoucke, M., 2021. Project recovery: Project failures and
how to get rid of them. Journal of Modern Project Management. 9(1). pp.155-169.
Einhorn, F., Marnewick, C. and Meredith, J., 2019. Achieving strategic benefits from business
IT projects: The critical importance of using the business case across the entire project
lifetime. International Journal of Project Management. 37(8). pp.989-1002.
Ivanov, I., Vlasova, T. and Orlova, L., 2020, August. Project management regarded as a driver of
sustainable development. In E3S Web of Conferences (Vol. 210, p. 10005).
Liu, L., 2020, June. Research on Performance and Decision-making Method of Project
Management Mode. In IOP Conference Series: Earth and Environmental Science (Vol.
526, No. 1, p. 012219). IOP Publishing.
Motiejūnienė, J. and Kasperavičienė, R., 2019. Translation project management-an ultimate skill
for translators?. Current trends in translation teaching and learning E (CTTL E). 6.
pp.160-192.
Todt, G., Weiss, M. and Hoegl, M., 2019. Leading through innovation project setbacks: how
authentic leaders keep their innovators resilient. Project Management Journal. 50(4).
pp.409-417.
Zhong, Y., 2019, November. Research on Construction Engineering Project Management
Optimization Based on C4. 5 Improved Algorithm. In IOP Conference Series:
Materials Science and Engineering (Vol. 688, No. 5, p. 055036). IOP Publishing.
1 out of 12
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.