PROJECT MANAGEMENT CAPSTONE C 1
Project Management Capstone C
(PROJ6016)
Olugbenga Olugbade
00171613T
Project Management Capstone C
(PROJ6016)
Olugbenga Olugbade
00171613T
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Management Capstone C
Introduction
Undertaking basic problems such as installing a power generator at a school look simple
and straight forward; however, from experience, and considering my previous project in which
my project can be considered to have failed, any project is not so straightforward. Anything can
happen that results in the project failing or being unable to meet the required deliverables.
Projects fail for a number of reasons, among the important ons being visibility, when the people
involved in the projects do not get the right information level in a timely manner (West, 2020);
others include unclear project objectives, poor scope and resource control (Microsoft Team,
2019), poor risk management, poor quality management, and poor planning (Symonds, 2011).
Projects do not end after the project work is complete (Westland, 2018), there must be a post
project review where lessons learned are documented so that future project performance can be
improved (Aziz, 2015). This paper will provide a review of the past project that encountered a lot
of challenges. In line with the requirements of the PMBOK and other project management
institutions, a review of the project and why it encountered problems and ultimately failed to
meet its objectives are discussed in this paper. After a statement of the problem considering the
past project, a possible solution to overcome the challenges is proposed. A plan for managing
stakeholders is also discussed as well as the required logistics for the project. The project then
concludes by creating a workable project plan. .
Problem statement
The previous project entailed installing a generator at a private school in Abuja, Nigeria;
however, the set objectives of the project were not met. Among the major problems encountered
in the project was the wrong calculation of the electricity load required to meet the energy
Introduction
Undertaking basic problems such as installing a power generator at a school look simple
and straight forward; however, from experience, and considering my previous project in which
my project can be considered to have failed, any project is not so straightforward. Anything can
happen that results in the project failing or being unable to meet the required deliverables.
Projects fail for a number of reasons, among the important ons being visibility, when the people
involved in the projects do not get the right information level in a timely manner (West, 2020);
others include unclear project objectives, poor scope and resource control (Microsoft Team,
2019), poor risk management, poor quality management, and poor planning (Symonds, 2011).
Projects do not end after the project work is complete (Westland, 2018), there must be a post
project review where lessons learned are documented so that future project performance can be
improved (Aziz, 2015). This paper will provide a review of the past project that encountered a lot
of challenges. In line with the requirements of the PMBOK and other project management
institutions, a review of the project and why it encountered problems and ultimately failed to
meet its objectives are discussed in this paper. After a statement of the problem considering the
past project, a possible solution to overcome the challenges is proposed. A plan for managing
stakeholders is also discussed as well as the required logistics for the project. The project then
concludes by creating a workable project plan. .
Problem statement
The previous project entailed installing a generator at a private school in Abuja, Nigeria;
however, the set objectives of the project were not met. Among the major problems encountered
in the project was the wrong calculation of the electricity load required to meet the energy
demands of the school. This was a significant setback since because its consequence was the
requisitioning of the wrong generator. Usually, one failure in technical projects, such as wrong
calculations cause a domino effect, adversely affecting other project aspects and deliverables
(Watt, 2018). The experienced problem resulted in having to order for a new set of generators,
wasting time and valuable resources. Another problem encountered in this project untimely
deliveries; logistics is a serious challenge in my Country of Nigeria especially in Abuja City. The
project required a truck to be hired and there were delays in delivery; exacerbated by bad roads
in the country. Poor logistics management has serious cost and time implications for any project
(Tarei et al., 2018). The third major challenge experienced in the previous project was human
resources; employees were unreliable with some missing work while others lacked the requisite
skills for the successful delivery of the project. Human resources management is one of the key
pillars for project success and if poorly managed puts the success of projects at risk (Aga et al.,
2016). these problems led to an overall failure of the project.
Proposed Solution to the challenge
The challenges faced in the project are serious and significant, and requires innovative
solutions aligned with best practice standards with respect to project management. The first step
is detailed project planning, starting from the initiation phase; it is especially important during
the user requirements elicitation. Getting the user requirements right is an important step in
ensuring successful project delivery and that the delivered project will be accepted by the client
(Mahnot, 2020). Getting the calculations wrong dealt a major blow to the project. To overcome
this challenge, the project will be visualized step by step, and the right personnel hired to get the
correct load calculations (Invensis Learning, 2020). Getting an experienced person with the right
tools and equipment will help ensure the calculations are gotten right so that the right generators
requisitioning of the wrong generator. Usually, one failure in technical projects, such as wrong
calculations cause a domino effect, adversely affecting other project aspects and deliverables
(Watt, 2018). The experienced problem resulted in having to order for a new set of generators,
wasting time and valuable resources. Another problem encountered in this project untimely
deliveries; logistics is a serious challenge in my Country of Nigeria especially in Abuja City. The
project required a truck to be hired and there were delays in delivery; exacerbated by bad roads
in the country. Poor logistics management has serious cost and time implications for any project
(Tarei et al., 2018). The third major challenge experienced in the previous project was human
resources; employees were unreliable with some missing work while others lacked the requisite
skills for the successful delivery of the project. Human resources management is one of the key
pillars for project success and if poorly managed puts the success of projects at risk (Aga et al.,
2016). these problems led to an overall failure of the project.
Proposed Solution to the challenge
The challenges faced in the project are serious and significant, and requires innovative
solutions aligned with best practice standards with respect to project management. The first step
is detailed project planning, starting from the initiation phase; it is especially important during
the user requirements elicitation. Getting the user requirements right is an important step in
ensuring successful project delivery and that the delivered project will be accepted by the client
(Mahnot, 2020). Getting the calculations wrong dealt a major blow to the project. To overcome
this challenge, the project will be visualized step by step, and the right personnel hired to get the
correct load calculations (Invensis Learning, 2020). Getting an experienced person with the right
tools and equipment will help ensure the calculations are gotten right so that the right generators
in terms of rating and power are requisitioned (Rastogi, 2019). In addition to getting the right
required power load, the suppliers advice will be sought; the generator suppliers would likely
know the right equipment for the load, and a representative will be required to come and get the
right power load so the right generators are requisitioned. Their calculations will be compared
with those of a consultant/ electrical technician before the generators are ordered.
The problem of logistics will be solved by using project management guidelines that
include developing a good pan during the logistics planning phase. In addition to having a
suitable plan, a ‘Plan B’ will be developed where an alternative plan is put in place to ensure the
deliveries arrive on time. A flexible time allowance will be given for the logistics, with clear
expectations and all stakeholders related to logistics engaged, with the informed stakeholders
(developed based on the RACI matrix) (Goulden, 2017). The project will be undertaken with a
lot of collaboration to guarantee its success (Oppong et al., 2017). The HR problem will be
solved through the use of an elaborate process starting with hiring to training and management of
the human resources to be used in the project (Keegan et al., 2018). the project will be managed
based on the PMBOK guidelines for manage human resources with a focus on the key processes
of planning HR management effectively, acquiring the project team, developing the project team,
and managing the project team (Roseke, 2017). The hiring process will particularly be rigorous,
and for this project, local trade and professional associations of the required professionals will be
contacted to get qualified people to interview for the various tasks; there is a higher chance of
getting professionals with the right skills, attitude, and work ethics
Stakeholders of the Project
required power load, the suppliers advice will be sought; the generator suppliers would likely
know the right equipment for the load, and a representative will be required to come and get the
right power load so the right generators are requisitioned. Their calculations will be compared
with those of a consultant/ electrical technician before the generators are ordered.
The problem of logistics will be solved by using project management guidelines that
include developing a good pan during the logistics planning phase. In addition to having a
suitable plan, a ‘Plan B’ will be developed where an alternative plan is put in place to ensure the
deliveries arrive on time. A flexible time allowance will be given for the logistics, with clear
expectations and all stakeholders related to logistics engaged, with the informed stakeholders
(developed based on the RACI matrix) (Goulden, 2017). The project will be undertaken with a
lot of collaboration to guarantee its success (Oppong et al., 2017). The HR problem will be
solved through the use of an elaborate process starting with hiring to training and management of
the human resources to be used in the project (Keegan et al., 2018). the project will be managed
based on the PMBOK guidelines for manage human resources with a focus on the key processes
of planning HR management effectively, acquiring the project team, developing the project team,
and managing the project team (Roseke, 2017). The hiring process will particularly be rigorous,
and for this project, local trade and professional associations of the required professionals will be
contacted to get qualified people to interview for the various tasks; there is a higher chance of
getting professionals with the right skills, attitude, and work ethics
Stakeholders of the Project
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
This capstone project should benefit me (the author) in learning from mistakes on how to
effectively manage projects, other project managers and people involved in managing projects.
They will get important lessons and strategies on how to deal with risks to project success and
ensure they are able to deliver projects more successfully in the future. Future executive sponsors
and clients are the other stakeholders that will benefit from improved project delivery as a result
of reading content that this capstone will contribute.
Human Resource Management
Owing to the nature of the task to be conducted, qualified staffs were needed to aid in the
installation of the generators and the inverters. Employee referral was the mode of hiring that
would be used in hiring employees. This would be done to ensure only experienced, skilled and
professional employees are contracted. Employee referral is a fast and least time consuming
method of hiring personnel as there will be fewer CVs to go about hence resulting in shortening
of the recruitment process since the only requirement is interviewing the referred candidate. The
work involved in the installation of the generators would not run for a very long time hence it
will be prudent to avoid a length recruitment process (Fan, 2018).
On the off chance that one need to experience the way toward setting an ad and
presumably having an organization do the enlistment procedure for one, it will cost one a great
deal of cash. This is an exorbitant procedure and regardless of whether one do one’s own inward
enrollment, one need to spend so as to effectively attempt the whole enlistment process.
This is a procedure that can be chopped somewhere around attempted a representative referral
process which guarantees that One get a rundown of potential possibility to meet inside a brief
effectively manage projects, other project managers and people involved in managing projects.
They will get important lessons and strategies on how to deal with risks to project success and
ensure they are able to deliver projects more successfully in the future. Future executive sponsors
and clients are the other stakeholders that will benefit from improved project delivery as a result
of reading content that this capstone will contribute.
Human Resource Management
Owing to the nature of the task to be conducted, qualified staffs were needed to aid in the
installation of the generators and the inverters. Employee referral was the mode of hiring that
would be used in hiring employees. This would be done to ensure only experienced, skilled and
professional employees are contracted. Employee referral is a fast and least time consuming
method of hiring personnel as there will be fewer CVs to go about hence resulting in shortening
of the recruitment process since the only requirement is interviewing the referred candidate. The
work involved in the installation of the generators would not run for a very long time hence it
will be prudent to avoid a length recruitment process (Fan, 2018).
On the off chance that one need to experience the way toward setting an ad and
presumably having an organization do the enlistment procedure for one, it will cost one a great
deal of cash. This is an exorbitant procedure and regardless of whether one do one’s own inward
enrollment, one need to spend so as to effectively attempt the whole enlistment process.
This is a procedure that can be chopped somewhere around attempted a representative referral
process which guarantees that One get a rundown of potential possibility to meet inside a brief
period. Regardless of whether one have a prize framework, it despite everything will in general
cost less to select by means of worker referral.
The way toward drafting an individual selected by means of representative referral is
quicker. At the point when an individual is effectively alluded to One’s organization, it implies
that they as of now have a comprehension of the organization's way of life. This makes it simpler
for the individual to settle down inside a brief timeframe (Janicki, Fischetti & Burns, 2016).
Moreover, the individual has somebody to go to for help, which implies that the individual gets
the chance to get familiar with the organization's procedures quick and settle down to work
inside a brief period.
To get great ability, most spotters will in general use head-chasing as the individuals they
target are attempted and tried (Lee, Wick & Figueroa, 2018). This procedure can be long and
tedious and it will in general expend a great deal of time. One preferred position of enlisting
through representative referral is that the individual who is being alluded is attempted and tried
yet may not really be searching for an occupation despite the fact that they may be available to
moving. This gives One access to a decent competitor, who is as of now pre-screened and at a
much lower cost regarding time and cash.
Project Plan & Budget
Project Plan
The project plan below shows how the capstone project will be delivered
Code Activity Duration
1 Initiation and planning for the project 2 days
cost less to select by means of worker referral.
The way toward drafting an individual selected by means of representative referral is
quicker. At the point when an individual is effectively alluded to One’s organization, it implies
that they as of now have a comprehension of the organization's way of life. This makes it simpler
for the individual to settle down inside a brief timeframe (Janicki, Fischetti & Burns, 2016).
Moreover, the individual has somebody to go to for help, which implies that the individual gets
the chance to get familiar with the organization's procedures quick and settle down to work
inside a brief period.
To get great ability, most spotters will in general use head-chasing as the individuals they
target are attempted and tried (Lee, Wick & Figueroa, 2018). This procedure can be long and
tedious and it will in general expend a great deal of time. One preferred position of enlisting
through representative referral is that the individual who is being alluded is attempted and tried
yet may not really be searching for an occupation despite the fact that they may be available to
moving. This gives One access to a decent competitor, who is as of now pre-screened and at a
much lower cost regarding time and cash.
Project Plan & Budget
Project Plan
The project plan below shows how the capstone project will be delivered
Code Activity Duration
1 Initiation and planning for the project 2 days
2 Sharing capstone project ideas and obtaining
feedback from professor
5 days
3 Refining project and setting project objectives 5 days
4 Identifying the resources needed to undertake the
project
4 days
5 Collecting the necessary information to undertake
the project
5 days
6 Developing the thematic topic areas for the
project to create a ‘skeleton’ outline of the project
2 days
7 Conducting in depth research and writing notes 10 days
8 Consolidating project notes to make them
coherent
5 days
9 Writing the first project draft 5 days
10 Submission of draft and obtaining feedback from
professor
5 days
11 Refining based on professor comments and
writing final draft
5 days
12 Submitting final project, making presentation (if
required) and documenting lessons learned in
undertaking the project
2 days
13 Total expected duration 11 weeks
Current skills to be tested
The skills that this capstone will test and evaluate include problem solving skills that is
the premise of the whole capstone project. The other skills to be tested and demonstrated include
feedback from professor
5 days
3 Refining project and setting project objectives 5 days
4 Identifying the resources needed to undertake the
project
4 days
5 Collecting the necessary information to undertake
the project
5 days
6 Developing the thematic topic areas for the
project to create a ‘skeleton’ outline of the project
2 days
7 Conducting in depth research and writing notes 10 days
8 Consolidating project notes to make them
coherent
5 days
9 Writing the first project draft 5 days
10 Submission of draft and obtaining feedback from
professor
5 days
11 Refining based on professor comments and
writing final draft
5 days
12 Submitting final project, making presentation (if
required) and documenting lessons learned in
undertaking the project
2 days
13 Total expected duration 11 weeks
Current skills to be tested
The skills that this capstone will test and evaluate include problem solving skills that is
the premise of the whole capstone project. The other skills to be tested and demonstrated include
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
critical thinking skills, analytical skills, and communication skills. Project management skills
will also be tested and demonstrated throughout this project execution.
will also be tested and demonstrated throughout this project execution.
References
Aga, D., Noorderhaven, N., & Vallejo, B. (2016). Transformational leadership and project
success: The mediating role of team-building. International Journal Of Project
Management, 34(5), 806-818. https://doi.org/10.1016/j.ijproman.2016.02.012
Aziz, E. (2015). Project closing. Pmi.org. Retrieved 17 April 2020, from
https://www.pmi.org/learning/library/importance-of-closing-process-group-9949.
Fan, X. (2018). Seven Principles of Undergraduate Capstone Project Management.
In Proceedings of the International Conference on Software Engineering Research and
Practice (SERP) (pp. 106-112). The Steering Committee of The World Congress in
Computer Science, Computer Engineering and Applied Computing (WorldComp)
Goulden, D. (2017). How to Manage the Logistics Behind Project Management in Enterprise
Business - Clarizen. Clarizen. Retrieved 17 April 2020, from
https://www.clarizen.com/manage-logistics-behind-project-management-in-enterprise-
business/.
Invensis Learning. (2020). How to Collect Requirements to meet Project Objectives? | Invensis
Learning. Invensislearning.com. Retrieved 17 April 2020, from
https://www.invensislearning.com/resources/pmp/how-to-collect-requirements-to-meet-
project-objectives.
Janicki, T. N., Fischetti, D., & Burns, A. T. (2016). Incorporating real world projects and
emerging technologies into one MIS capstone course
Aga, D., Noorderhaven, N., & Vallejo, B. (2016). Transformational leadership and project
success: The mediating role of team-building. International Journal Of Project
Management, 34(5), 806-818. https://doi.org/10.1016/j.ijproman.2016.02.012
Aziz, E. (2015). Project closing. Pmi.org. Retrieved 17 April 2020, from
https://www.pmi.org/learning/library/importance-of-closing-process-group-9949.
Fan, X. (2018). Seven Principles of Undergraduate Capstone Project Management.
In Proceedings of the International Conference on Software Engineering Research and
Practice (SERP) (pp. 106-112). The Steering Committee of The World Congress in
Computer Science, Computer Engineering and Applied Computing (WorldComp)
Goulden, D. (2017). How to Manage the Logistics Behind Project Management in Enterprise
Business - Clarizen. Clarizen. Retrieved 17 April 2020, from
https://www.clarizen.com/manage-logistics-behind-project-management-in-enterprise-
business/.
Invensis Learning. (2020). How to Collect Requirements to meet Project Objectives? | Invensis
Learning. Invensislearning.com. Retrieved 17 April 2020, from
https://www.invensislearning.com/resources/pmp/how-to-collect-requirements-to-meet-
project-objectives.
Janicki, T. N., Fischetti, D., & Burns, A. T. (2016). Incorporating real world projects and
emerging technologies into one MIS capstone course
Keegan, A., Ringhofer, C., & Huemann, M. (2018). Human resource management and project
based organizing: Fertile ground, missed opportunities and prospects for closer
connections. International Journal Of Project Management, 36(1), 121-133.
https://doi.org/10.1016/j.ijproman.2017.06.003
Lee, D., Wick, C., & Figueroa, H. (2018, March). Applying Scrum Project Management
Methods in Biomedical and Electrical and Computer Engineering Capstone Design
Courses. In American Society of Engineering Education Conference
Mahnot, S. (2020). Identifying requirements, the right way. Modernanalyst.com. Retrieved 17
April 2020, from
https://www.modernanalyst.com/Community/CommunityBlog/tabid/182/ID/3757/Identifying-
requirements-the-right-way.aspx.
Microsoft Team. (2019). The 6 not-so-obvious reasons a project plan fails. Microsoft.com.
Retrieved 17 April 2020, from https://www.microsoft.com/en-ww/microsoft-365/growth-
center/resources/the-6-not-so-obvious-reasons-a-project-plan-fails.
Myers, M. (2020). An IS capstone project: the Mywick property management system. Journal of
Information Systems Education, 14(3), 4
Mahnot, S. (2020). Identifying requirements, the right way. Modernanalyst.com. Retrieved 17
April 2020, from
https://www.modernanalyst.com/Community/CommunityBlog/tabid/182/ID/3757/
Identifying-requirements-the-right-way.aspx.
based organizing: Fertile ground, missed opportunities and prospects for closer
connections. International Journal Of Project Management, 36(1), 121-133.
https://doi.org/10.1016/j.ijproman.2017.06.003
Lee, D., Wick, C., & Figueroa, H. (2018, March). Applying Scrum Project Management
Methods in Biomedical and Electrical and Computer Engineering Capstone Design
Courses. In American Society of Engineering Education Conference
Mahnot, S. (2020). Identifying requirements, the right way. Modernanalyst.com. Retrieved 17
April 2020, from
https://www.modernanalyst.com/Community/CommunityBlog/tabid/182/ID/3757/Identifying-
requirements-the-right-way.aspx.
Microsoft Team. (2019). The 6 not-so-obvious reasons a project plan fails. Microsoft.com.
Retrieved 17 April 2020, from https://www.microsoft.com/en-ww/microsoft-365/growth-
center/resources/the-6-not-so-obvious-reasons-a-project-plan-fails.
Myers, M. (2020). An IS capstone project: the Mywick property management system. Journal of
Information Systems Education, 14(3), 4
Mahnot, S. (2020). Identifying requirements, the right way. Modernanalyst.com. Retrieved 17
April 2020, from
https://www.modernanalyst.com/Community/CommunityBlog/tabid/182/ID/3757/
Identifying-requirements-the-right-way.aspx.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Oppong, G., Chan, A., & Dansoh, A. (2017). A review of stakeholder management performance
attributes in construction projects. International Journal Of Project Management, 35(6),
1037-1051. https://doi.org/10.1016/j.ijproman.2017.04.015
Rastogi, A. (2019). Greycampus. Greycampus.com. Retrieved 17 April 2020, from
https://www.greycampus.com/blog/project-management/project-management-how-to-
collect-requirements-for-your-project-effectively.
Roseke, B. (2017). Project Human Resource Management According to the PMBOK.
ProjectEngineer. Retrieved 17 April 2020, from https://www.projectengineer.net/project-
human-resource-management-according-to-the-pmbok/.
Symonds, M. (2011). 15 Causes of Project Failure. Project Smart. Retrieved 17 April 2020,
from https://www.projectsmart.co.uk/15-causes-of-project-failure.php.
Tarei, P., Thakkar, J., & Nag, B. (2018). A hybrid approach for quantifying supply chain risk and
prioritizing the risk drivers. Journal Of Manufacturing Technology Management, 29(3),
533-569. https://doi.org/10.1108/jmtm-10-2017-0218
Watt, A. (2018). Risk Management Planning. Opentextbc.ca. Retrieved 17 April 2020, from
https://opentextbc.ca/projectmanagement/chapter/chapter-16-risk-management-planning-
project-management/.
West, C. (2020). Four Common Reasons Why Projects Fail. Projectinsight.net. Retrieved 17
April 2020, from https://www.projectinsight.net/white-papers/four-common-reasons-
why-projects-fail.
attributes in construction projects. International Journal Of Project Management, 35(6),
1037-1051. https://doi.org/10.1016/j.ijproman.2017.04.015
Rastogi, A. (2019). Greycampus. Greycampus.com. Retrieved 17 April 2020, from
https://www.greycampus.com/blog/project-management/project-management-how-to-
collect-requirements-for-your-project-effectively.
Roseke, B. (2017). Project Human Resource Management According to the PMBOK.
ProjectEngineer. Retrieved 17 April 2020, from https://www.projectengineer.net/project-
human-resource-management-according-to-the-pmbok/.
Symonds, M. (2011). 15 Causes of Project Failure. Project Smart. Retrieved 17 April 2020,
from https://www.projectsmart.co.uk/15-causes-of-project-failure.php.
Tarei, P., Thakkar, J., & Nag, B. (2018). A hybrid approach for quantifying supply chain risk and
prioritizing the risk drivers. Journal Of Manufacturing Technology Management, 29(3),
533-569. https://doi.org/10.1108/jmtm-10-2017-0218
Watt, A. (2018). Risk Management Planning. Opentextbc.ca. Retrieved 17 April 2020, from
https://opentextbc.ca/projectmanagement/chapter/chapter-16-risk-management-planning-
project-management/.
West, C. (2020). Four Common Reasons Why Projects Fail. Projectinsight.net. Retrieved 17
April 2020, from https://www.projectinsight.net/white-papers/four-common-reasons-
why-projects-fail.
Westland, J. (2018). What is Post-Implementation Review in Project Management?.
ProjectManager.com. Retrieved 17 April 2020, from
https://www.projectmanager.com/blog/post-implementation-review.
ProjectManager.com. Retrieved 17 April 2020, from
https://www.projectmanager.com/blog/post-implementation-review.
1 out of 12
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.