Running head: PROJECT MANAGEMENT
PROJECT MANAGEMENT
Name of the Student:
Name of the University:
Author’s Note:
PROJECT MANAGEMENT
Name of the Student:
Name of the University:
Author’s Note:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT
Introduction:-
In this report are describing the case study of Singular Logic. This organization is the
integrated IT software solution industry, which is established in 1984 in Greece. This
organization delivers integrated explanations for the public and private sectors in Greece and
overseas, mainly in Romania and Bulgaria. This organization wants to develop a research and
development process, which can increase its business efficiently. This report establishes the
knowledge of different approaches applied in the project initiation and selection process.
Discussion:-
PMBOK:-
PMI formed a collection of customary strategies and terminologies for PM that is
recognizing as these (PMBOK) parts. It is an emerging stage that modernized infrequently in its
PMBOK. The abilities positioned throughout any one of these methodical procedures. The
administration become careful in the parallel development group, nevertheless the information
areas are upright. It is the vital methodological theme material, which is important for an
effective PM procedure (Varajão et al., 2014). Singular Logic has set the premeditated purpose
to promote the consumer group and the applied selling approach. The PM process is linking to
some phases like project opening, planning, and execution, monitoring, and concluding. The
PMBOK connected with time, cost and scope management, stockholder management, quality
and risk management. The Singular Logic supervisor has recognized the summary, which can
support increasing more than a few understanding areas like a shareholder, scope, cost. This
organization uses these approaches, and they distribute exceptional user facilities and improve
their profitable income.
Introduction:-
In this report are describing the case study of Singular Logic. This organization is the
integrated IT software solution industry, which is established in 1984 in Greece. This
organization delivers integrated explanations for the public and private sectors in Greece and
overseas, mainly in Romania and Bulgaria. This organization wants to develop a research and
development process, which can increase its business efficiently. This report establishes the
knowledge of different approaches applied in the project initiation and selection process.
Discussion:-
PMBOK:-
PMI formed a collection of customary strategies and terminologies for PM that is
recognizing as these (PMBOK) parts. It is an emerging stage that modernized infrequently in its
PMBOK. The abilities positioned throughout any one of these methodical procedures. The
administration become careful in the parallel development group, nevertheless the information
areas are upright. It is the vital methodological theme material, which is important for an
effective PM procedure (Varajão et al., 2014). Singular Logic has set the premeditated purpose
to promote the consumer group and the applied selling approach. The PM process is linking to
some phases like project opening, planning, and execution, monitoring, and concluding. The
PMBOK connected with time, cost and scope management, stockholder management, quality
and risk management. The Singular Logic supervisor has recognized the summary, which can
support increasing more than a few understanding areas like a shareholder, scope, cost. This
organization uses these approaches, and they distribute exceptional user facilities and improve
their profitable income.
2PROJECT MANAGEMENT
Ethical code:-
This Singular Logic is keeping the PMI morals for improving its profitmaking
arrangement. These industries are associate morality, duty, integrity, and admiration, which can
support to increase their progress. The PM authority are bearing their proper use, which can
contain the proper consequences. The management Professional Performance and principles can
back to the organization in creating useful adoptions, mostly when the project group is tried with
strict circumstances when the project group might be scrutinizing to exchange the honesty and
morals. The perception ethics will display other project teams that are decent and authentic.
Methodologies:-
Dissimilar PM methods are supportive of finishing this project. Agile is one dynamic
project management practices. These administration's PM administration can display agile
actions for executing the strategy. These methods can provide emphasis on resistance to
continuous difference, circumstance, and usual reaction where Singular Logic and businesses
necessity to be in on the manufacturing procedure. This process is generally suitable for reduced
software projects and progresses there progress strategy.
Prince 2 is another process concerned PM approach. These approaches are focusing on
Singular Logic’s profitable configuration and also identify the future approach (Niazi et al.,
2016). These approaches are useful for commercial development. The management team of
Singular Logic can apply these methods. The Singular Logic can control the project necessity
scale with the support of this procedure. Then their work became efficient and useful.
PMBOK methods are another procedures that upkeep to the Singular Logic consultant to
make the collective project. PMBOK procedures are growing progressively and support to
Ethical code:-
This Singular Logic is keeping the PMI morals for improving its profitmaking
arrangement. These industries are associate morality, duty, integrity, and admiration, which can
support to increase their progress. The PM authority are bearing their proper use, which can
contain the proper consequences. The management Professional Performance and principles can
back to the organization in creating useful adoptions, mostly when the project group is tried with
strict circumstances when the project group might be scrutinizing to exchange the honesty and
morals. The perception ethics will display other project teams that are decent and authentic.
Methodologies:-
Dissimilar PM methods are supportive of finishing this project. Agile is one dynamic
project management practices. These administration's PM administration can display agile
actions for executing the strategy. These methods can provide emphasis on resistance to
continuous difference, circumstance, and usual reaction where Singular Logic and businesses
necessity to be in on the manufacturing procedure. This process is generally suitable for reduced
software projects and progresses there progress strategy.
Prince 2 is another process concerned PM approach. These approaches are focusing on
Singular Logic’s profitable configuration and also identify the future approach (Niazi et al.,
2016). These approaches are useful for commercial development. The management team of
Singular Logic can apply these methods. The Singular Logic can control the project necessity
scale with the support of this procedure. Then their work became efficient and useful.
PMBOK methods are another procedures that upkeep to the Singular Logic consultant to
make the collective project. PMBOK procedures are growing progressively and support to
3PROJECT MANAGEMENT
improve systematic detections. If these administrations are applying PMBOK approaches, then
they must recognize some phrases which can be beneficial for this project (Rehacek, 2014). This
organization is announcing to provide a cost-effective It software with a proper time. For this
reason, the project group is want to progress their commercial arrangement and make an
innovative model which be able to distribute outstanding customer services.
Risk Managing Technique:-
The Singular Logic can increase a great skill level in the innovative works manufacture
projects. They are want to raise abilities for controlling the tactical awareness. Risk supervision
is the technique of estimating, observing, and identifying risks to the Singular Logic’s profits and
sources. These threats might disrupt from an extensive diversity of resources, counting financial
unwillingness, legal liabilities, strategic management errors, actual accidents, and concurrences
(Eastham et al., 2014). As a result, a risk supervision strategy gradually covers Singular Logic’s
measures for organizing and detecting dangers to its digital properties, counting limited
commercial information, a customer's separately dissimilar evidence property, and intellectual.
Singular Logic’s significant difficulties are to accept an undecorated expansion symbol minded
entities and to touch a suitable note and involvement on progress activities with the projecting
commercial relationship.
Suitable risk identification is more energetic for the project group. If Singular Logic is
not generating an appropriate strategy, so this is the considerable dissatisfaction of the project.
The business has its R&D team, and this team is to try to improve for different aspects (Varajão,
Colomo-Palacios & Silva, 2017). Each business relationship is powered with the accountability
to estimation innovations in their particular zones and create propositions for project progresses.
The essential project aim is to apply the suitable configuration and valuation system, which can
improve systematic detections. If these administrations are applying PMBOK approaches, then
they must recognize some phrases which can be beneficial for this project (Rehacek, 2014). This
organization is announcing to provide a cost-effective It software with a proper time. For this
reason, the project group is want to progress their commercial arrangement and make an
innovative model which be able to distribute outstanding customer services.
Risk Managing Technique:-
The Singular Logic can increase a great skill level in the innovative works manufacture
projects. They are want to raise abilities for controlling the tactical awareness. Risk supervision
is the technique of estimating, observing, and identifying risks to the Singular Logic’s profits and
sources. These threats might disrupt from an extensive diversity of resources, counting financial
unwillingness, legal liabilities, strategic management errors, actual accidents, and concurrences
(Eastham et al., 2014). As a result, a risk supervision strategy gradually covers Singular Logic’s
measures for organizing and detecting dangers to its digital properties, counting limited
commercial information, a customer's separately dissimilar evidence property, and intellectual.
Singular Logic’s significant difficulties are to accept an undecorated expansion symbol minded
entities and to touch a suitable note and involvement on progress activities with the projecting
commercial relationship.
Suitable risk identification is more energetic for the project group. If Singular Logic is
not generating an appropriate strategy, so this is the considerable dissatisfaction of the project.
The business has its R&D team, and this team is to try to improve for different aspects (Varajão,
Colomo-Palacios & Silva, 2017). Each business relationship is powered with the accountability
to estimation innovations in their particular zones and create propositions for project progresses.
The essential project aim is to apply the suitable configuration and valuation system, which can
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4PROJECT MANAGEMENT
obtain further extension. The threat learning as a divider of PM is professionally non-existent.
These implements are one essential tool that can aid in accomplishing the project threat
skillfully. With the support of this process, the Singular Logic authority can display specific risk
management actions like risk certification, risk observing, threat reactions, qualitative and
quantifiable risk investigation.
This initial phase covers the creation of a threat supervision plan, a section of the overall
PM approach. It shields things such a relating the risk arrangements like market, resources,
gaining (Meredith, Mantel & Shafer, 2017). There are typically probable program or cost savings
formed on the work activities, and classifying them in the hazard list is the initial stage to making
those estimates. Qualitative threat controlling is involving to the different features like existence
and impression. Each risk on the threat record is inspecting and a preparation circulated to the
two serious variables. This organization must follow the PMBOK practices, which are beneficial
for analysis the threat management and stakeholder.
Appropriate Approaches:-
The supreme suitable and appropriate approach for this methodology is a PMBOK
method. It is exceptionally matching for iterative projects. Therefore PMBOK would be essential
for this. This is a progression category of procedure, in which descriptions and difficulties get
alter through the cooperative strength of cross-functional sets as well as customers.
Additionally, the manager of these project groups must be accomplished by receiving a
measurable and cleaner arrangement, which can provide adoptive modification credit, iterative
expansion, and member’s relationship (Kerzner, 2017). The Singular Logic project executive
would be capable of approving customer relationships, and as a consequence, the client support
would be enlightening to a higher level. As software is to be completed by the business, more
obtain further extension. The threat learning as a divider of PM is professionally non-existent.
These implements are one essential tool that can aid in accomplishing the project threat
skillfully. With the support of this process, the Singular Logic authority can display specific risk
management actions like risk certification, risk observing, threat reactions, qualitative and
quantifiable risk investigation.
This initial phase covers the creation of a threat supervision plan, a section of the overall
PM approach. It shields things such a relating the risk arrangements like market, resources,
gaining (Meredith, Mantel & Shafer, 2017). There are typically probable program or cost savings
formed on the work activities, and classifying them in the hazard list is the initial stage to making
those estimates. Qualitative threat controlling is involving to the different features like existence
and impression. Each risk on the threat record is inspecting and a preparation circulated to the
two serious variables. This organization must follow the PMBOK practices, which are beneficial
for analysis the threat management and stakeholder.
Appropriate Approaches:-
The supreme suitable and appropriate approach for this methodology is a PMBOK
method. It is exceptionally matching for iterative projects. Therefore PMBOK would be essential
for this. This is a progression category of procedure, in which descriptions and difficulties get
alter through the cooperative strength of cross-functional sets as well as customers.
Additionally, the manager of these project groups must be accomplished by receiving a
measurable and cleaner arrangement, which can provide adoptive modification credit, iterative
expansion, and member’s relationship (Kerzner, 2017). The Singular Logic project executive
would be capable of approving customer relationships, and as a consequence, the client support
would be enlightening to a higher level. As software is to be completed by the business, more
5PROJECT MANAGEMENT
than a few changing requirements could be merely helpful in the whole development procedure
over the PMBOK approach.
Administration governing technique:-
All of the controllers usually observe different desired governance processes with which
they sense comfortable. All vital frontrunners are connected encouragingly to these organization
projects. Some management process is Directive, participative, and Sympathetic. In this project,
some management approaches are very much indispensable, like Instruction and participative.
Instruction techniques are skilled at contributing arrangements at descriptive members'
ideas of their responsibilities. The project group is very much proficient in selecting their
supervise requirements for associating profitable production. Singular Logic has also executed
an applied marketing approach for their client. That is the reason the project team explores its
client's requirements carefully. This organization’s PM group are arbitrated their operation in
dissimilar views. They can pick several measures to finish this project (Brioso, 2015). If this
Singular Logic project groups are applying PMBOK approaches, then they speedily observe the
numerous sides like project threats, opportunities, and related stakeholders. In this Singular
Logic, the project is competent because there has an individual R&D team. This organization
always examines user self-service varieties and pay thoughtfully in supply chain improvements.
Development Plan:-
The Singular Logic PM teams are wishing to increase their production. If these groups
can display specific methodical strategy, then they are professionally evolving their work.
Primarily, the whole project group must conscious of the change administration method. Open
Corporation and statement are vital for creating a communal impress, and lastly, for protecting
than a few changing requirements could be merely helpful in the whole development procedure
over the PMBOK approach.
Administration governing technique:-
All of the controllers usually observe different desired governance processes with which
they sense comfortable. All vital frontrunners are connected encouragingly to these organization
projects. Some management process is Directive, participative, and Sympathetic. In this project,
some management approaches are very much indispensable, like Instruction and participative.
Instruction techniques are skilled at contributing arrangements at descriptive members'
ideas of their responsibilities. The project group is very much proficient in selecting their
supervise requirements for associating profitable production. Singular Logic has also executed
an applied marketing approach for their client. That is the reason the project team explores its
client's requirements carefully. This organization’s PM group are arbitrated their operation in
dissimilar views. They can pick several measures to finish this project (Brioso, 2015). If this
Singular Logic project groups are applying PMBOK approaches, then they speedily observe the
numerous sides like project threats, opportunities, and related stakeholders. In this Singular
Logic, the project is competent because there has an individual R&D team. This organization
always examines user self-service varieties and pay thoughtfully in supply chain improvements.
Development Plan:-
The Singular Logic PM teams are wishing to increase their production. If these groups
can display specific methodical strategy, then they are professionally evolving their work.
Primarily, the whole project group must conscious of the change administration method. Open
Corporation and statement are vital for creating a communal impress, and lastly, for protecting
6PROJECT MANAGEMENT
works on the way and authorizing a constructive achievement. This position is upgraded even
additionally when some groups want to effort in demonstration through the Singular Logic. The
Singular Logic project group is protecting a faultless communication plan, and then they
skillfully advanced there project. Singular Logic has specific vertical commercial channels with
particular strategies, workflows, and commercial areas. If they are maintain the instructions of all
profitable channels at a single time, so teams positively reach the project achievement.
Conclusion:-
This Greece based organization is trying to distribute adequate and reasonable facilities,
and that is why they are doing this project by some skilled project teams. The morals of the
organization are to deliver the best customer facilities, and then they improve their research and
development cyclic process. This project teams two-three hours. This team tries to make a user
friendly atmosphere with the support of more than a few project methodologies. These signs of
progress are convenient because the group is identifiers suitable stakeholders who construct a
significant part in this project work.
works on the way and authorizing a constructive achievement. This position is upgraded even
additionally when some groups want to effort in demonstration through the Singular Logic. The
Singular Logic project group is protecting a faultless communication plan, and then they
skillfully advanced there project. Singular Logic has specific vertical commercial channels with
particular strategies, workflows, and commercial areas. If they are maintain the instructions of all
profitable channels at a single time, so teams positively reach the project achievement.
Conclusion:-
This Greece based organization is trying to distribute adequate and reasonable facilities,
and that is why they are doing this project by some skilled project teams. The morals of the
organization are to deliver the best customer facilities, and then they improve their research and
development cyclic process. This project teams two-three hours. This team tries to make a user
friendly atmosphere with the support of more than a few project methodologies. These signs of
progress are convenient because the group is identifiers suitable stakeholders who construct a
significant part in this project work.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7PROJECT MANAGEMENT
References:-
Brioso, X. (2015). Integrating ISO 21500 guidance on project management, lean construction
and PMBOK. Procedia Engineering, 123, 76-84.
Eastham, J., Tucker, D. J., Varma, S., & Sutton, S. M. (2014). PLM software selection model for
project management using hierarchical decision modeling with criteria from PMBOK®
knowledge areas. Engineering Management Journal, 26(3), 13-24.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Meredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial
approach. John Wiley & Sons.
Niazi, M., Mahmood, S., Alshayeb, M., Qureshi, A. M., Faisal, K., & Cerpa, N. (2016). Toward
successful project management in global software development. International Journal of
Project Management, 34(8), 1553-1567.
Rehacek, P. (2014). Standards ISO 21500 and PMBoK® Guide for Project Management.
International Journal of Engineering Science and Innovative Technology (IJESIT), 3(1),
288-295.
Varajão, J., Colomo-Palacios, R., & Silva, H. (2017). ISO 21500: 2012 and PMBoK 5 processes
in information systems project management. Computer Standards & Interfaces, 50, 216-
222.
References:-
Brioso, X. (2015). Integrating ISO 21500 guidance on project management, lean construction
and PMBOK. Procedia Engineering, 123, 76-84.
Eastham, J., Tucker, D. J., Varma, S., & Sutton, S. M. (2014). PLM software selection model for
project management using hierarchical decision modeling with criteria from PMBOK®
knowledge areas. Engineering Management Journal, 26(3), 13-24.
Kerzner, H. (2017). Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Meredith, J. R., Mantel Jr, S. J., & Shafer, S. M. (2017). Project management: a managerial
approach. John Wiley & Sons.
Niazi, M., Mahmood, S., Alshayeb, M., Qureshi, A. M., Faisal, K., & Cerpa, N. (2016). Toward
successful project management in global software development. International Journal of
Project Management, 34(8), 1553-1567.
Rehacek, P. (2014). Standards ISO 21500 and PMBoK® Guide for Project Management.
International Journal of Engineering Science and Innovative Technology (IJESIT), 3(1),
288-295.
Varajão, J., Colomo-Palacios, R., & Silva, H. (2017). ISO 21500: 2012 and PMBoK 5 processes
in information systems project management. Computer Standards & Interfaces, 50, 216-
222.
8PROJECT MANAGEMENT
Varajão, J., Dominguez, C., Ribeiro, P., & Paiva, A. (2014). Critical Success Aspects in Project
Management: Similarities and Differences Between the Construction and the Software
Industry. Tehnicki Vjesnik/Technical Gazette, 21(3).
Varajão, J., Dominguez, C., Ribeiro, P., & Paiva, A. (2014). Critical Success Aspects in Project
Management: Similarities and Differences Between the Construction and the Software
Industry. Tehnicki Vjesnik/Technical Gazette, 21(3).
1 out of 9
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.