Project Management Delivery Systems for Western Sydney Freight Line- Stages 1 and 2
Verified
Added on 2023/06/18
|14
|1113
|98
AI Summary
This report discusses project management delivery systems for Western Sydney Freight Line- Stages 1 and 2, including a high level WBS, selection of delivery method, implementation plan, and risk management plan.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Written report on the case study
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of content Introduction Background and objectives of the case project High level WBS and Statement of work regarding to chosen project Secondary research Selection of particular delivery method along with SWOT analysis Implementation plan Conclusion References
Introduction In a project management, there are many key components which need to be consider while delivering a project. This includes project delivery system and contract management that might influence the success as well as failure of a project in any phases of a project. Therefore, the present report also assists to develop a deep understanding regarding different project management delivery systems in order to deliver a right project. The study based upon the existing project which is not yet completed. i.e. Western Sydney Freight Line- Stages 1 and 2.
Background The chosen project is Western Sydney freight Line who is designed in order to protect the land for future freight rail link between western Parkland City and Port Botany. It has been analyzed that Freight is a backbone of NSW economy and that is why, proposed to make a connection between cities. In this, NSW government is also committed in order to establish a corridor for the future and the expected price for this project is $1 billion.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Types of deliver method Design-Bid-Build Design-Build Construction Manager at Risk cost reimbursable contracts Integrated Project Delivery (IPD)
Selection of particular delivery method along with SWOT analysis StrengthWeaknesses The biggest strength of using this method for the project is such that it provides with a skilled advocate throughout the project. Also, this system provides ahigh quality with on-timedelivery project at lower cost ThebiggestweaknessofusingConstruction Manager at risk, is to increases the disputes which mightbeariseduetodesignintentand construction feasibility OpportunitiesThreats In the context of chosen project, Construction Manageratriskassisttocreatemore opportunities for the chosen project in term of financial. Such that through this delivery system, project manager may easily meet the deadline In the context of chosen delivery method, it has beenidentifiedthatduetoexposureofrisk associated with construction manager and team performance, most of the project manager may not uses the chosen method.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Implementation plan RFP preparation Project Overview:In this, a short summary of a project has been defined that helps to describe why the project performed. Organization’s background:Through this, project manager may provide a short overview of a chosen organization on which the project has made. Project goals:In order to complete the project in an effective manner, it is necessary to establish a goal. Scope:in this, project manager has to define scope through which project can be accomplish on time. Timeline and budget:In this, key element, project manager has to look after the end date of a project and ensure that the project has completed with an assigned budget.
Contract types for a design and construction of case project Thechosenprojectisentirelybaseduponthe construction and that is why, the preferred contract type for this is Unit price contracts where the total work required to complete the project into separate units. Through this, contractor provides the owner with price estimates for each unit of work instead of estimate for project as a whole.
Risk management plan Type of riskLikelihoodImpactProbabilityAction to be taken Notabletomeetthedeadline regarding delivery method. LowMediumIn order to mitigate this type of risk, it is suggested to set a standards or benchmark for each steps. This in turn helps to minimize the issue so that effective results can be generated. Not suitable for all the products delivery HighHighInordertominimizetheissue,projectmanagershould identify the pros and cons of each delivery method so that it will not affect the results in adverse manner. Lack of expertiseMediumMediumIn order to implement the preferred delivery system over Western Sydney, project manager should hire a team who have enough potential to understand the issue so that it does not cause any negative impact.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Administration of construction management of case project The project manager is responsible for the planning, coordinating, budgeting and supervising the project at beginning to end. So, the entire administration is in hands of project manager how to look after each stages in order to generate the best outcome. The administration of the Western Sydney Street Line also depend upon the team work and the contribution of each member towards a project. Further, it has been examined that by delegating the work efficiently to each worker assist to implement the project in an efficient manner. Also, this in turn helps to meet the deadline
Conclusion By summing up above study it has been concluded that Western Sydney Street Line is not yet completed and with the proper support from the team members and project managers, the project will be completed. The PPT has also summarized that there are many delivery and contracting methods which can be used by the project managers as per their defined aim. In the context of chosen project, manager uses Construction Manager at risk in order to provide effective experience to manage the project effectively
References Books and Journals Bygballe, L. E. and Swärd, A., 2019. Collaborative project delivery models and the role of routines in institutionalizing partnering.Project Management Journal. 50(2). pp.161-176. Cavanagh, M., 2017.Second order project management. Routledge. Copola Azenha, F., Aparecida Reis, D. and Leme Fleury, A., 2021. The role and characteristics of hybrid approaches to project management in the development of technology-based products and services.Project Management Journal. 52(1). pp.90-110. Fabbro, E. and Tonchia, S., 2021. Project Management Maturity Models: Literature Review and New Developments.The Journal of Modern Project Management. 8(3).