Role of Project Manager in Project Planning and Execution
Verified
Added on 2023/01/12
|23
|6422
|65
AI Summary
This article discusses the role of a project manager in project planning and execution, and how they respond to different situations. It also explores how performance, time, scope, and cost requirements can affect a project. Additionally, it highlights the importance of planning and scheduling in successful project implementation.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Table of Contents INTRODUCTION...........................................................................................................................3 MAIN BODY...................................................................................................................................3 a) Role of project manager during project planning and respond to situation.......................3 b) 'Performance, time, scope and cost' requirement can support in helping or adversely affecting project and scope of current project........................................................................4 c) Planning and scheduling of project help in successful implementation.............................7 d) WBS for the Eagle eye relocation project and dictionary..................................................8 e) Risk assessment and recommendation for responding to these risk................................12 f)Role of ‘Process improvement’ in being a strategic tool that helps organisations meet its long term goals and objectives.............................................................................................15 g) g. project management practices can help improve the efficiency of process improvement life cycles..............................................................................................................................18 Conclusions and Recommendation................................................................................................20 REFERENCES..............................................................................................................................22
INTRODUCTION Project management refers to application of several skills, knowledge, processes and experiences for achieving the specific objective as per the criteria of a particular project. It is all about managing and executing all the activities involve within the project effectively as per the finite timescale and budget. Project management is considered to be strategic approach which focuses toward aligning all the available skills or resources in a manner that the project requirement can be fulfilled effectively (Kerzner, 2017). The current report is based on a project management plan of Eagle eye which is a global leader which offer range of threat detection and screening technologies regarding transportation, military, resilience and security application. Now, Eagle eye want to expand its business in Vancouver, Canada due to numerous of growth opportunity present there. So, this project involves scope statement, planning and scheduling of the project along with details about deliverables and responses of organisational units. It further detail about the role of process improvement life-cycle, its role along with risks that may arise at the time of execution of project. MAIN BODY a) Role of project manager during project planning and respond to situation Project manager is a person who holds overall responsibility of a project i.e. from its initiation, planning to its designing, execution, monitoring, managing and closing the project. The project manager holds number of skills and capabilities which they use in order to monitoring the team and available resources for ensuring that efforts must get6 aligned in right direction toward the accomplishment of project objective(Meredith, Mantel and Shafer, 2017). Eagle eye is a firm that deal in threat detecting and screening the technology that are related with the military, security, resilience and technology application. Recently it get a large client based in Canada and with the mutual consent of stakeholder they are planning to relocate their headquarter within Canada which will start operating its business by 1stJanuary, 2020. The total budget for this relocation project would be 10 million USD and this involve relocation of several operations such as accounting, finance, customer service, Research and development etc. Hence, in order to start this relocating business, the project manager is require to develop a detailed plan that support in explaining each and every action to be taken into consideration. For this following are certain role that project manager has to perform throughout this project,
Planning and defining the scope of the project. Determining number of activities to be performed in project and arranging them in sequential manner. Planning the resources and manpower required for executing the project. Developing schedule and execution duration of each activity. Estimating the cost required and developing the budget. Analysing the risk involved and actions to be taken for dealing with them. Executing the work and performing team leadership for ensuring effective performance of each task. Monitoring and controlling the actions. These all are major roles that project manager has to perform while working over the relocation project of Eagle eye. But while performing this project number of situations may arise in front of project manager that may influence the final outcome of project(Fleming and Koppelman, 2016). Hence in order to deal with those situations a regular evaluation of project activities will be performed to detect errors if any so that timely actions can be taken into consideration. On the other side a reserve fund will be kept aside so that at the time of contingency actions can be taken into consideration. b) 'Performance, time, scope and cost' requirement can support in helping or adversely affecting project and scope of current project Project management plan is defined as a formal document which is used by a project manager in order to define some set of guidelines which help in explaining the team members in detail manner about how the project will be executed. In addition to this the project management plan also contains a detail about some set of attributes that forms up a significant part of a project such as Performance, Cost, Scope and Time. These all factors play a significant role within planning and execution of the project and also have the capability to either succeed or fail the project(Mir and Pinnington, 2014). The project manager of Eagle eye relocation must focus toward firstly evaluating these factors while creating a project management plan for assuring about the positive outcome of the project. These factors can be better understood using following point: Performance :-It plays a significant role within the actual execution of the project and ensuring desired outcome. Under this section the project manager is responsible for
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
deciding some standards of performance that are being expected from employees. This will help in determining that the operations are being executed in right direction and as per the requirement. With the help of this a regular check can also be made over planned and executed work so that the errors can be identified or rectified easily. But on the other side, if the performance standards are not maintained in advanced then it will affect the quality of operation execution and at the same time may also influence the final outcome of the project. Additionally, it also become difficult for them to identify the area where the performance of workers is lacking behind. Cost :-It is also one among the factor within the project management plan of Eagle eye relocation project and without cost it is not possible to execute the plan. This factor involves estimating the amount which a project is require in order to arrange resources, executing each activity and finishing the project successfully. The accurate estimation of cost may support project manager of Eagle eye relocation project in performing the tasks smoothly without any kind of risk (Schwalbe, 2015). But on the other side if the cost is not estimated effectively at the time of project planning or not even managed while execution of project then it may lead to loss of company. At the same time if it is not managed properly then it may lead to delay of the project due to over spending of cost or exceeding of budgeted cost. The estimated amount for this project of Eagle eye relocation project is 10 million US dollar. Scope :-This element describe about the objective of a particular project and what are some opportunities that the execution of particular project will bring to the organisation. The scope of a project plays a wider role as it help in determining the sources through which the return can be collected over the investments made on execution of the project. By defining the scope, it become easier for the Eagle eye to determine the benefits that they avail once its business get relocated to Canada(Too and Weaver, 2014). On the other side, if the scope is not defined appropriately at the starting of project then it became quite difficult to get maximum outcome out of efforts of employees. Time :-Each project is required to be get accomplished within a specific time period. This element plays a significant role in directing the people to accomplish its project within set time period in order to gain maximum benefit from it. As per the given case study of Eagle eye, it is planning to relocate its business to Canada which it wants to be
get finished within 6 months i.e. from 1stJuly to 31stDecember. Hence the project manager is required to delegate time to number of activities that it is to be performed so that work can get accomplished before deadline (Teller, Kock and Gemünden, 2014). This schedule of time for each activity support in guiding and directing the team members regarding the duration in which they have to complete their work which ensure timely completion of the project. But on the other side if the time schedule of each activity is not presented effectively then it may lead to delay in completion of project which further increase the cost of the project. These are some crucial factors that required to be consider while formulating planning for the project as it helps in successfully completion of the project. Despite of this the main scope ad cost of this project for Eagle eye is mentioned below: Scope of project for Eagle eye:- “The Eagle eye has wider scope for the execution of the project, as by relocating its business within Canada it become easier to expand the customers base as it recently made a broader client base their while operating in New York. This geographical gap may affect the quality of services and communication between clients but establishing its presence in Canada it become easier to operate business effectively and retaining the client for longer bases. Despite of this, with the referral of current clients in Canada it become easier for Eagle eye to expand its approach to new clients' too.” Estimated dates and milestones The estimation of time which required to perform a particular task is very crucial as it help in ensuring that the activities can be executed in effective manner by providing a guidance regarding the time duration in which a particular task is to be completed. On the other side, milestones are certain levels of a particular project which help in determining that whether everything is moving smoothly or facing certain issues(Joslin,and Müller, 2015). In order to represent the dates and milestones of Eagle eye relocation project, Gantt chart will be used which help in presentation of set of activities to be performed along with their starting and end dates. The estimated dates and milestones are mentioned below:
c) Planning and scheduling of project help in successful implementation The planning and scheduling plays a significant role within the execution of the project effectively as it provide an idea regarding the direction toward which the work can be proceed that support in getting a successful implementation of project (Turner, 2017) . These both are consider as main part of project management which focuses toward presenting how things can work and how things can be managed to extract best outcomes. By performing proper planning and scheduling of the project, Eagle eye will get following benefits which support in effective completion of its relocation project, By performing project scheduling it become easier to represent the entire project for guiding the work being done by the worker and in what manner that contribute toward providing assurance that it gets conducted in right direction(Todorović and et. al., 2015). In addition to this it also provides a standard and time against which the outcome can be compared or measured to determine the flow of work. It also supports in determining the interdependencies among different resources as well as tasks that are require to complete the project effectively. This support the Eagle eye in arranging all the resources that are required to perform tasks effectively priori to execution of the project so that it can be executed without any kind of issues or delays while performing tasks. It also supports the project manager of Eagle eye in determining the time constraints and other issues that may be found while execution of the project so that precautions can be taken from very beginning of the work to avoid bottleneck issues. Additionally, they can also plan actions to be taken for prospect risks. Hence, from these benefits it can be said that planning and scheduling practices plays a significant role within successful completion of the project as it helps in providing a pathway as well as guidelines regarding the manner in which work is to be performed. Additionally, it also provides a standards over which performance of team members can be measured to ensure that work is executed in right direction. For relocating its business to new location successfully i.e. Canada, eagle eye would be required to firstly priorities the work which are crucial for the growth and success of a business. These mainly includes,
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Task force: -The Eagle eye is required to ensure that the it have adequate amount of human resources that help it in executing the work effectively as per the task that are required to perform for executing a particular project(Kerzner, 2018).Despite of this it must also get a network of external partners such as designer, office mover, material supplier, transport in-charge etc. so that operations can be executed smoothly. Milestones: -It is a key factor that provide a mark toward the accomplishment of certain phases. This support the Eagle eye project manager to get an idea regarding the success or failure of project along with determining that each action get executed on timely manner. Resources: -The project manager must also ensure that resources remain available to them before execution of project. At the same time, it must also focus toward arranging the sources through which Eagle eye can get resources whenever it is required to them. Fund:-Another major factor to be on priority is the budget plan and availability of finance for executing the activities. The budget plan will help Eagle eye in getting an idea regarding cost that activity required for its execution (Silvius and Schipper, 2014). On the other side availability of fund will help project manager in arranging all the resources or other material on timely manner which is required to execute project effectively. Land and surroundings:-This is also a priority factor for Eagle eye as it remain crucial for the company to relocate its business on right location where they can get a better flow of business and also have adequate things available to them at less possible distance. Additionally, this will also support it in ensuring that all the required stuff or material can be made available to them at new location for offering its product or services. d) WBS for the Eagle eye relocation project and dictionary WBS structure
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
WBS Dictionary WBS Level WBS codeWBS Name 11Pre Project implementation 1.1Investigating land 1.2Risk analysis 1.3Arranging raw material 1.4Humanresourcerequired(procurement,constructionandother workers) 1.5Preparing budget 1.6Formulating plan 1.7Arranging resources 1.8Arranging warehouses 1.9Scheduling the activities 1.10Machineries required 22Project implementation 2.1Preparing the process plan
2.2Formulating team 2.3Arranging meeting 2.4Employees capability analysis 2.5Assigning work to employees 2.6Assigning resources 2.7Construction of building 33Post project implementation 3.1Furnishing of building 3.2Shifting the office stuff 3.3Evaluating building 3.4Providing salary to workers 3.5Handing over the work 3.6Feedback from Eagle eye e) Risk assessment and recommendation for responding to these risk Risk assessment plays a significant role within a project by providing an idea regarding the set of potential risks that may be faced within a project so that appropriate planning can be made to deal with them prior to project execution (Alias and et. al., 2014). By getting an idea regarding risk that may be faced by the Eagle eye while relocating its business, it become easier to perform action effectively which help in avoiding such risks. Following are some of the major risk that eagle eye may face while executing this project, RiskCauseBefore control Consequence s ResponsesAfter control PIR=P*IPIR=P*I Increased expenses The activities may requiremorefund togetaccomplish 236Itmaylead todelayin workor Forrespondingto thisfinancialrisk, projectmanager 122
then being assumed whilepreparing budget or it can be due to damage that mayoccuratthe timeofrelocation of business. other activities mayget hampered duetoa particular activity. must focustoward arrangingmaterial oncreditthrough trusted sources and thenmakethem returnwhenfund get arranged. Other then this the Project managercanalso keptsomereserve fundfor consistency that can beusedwhenever required. Unexpect ed ground condition Thismayhappen whentheground condition encounteredover thelandof relocationfounds totallydifferent fromthatwhich was found through theinvestigation performed previously. 133Delayin constructing thebuilding anddesign whichwas formulated at thetimeof planning mayrequire modification. Alongwith thisthe projecttime and cost may alsoget increased. Delegate this work to experienced staff team so that more effective action can betakeninto consideration. Additionally,the site staff must get awareaboutthe resultsfirstlythen take action over it. 111
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Natural calamity risk This is a risk which isassociatedwith theuncertainty causeddueto nature. This mainly includesterrorism, earthquake,flood, storm etc. 236Thismay affectthe building whichis usedfor relocationof business, damagethe stuff or may leadstoa breakover workor delaythe relocation processof eagle eye. Theserisksare harder to tackle or mitigateasthese are based on nature. Buttheproject managerofEagle eye must try to use such material in its projectexecution thatgetless affectedwith naturaldisaster such as earthquake. 122 Governm ental risk Thisinvolves severalrisksthat are associated with the management of severalproject relatedactivities underthe legislationof governmentthat may be in term of any misconduct or violenceofany legislation 3412Thismay leadsto delayin project execution dueto governmenta l intervention oritmay also stop the projectfor sometime thatmay hamper several Foravoidingthis risktheproject managermustgo through all the legal requirementsthat must be consider at thetimeof relocatingbusiness ofEagleEyeto Canada.Thishelp inensuringthat each standards must getaccomplished. In addition to this, the Project manager 133
different activities that areplanned for future. mustalsohirea lawyer in case any situation get arises sothatitcanbe overcomequickly within taking much span of time. Deficienc yin resources Improperuseof resourcesmay causemore wastage that leads toshortageof resources as per the requirementof particular task. 224Thismay affectthe qualityof workand may influence the fluencyof the activities that may also affectthe final outcome. Inorderto overcomethisthe project manager of Eagleeye relocationproject mustfocuses towardcreatinga properresources allocationplanso thatresourcesget assignedaccording totherequirement of a particular task whichfurther ensureproper utilisationof resource. 111 f) Role of ‘Process improvement’ in being a strategic tool that helps organisations meet its long term goals and objectives Process improvement is considered to be a major part for the success of a project as it helps in ensuring that each and every activity must get performed in effective manner without any kind of error that may have a negative influence on future outcome. This is considered to a
strategic tool for successful completion of the project as it focuses toward assessing the performed work and then focuses on rectifying the errors in order take the project on track as per plan which form up previously before execution of project (Burke and Barron, 2014). By adopting improvement plan effectively, it become easier for the project manager of eagle eye that relocation of business project gets executed effectively and results into the achievement of organisational goals and objectives effectively. There are several roles that process improvement plan perform that may be helpful to the eagle eye in meeting its long-term goals and objectives, Identifyproblems:-Thecontinuousprocessimprovementplanwillsupportin determining the problems that are involve within the set of activities to be performed for this project of relocation (Eskerod and Jepsen, 2016). This in turn further help in formulating action plans for these problems so that each action can be performed effectively toward the accomplishment of eagle eye's main objectives behind relocation of business. Measuring performance: - The process improvement plan also involves the evaluation of performance within certain intervals so that the gap can be identified among the planned and actual performance. This in turn help in ensuring that each task went as per the plan and brings positive outcome that ensures that Eagle eye would be able to perform well over its aims and objectives that it planned for future operations at Canada. Project quality auditing: - This process management plan serves as a project auditor over the issues related with the inconsistencies within the project planning report data or validation of activities which ensures that effective system that help in ensuring that the projectremainontrack(Heldman,2018).Auditinginvolvestheperiodicreview regarding the project progress as well as project plan which confirm that the project report get exact true state. Ensure consistent approach for project: - The consistent and structured approach of this projectidentificationwillprovideanorganisationwiththerequiredabilityfor determining, selecting and managing the continuous improvement project (Heldman, 2018). This continuous improvement project process also provides a post-closing process step that continually refine about the improvement within the project methodology and to act upon the lesson that it learn from the project efforts.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
These are some of the major role that process improvement plan will play in order to ensure that main outcome behind a particular project will get accomplished (Kaiser, El Arbi and Ahlemann, 2015). By getting success in relocation of a business it become easier for the Eagle eye to start its operation effectively within Canada for which it decided to shift its operations. The process improvement plan mainly involves, Map the process:- By performing an evaluation over the set of activities performed within the project, the project manager must make evaluation on regular basis in order to get an measure regarding the activities that whether it performed appropriately or required some changes to be made (Lientz and Rea, 2016). This will help Eagle eye project manager to visuallymapoutthecurrentstepfordeterminingitscurrentpositionandthen determining the area of improvement. Analyse the process: - Once the steps to be taken are mapped out the next is to take a closer look for each step. This help in determining the areas of improvement in term of delays, resources deficit or whether it involve more expenses. This help in tracing the problem which it is originally be identified within the project and main cause behind it. Redesign the process: - The redesign process which is having issue, this will make sur3e that there remains a correct understanding of old process that do not miss anything(Too and Weaver, 2014). Under this brainstorming can be made under the project team of relocation so that number of ideas can be generated out of which best one is to be selected for recovering from the issue. Assign resources: - After redesigning the process, next is to determine the resources that it actually require for being executed effectively (Lock, 2016). Under this each resource
is well arranged and assigned so that best possible outcome can be extracted which is well presented at the time of planning. Develop an implementation plan: - With the assignment of resources as well as solution being selected the next is to create a plan and assign time to its set of activities. In this the project manager is required to involve team member required for performing the task. After this it is required to create a timeline which shows time at which a particular task get performed and finished (Marcelino-Sádaba and et. al., 2014). Creating the detailed process implementation plan will ensure that the planned activities get performed in effective manner till end. Communicate and execute: - This step involve putting plan into an action, before it move toward executing phase, project manager must communicate this plan to remaining team member of Eagle eye relocation project(Teller, Kock and Gemünden, 2014). By keeping team in the loop this become helpful that the team will get resist to the new process. Monitoring and optimize: - Under this the project manager of Eagle eye analyse the work which is continuing to be executed for the relocation of the business (Pinto, 2014). This will support in determining the action to be taken for taking back the project or particular process over track. g) g. project management practices can help improve the efficiency of process improvement life cycles Performance management refers to the procedure of setting activities to meet the requirements of consumers through their qualitative product. This enhance the production and volume of output by enlarging consumers to satisfy their needs, desires and wants. This management concentrates and monitors the execution of organisation through its department, process, etc., to determine errors and rectify it by corrective measures(Turner, 2017). The performance management for Eagle eye relocation which is situated in US wants to expand its business in Canada. This enlarge it number of consumers which are to be satisfied withtheirqualitativeproducts.Theperformancemanagementplaysanessentialrolein improvingtheefficiencyofprocesslifecyclebystartingitsprocedurefromstrategy, documentation, optimization, implementation, execution and ending at controlling. Process strategy is described as to generate innovative idea for strategic decision-making which creates competitive advantage to sustain in market. This determines the ability to design
digital solution which unlocks potential to disrupt the business process management. The Process documentation refers as detailed description to execute procedure in systematic manner which outline its specified task and various methods to execute it. This is the framework which consists the steps from preceding to its ending(Uphoff, 2019). Process optimization is adjusting or optimizing procedure which targets to minimise cost for achieving organisation goals and objectives. This increase the ability of the employees to perform their task with high level of potential as they are doing the same activity continuously or repeatedly. The implementation activity is explained as to convert strategies into plans which are to be executed in business to accomplish its targets. It implements strategies through strategic planning which increase competitive advantage of organisation. Process execution is to enact or to perform actions by using software or technologies to reduce time consumption. It is the activity which is to be performed effectively and to achieve the desired target of organisation. The controlling activity consists of monitoring the actions or performance implied in business to determine the errors and rectify it by taking corrective measures to achieve organisational goals and objectives(Silvius and Schipper, 2014). It is the capability of business to achieve success in order to compete from its rivalries to remain stable. TheperformancemanagementofEagleeyerelocationistofocusonadopting technologies for military, transportation, security, etc., which reduce time wastage. It is the ability to satisfy the demand of consumers through transporting their products which remove the hindrance of place. The organisation specifically adopts the new innovative technologies as it increases the ability to compete with rivalries and to sustain in competitive market. The managerial activity is suitable to develop innovative idea for strategic decision- making which helps in operations of business to increase effectiveness and relocate the activities. This is the capability ofEagle eye relocation to grand transit the high level of planning. To improve the project management process there is need to have proper information regarding such as where organisation is going to relocate and what are the expectation of people that can help project manager to make right business decisions(Schwalbe, 2015). For improving the performance of eagle eye project manager is required to follow the various activities that can helps to attain the business goals and objectives.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
According to Harmon, (2019) There is need to identify the problems which are coming in project or task performing that helps to understand what actions are required to be taken for reducing negative impacts. After identification of problem the project manager is required to measure the performance that states where is interval or gap between planning and actual performance. By evaluating performance managers are responsible to make effective plans and evaluate them that helps to understand what improvements needed to bring out for completion of project.Herein,managersareresponsibletoevaluatetheplansandgetimprovement improvements accordingly (Pinto, 2014). Then ensure consistent approach that is important for taking initiatives and managing the business activities effectively. The manager of organisation are can improve their efficiency by evaluating approaches and strategies which helps to increase the production and profitability. Therefore, the manager of eagle eye can bring efficiency in their completion of project that increases organisational productivity and profitability. Conclusions and Recommendation Recommendation From the above analysis and literature review it has defined that organisation should have proper planning and strategies that can help to deal with problems which they are facing in their business. For instance, Eagle eye is going to relocate its business from one country to another where it requires strong planning that can help to complete this project. The managers of such
organisation is required to focus on plans, new business structure, locality, customer services, accounting and finance that helps to run a business effectively. While running a business there is need to have enough finance, research, stakeholders, investors and good knowledge about other country so business can be established easily. If organisation is facing any problems in relocation then it required to identify the problems and get optimum solution by sharing with all that leads to get completion of project. In context to Eagle eye, project manager is responsible for completing projection by operating activities by relocating business effectively that complete task and increase business profitability. Therefore, goals and objectives of organisation can be accomplishedbymaintainingallactivitiesinsynchronisedformandcontrollingthem continuously. Conclusion From the report it can be concluded that project management involves set of activities to be performed in order to execute a particular project successfully.Project managers plays a significant role in project by formulating plans and organise the activities for responding to present situations properly. Cost, time and scope are the basic factors that required to be consider before starting a particular project as it supports in completing the task within certain period of time. Planning and scheduling help project managers to implement their planning successfully and be able to complete project as per plan. Risk assessment is also a crucial factor within a project as it supports the project manager in identify the risk, arising in business activities and suggest ideas to overcome such problems. Different processes are used by management that helps to bring improvements in projects and also helps to attain the business goals and objectives.
REFERENCES Books & Journals Alias, Z. and et. al., 2014. Determining critical success factors of project management practice: A conceptual framework.Procedia-Social and Behavioral Sciences. 153. pp.61-69. Burke, R. and Barron, S., 2014.Project management leadership: building creative teams. John Wiley & Sons. Eskerod, P. and Jepsen, A. L., 2016.Project stakeholder management. Routledge. Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute. Harmon, P., 2019.Business process change: a business process management guide for managers and process professionals. Morgan Kaufmann. Heldman, K., 2018.Project management jumpstart. John Wiley & Sons. Heldman, K., 2018.PMP: project management professional exam study guide. John Wiley & Sons. Joslin, R. and Müller, R., 2015. Relationships between a project management methodology and project success in different project governance contexts.International journal of project management,33(6), pp.1377-1392. Kaiser, M. G., El Arbi, F. and Ahlemann, F., 2015. Successful project portfolio management beyond project selection techniques: Understanding the role of structural alignment. International Journal of Project Management. 33(1). pp.126-139. Kerzner, H., 2017.Project management metrics, KPIs, and dashboards: a guide to measuring and monitoring project performance. John Wiley & Sons. Kerzner, H., 2018.Project management best practices: Achieving global excellence. John Wiley & Sons. Lientz, B. and Rea, K., 2016.Breakthrough technology project management. Routledge. Lock, D., 2016.Project management in construction. Routledge. Marcelino-Sádaba, S. and et. al., 2014. Project risk management methodology for small firms. International journal of project management. 32(2). pp.327-340. Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. and Villanueva, P., 2014. Project risk management methodology for small firms.International journal of project management,32(2), pp.327-340. Meredith, J.R., Mantel Jr, S.J. and Shafer, S.M., 2017.Project management: a managerial approach. John Wiley & Sons. Mir, F.A. and Pinnington, A.H., 2014. Exploring the value of project management: linking project management performance and project success.International journal of project management,32(2), pp.202-217. Pinto,J.K.,2014.Projectmanagement,governance,andthenormalizationofdeviance. International Journal of Project Management. 32(3). pp.376-387. Schwalbe, K., 2015.Information technology project management. Cengage Learning. Silvius, A. J. and Schipper, R. P., 2014. Sustainability in project management: A literature review and impact analysis.Social Business. 4(1). pp.63-96. Teller, J., Kock, A. and Gemünden, H. G., 2014. Risk management in project portfolios is more than managing project risks: A contingency perspective on risk management.Project Management Journal. 45(4). pp.67-80.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Todorović, M.L., Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2015. Project success analysis framework: A knowledge-based approach in project management.International Journal of Project Management,33(4), pp.772-783. Too, E.G. and Weaver, P., 2014. The management of project management: A conceptual framework for project governance.International Journal of Project Management,32(8), pp.1382-1394. Turner, J. R., 2017.Contracting for project management. Routledge. Uphoff, N., 2019.Improving international irrigation management with farmer participation: Getting the process right. Routledge. <https://lanalabs.com/en/glossary/process-management-lifecycle/>