Running head: PROJECT MANAGEMENT Project management Name of the Student Name of the University Author’s Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1 PROJECT MANAGEMENT Table of Contents 1. Discussion about the work breakdown structure and its importance in project planning and budgeting.........................................................................................................................................2 2. Creating WBS and linking it with Gantt chart for reflecting the lifecycle of the project........4 2.1 Work breakdown structure of the project..............................................................................4 2.2 Schedule of the project..........................................................................................................5 2.3 Gantt chart of the project.......................................................................................................7 References........................................................................................................................................8
2 PROJECT MANAGEMENT 1. Discussion about the work breakdown structure and its importance in project planning and budgeting A WBS is considered as one of the important project deliverable that helps in organizing the entire project into number of manageable sections. The WBS generally assists the project managers in planning the entire work that is related with the project much more efficiently (Siami-Irdemoosa, Dindarloo & Sharifzadeh, 2015).It is found that the main reason of using a WBS is to minimize the different complicated project activities into a number of project tasks. It is found to be very much important for the managers of the project as they have the ability of overseeing the tasks more efficiently in comparison to other types of complex activities. Tasks must be properly independent as well as measurable as it generally helps in defining the limits. It is found that as the project WBS can be considered to be measurable as the project manager have the ability of assigning specific costs to each of the project. As the WBS generally lets the project managers to properly distribute the project budget into a number of defined packages that are mainly linked with the tasks for making sure that the total cost of the project does not exceed (Elsye, Latief & Sagita, 2018).In addition to this, the WBS is mainly considered important for properly tracking the progress of the project schedule. As the WBS tasksgenerallyhavedefinedlimitsthereforetheprojectmanagementgenerallyhelpsin identifying the advancement of the project by properly checking which of the project tasks are mainly finished. Even within each of the project task, the project management generally checks the percentage completion of each task that is considered to be measurable (Supriadi, Biruni & Latief, 2018).
3 PROJECT MANAGEMENT It is found that one of the main key functions of the PMis to properly defining the scope of the project effectively. The main challenge is make sure that everything that is generally present within the scope of the project is properly completed by properly carrying out any of the additional work that is generally needed within the project. The WBS helps in defining the scope of the project by properly listing the individual tasks that generally make up the entire project (Kerzner & Kerzner, 2017).It is found that it is the responsibility of the project team to complete each of the listed tasks with no additional work performance. It is found that one of the major criterion of the project success is to fulfil the intended purpose of the project.As WBS breaksdowntheprojectthereforeprojectplanning,management,executionaswellas coordination of the project is done effectively and helps in completing the work of the project successfully within the assumed time and budget of the project (Joslin & Muller, 2015). It is stated byHornstein (2015)that as WBS divides the work into smaller parts, it is very much easier to estimate the cost of the project successfully. With the help of the WBS, the cost that is needed for the successful completion the project can be estimated effectively by dividing the work into smaller parts in order to make the estimation appropriate. Furthermore, it is identified that utilization of WBS helps in preventing changes within the project (Elsye, Latief & Sagita, 2018).The changes that are required in the project are inevitable but due to the use of WBS, the breakdown of the project scope is properly reflected that prevents changes within the project and assists in making the scope of the project much more clear. Moreover, the risks that are associated with each activities of the project can be identified quite easily by using the work breakdown structure.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4 PROJECT MANAGEMENT 2. Creating WBS and linking it with Gantt chart for reflecting the lifecycle of the project 2.1 Work breakdown structure of the project Development of information system Initiation phase of the project Undertaking survey Determining issues Determining solutions Considering the solution of information system Getting approval of the information system Planning phase of the project Scope determination Project objectives identification Project budget development Project plan development Cost benefit analysis Allocating work Procuring resources Moving towards project implementation phase Execution phase of the project Recruiting staffs Project prototype development Development of website Addition of option into the profile Addition of payment option Tracking portal option Including inventory option Checking functionality Development of entire version Testing of the project Closure phase of the project Providing training Project review Signoff Documentation Figure 1: WBS (Source: Created by Author)
5 PROJECT MANAGEMENT 2.2 Schedule of the project WBSTask NameDurationStartFinish 0Development of information system71 daysMon 18-03-19Mon 24-06-19 1Initiation phase of the project10 daysMon 18-03-19Fri 29-03-19 1.1Undertaking survey2 daysMon 18-03-19Tue 19-03-19 1.2Determining issues3 daysWed 20-03-19Fri 22-03-19 1.3Determining solutions2 daysMon 25-03-19Tue 26-03-19 1.4 Considering the solution of information system 2 daysWed 27-03-19Thu 28-03-19 1.5 Getting approval of the information system 1 dayFri 29-03-19Fri 29-03-19 2Planning phase of the project18 daysFri 29-03-19Tue 23-04-19 2.1Scope determination3 daysFri 29-03-19Tue 02-04-19 2.2Project objectives identification2 daysWed 03-04-19Thu 04-04-19 2.3Project budget development3 daysFri 05-04-19Tue 09-04-19 2.4Project plan development2 daysWed 10-04-19Thu 11-04-19 2.5Cost benefit analysis2 daysFri 12-04-19Mon 15-04-19 2.6Allocating work3 daysTue 16-04-19Thu 18-04-19 2.7Procuring resources2 daysFri 19-04-19Mon 22-04-19 2.8 Moving towards project implementation phase 1 dayTue 23-04-19Tue 23-04-19 3Execution phase of the project38 daysTue 23-04-19Thu 13-06-19
6 PROJECT MANAGEMENT 3.1Recruiting staffs3 daysTue 23-04-19Thu 25-04-19 3.2Project prototype development4 daysFri 26-04-19Wed 01-05-19 3.3Development of website6 daysThu 02-05-19Thu 09-05-19 3.4Addition of option into the profile3 daysFri 10-05-19Tue 14-05-19 3.5Addition of payment option4 daysWed 15-05-19Mon 20-05-19 3.6Tracking portal option5 daysTue 21-05-19Mon 27-05-19 3.7Including inventory option4 daysTue 28-05-19Fri 31-05-19 3.8Checking functionality3 daysMon 03-06-19Wed 05-06-19 3.9Development of entire version5 daysThu 06-06-19Wed 12-06-19 3.10Testing of the project1 dayThu 13-06-19Thu 13-06-19 4Closure phase of the project7 daysFri 14-06-19Mon 24-06-19 4.1Providing training3 daysFri 14-06-19Tue 18-06-19 4.2Project review2 daysWed 19-06-19Thu 20-06-19 4.3Signoff1 dayFri 21-06-19Fri 21-06-19 4.4Documentation1 dayMon 24-06-19Mon 24-06-19
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7 PROJECT MANAGEMENT 2.3 Gantt chart of the project Figure 2: Gantt chart (Source: Created by Author)
8 PROJECT MANAGEMENT References Elsye, V., Latief, Y., & Sagita, L. (2018). Development of Work Breakdown Structure (WBS) Standard for Producing the Risk Based Structural Work Safety Plan Of Building. InMATEC Web of Conferences(Vol. 147, p. 06003). EDP Sciences. Hornstein, H. A. (2015). The integration of project management and organizational change management is now a necessity.International Journal of Project Management,33(2), 291-298. Joslin, R., & Müller, R. (2015). Relationships between a project management methodology and project success in different project governance contexts.International Journal of Project Management,33(6), 1377-1392. Kaiser, M. G., El Arbi, F., & Ahlemann, F. (2015). Successful project portfolio management beyondprojectselectiontechniques:Understandingtheroleofstructural alignment.International Journal of Project Management,33(1), 126-139. Kerzner, H., & Kerzner, H. R. (2017).Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Siami-Irdemoosa, E., Dindarloo, S. R., & Sharifzadeh, M. (2015). Work breakdown structure (WBS) development for underground construction.Automation in Construction,58, 85- 94. Supriadi, L. S. R., Biruni, R., & Latief, Y. (2018, September). Development of work breakdown structure (WBS) dictionary for the construction works of precast concrete bridge. InIOP
9 PROJECT MANAGEMENT Conference Series: Materials Science and Engineering(Vol. 420, No. 1, p. 012004). IOP Publishing. Svejvig, P., & Andersen, P. (2015). Rethinking project management: A structured literature review with a critical look at the brave new world.International Journal of Project Management,33(2), 278-290.