Project Management Plan: WA Storage Facility Upgrade & Closure Steps

Verified

Added on  2023/03/31

|10
|2813
|95
Report
AI Summary
This report outlines a project management plan for upgrading a Western Australian storage facility. It covers the implementation plan, including management structure, style, and levels of authority. The management plan details critical aspects to control, such as time, cost, resources, and quality, along with the tools and techniques for effective control. It identifies key areas for successful project management and discusses methods for project performance evaluation, including budget analysis. The report also provides steps required for project closure, ensuring all aspects of the project are properly finalized and documented. The goal is to bring the facility up to standard while maintaining normal operations and reducing environmental fines.
Document Page
PROJECT MANAGEMENT
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
TABLE OF CONTENTS
INTRODUCTION...........................................................................................................................1
Implementation plan........................................................................................................................1
Management plan.............................................................................................................................2
Things that must be controlled....................................................................................................2
Tools and techniques of control...................................................................................................3
Areas for successful management of case study project.............................................................4
Project performance and evaluation................................................................................................5
Methods of project evaluation.....................................................................................................5
Selecting best one........................................................................................................................6
Project closure.................................................................................................................................6
Steps required to close project.....................................................................................................6
CONCLUSION................................................................................................................................7
REFERENCES................................................................................................................................8
Document Page
INTRODUCTION
Project management is the one of the main domain that is currently used by the firms for
improving their performance. In the current report implementation plan and management plan is
discussed in detail. Apart from this, in the report management plan is discussed in detail. In
middle part of the report, tools and methods of control are explained in detail. At end of the
report, project closure steps are explained in detail.
Implementation plan Management structure: Management structure refers to the hierarchy under which
people work who manage different sort of work. There are different sort of powers that
are given to the employees that are working at different levels in the organization. There
is a clear line of communication that individuals have to follow in order to communicate
with each other in proper manner (Kerzner, 2013). In case of the current project there
must be a hierarchy under which there must be a senior manager that must have entire
command. Under the senior manager there must be multiple junior managers. It must be
noted that one junior manager will handle operations that are related to filling of petrol in
tank. There will be another manager that will look after the way in which trucks are
placed at dock for filling petrol in tank. By doing so congestion will be reduced on tank.
Apart from this, there will be a manager that will look after leakage and other operations
in respect to project in order to ensure that all actions will be taken on time and firm will
need to pay less amount of penalty to the government. By following explained
management structure project will be managed in better way. Style and culture: In the Apache corporation democratic leadership style will be
followed because by doing so useful suggestions are obtained from the stakeholders and
in this way activities related to the project are performed in better manner. Many times
senior managers to estimate and foresee probability of happening of any unfortunate
event. Junior manager observed that things easily (Burke, 2013). Thus, on time managers
alert their top manager about possible risks and challenges. In this way correct decisions
are taken by the managers on right time and management of the organization become
well.
1
Document Page
Levels and boundaries of authority: In order to manage project in proper way Apache
Corporation can determine the boundaries of authority for the managers. These
authorities must be determined in such a manner so that it can be clarify that what is the
scope of each manager in terms of work, delegation of work and exercising authority.
Different levels must be prepared in management like top, middle and lower level of
management. This classification will ensure that all operations are performed
systematically by the managers. In this way project can be implemented in proper manner
by the mentioned firm. Level of autonomy: Autonomy must be given to the managers sufficiently. At same time
it must also be ensured that that autonomy that is given to the managers is not so high. By
doing so it can be ensured that managers will not be able to misuse their power. It can be
said that level of autonomy must be clearly defined in the organization. In this regard, top
manager must identify the responsibilities of the junior managers and according only
relevant amount of authority must be given to the managers (Meredith and Mantel
2011). By doing so it will be ensured that required amount of powers are given to the
junior managers. It can be said that level of autonomy is the area where one needs to take
due care in order to ensure better management of the project. Personal skills: Personal skills are the one of the important characteristics of the leaders.
There are multiple skills that must an individual have like communication skills,
knowledge of domain, strong decision making power and ability to make prediction. Firm
must ensure that its managers that are involved in the relevant project possess these skills.
By doing so it can be ensured that mangers will be able to manage project in better way. Attributes and characteristics of project team: There must be some characteristics that
project team must have. One of them is to handle contingent situation (Schwalbe, 2015).
Relevant business firm must ensure that all related characteristics are in the team and
same will be able to manage the project even unprecedented situation may arise.
Management plan
Things that must be controlled Time: Time is the important factor that must be utilized by the firm in systematic manner.
It is very important to control mentioned thing in respect to the project. It must be noted
2
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
that for every project there is a pre-determined time period within which project must be
completed. Thus, firm have allocate all activities within the project in respect to time
frame in such a manner so that cost of project can be reduced to minimum possible extent
and same can be completed on time. Cost: Cost is another factor that need to be controlled by the business firm. Whenever
any project is commenced by the business firm cost is the main concern and due to this
reason it is very important to formulate appropriate strategy at initiation of the project. By
doing so it can be ensured that when project will come in operation already there will be
a plan that can be followed to control cost of the project. Cost in respect to the current
project that is related to tanks can be increased due to several reasons. Like any
unfortunate event takes place in the business or management failed to make accurate
estimate of likelihood of happening of certain event (Wysocki, 2011). All these things
lead to elevation in cost of the business. Thus, there is a need to develop proper risk
management system in respect to the project. Development of such kind of system
ensured that on time risk will be addressed and cost will remain in control in respect to
project. Resources: Resources are another factor that needs to be considered while preparing
project management plan. It is very important to control resources like money in respect
to development of tanks and purchase of steel patches because same are used to perform
multiple operations that are related to project. Thus, it is very important to ensure that
resources are allocated in proper manner among different activities. It is very important to
ensure that resources are allocated in proper manner. By doing so best way resources can
be used in the business and cost can be controlled. Quality: Quality is another factor that must be controlled to great extent. In the project,
in different tanks steel patches will be installed and clearing and repaint of the tank will
be done (Walker, 2015). Proper installation of steel need to ensure because by doing so it
can be ensured that in future leakage of oil will not take place from tank.
Tools and techniques of control Time: Time cannot be controlled but activities that are performed within the given time
period can be controlled to great extent. In this regard on the basis of current research and
past experience the reasonable amount of time can be fixed that need to be taken in order
3
Document Page
to perform specific activity of the project. In this regard on software’s like Tableau
charting of targeted time for each activity can be done with the charting of data that is
related to progress in terms of time that is covered up out of allocated duration. This will
help management in identifying whether activity will be completed within time or there is
need to take action to complete activity on time. Cost: In order to control cost MS project software can be used and under this it can be
identified that which activities in respect to current project that is related to oil tanks can
be delayed and must be performed (De Bakker Boonstra and Wortmann, 2010). In order
to complete crucial or cost sensitive activities tasks that can be delayed can be performed
latter and by doing so it can be ensured that cost of project will remain in control. Resources: In order to control resources first of all Apache Corporation must determine
the overall availability of the resources in the business project. Thereafter, it must be
determined that in respect to building of oil tanker what amount of resources will be
needed. Accordingly allocation of resources must be done across varied activities. Time
to time track down must be done in respect to consumption of resources. By doing so on
time steps can be taken in case it is identified that in project firm may observe scarcity of
resources in the business. Quality: Quality is the another factor that need to be control by the manager and in this
regard relevant entity will consistently take follow up from the employees that are
working at ground level. This will help managers in determining that up to determined
mark level high quality of work is done at project site in proper manner and all things are
in full control. There must be a proper structure under which it can be ensured that all
things in terms of quality are properly managed by the employees. All these things lead to
success of the project.
Areas for successful management of case study project
There are number of areas on which due attention can be given for successful
management of the case study project. One of the important thing where there is need to pay due
attention is to ensure that steel container that is proposed to be placed at ground level in installed
in proper manner (Jun, Qiuzhen and Qingguo, 2011). One of the important thing that need to be
consider is that every year business firm is paying big amount due to leakage of oil from well.
Current project must be implemented in such a manner that lead to reduction in leakage of oil.
4
Document Page
This will benefit a lot to the organization. Apart from this, steel container that will be purchased
must be according to well. It can be said that these are the two areas of success of the current
study project.
Project performance and evaluation
Methods of project evaluation
Budget: Budget is the statement which reflects the cash inflows and outflows in respect to the
project. In the budget in respect to the current project all expenses values will be projected that
can be incurred in the current project (Caniëls and Bakens, 2012). Actual values are compared
with the current one in order to measure firm performance. Budget can be prepared for any time
period whether it is years, quarters or month. Merits and demerits of budget are explained below.
Merits
One of the main merit of the project evaluation method is that managers will be able to
keep close eye on the expenses that are made in the current project. By comparing actual
values with projected values project performance is tracked in terms of control or lack of
control on expenses.
The other main merit of budget is that different sort of budgets can be prepared and
according to needs and requirements of the project appropriate one can be used for
making projections.
Demerits
One of main demerit of the budget is that sometimes managers make wrong predictions
and due to this reason accurate comparison cannot be made between the estimated and
actual values. This is the one of the main demerit of the budget method.
Wrong estimation can be made about the business environment and due to this reason
also budget can be prepared in wrong way. It can be said that budget is the purely
judgmental method.
Simulated values comparison with actuals: Under simulation likelihood of happening of certain
event is measured and likely changes that can be observed in risk scoring after implementation of
mitigation strategy can be identified in risk scoring. Merits and demerits of following method for
project evaluation is given below.
5
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Merits
Main merit of simulation method is that under this after implementation of risk mitigation
strategy changes that comes in risk level can be measured. If current risk level is more
than estimated risk level then it means that there is need to take more action in order to
control situation. Thus, through this method area where there is need to focus on project
can be identified by the project manager.
Demerit
Main demerit of this method is that in this method one have to estimate risk score. If risk
score will be estimated wrongly then entire model will produce wrong results and
decisions made on basis of same will also prove wrong. Thus, use of simulation model is
risky.
Selecting best one
Out of all these methods budget is the appropriate method because firm is not new in its
current business. It has long years of experience in the mentioned domain. It have internal data
and due to this reason it is able to make accurate prediction in respect to likely variables of the
budget. Thus, it can be said that it will be appropriate to select budget as project evaluation tool.
Project closure
Steps required to close project Preparing closing process: In this stage project closing process is determined by the
project managers by making consultation with relevant employees. It is the one of the
important step of project closure. Complete contract closures: All contracts that were in existence are ended at this stage
and information about same is communicated to all stakeholders (Wu and Low, 2010). Acceptance from stakeholders: Before project closure acceptance from stakeholders is
obtained and in detail final outcome of the project is explained to them. Final performance reporting: At this stage project manager prepare final performance
reporting in respect to current project that it headed for the specific time period. Post project review: After completion of project its review is taken in terms of
performance of the product.
6
Document Page
Entry of details in PMIS: In this stage all details related to project are entered in to the
system which further used for similar projects (10 steps at the time of project closure,
2017). Lessons learned: Document is prepared under which lessons learned in tough situation
are described in detail. Handover of product to stakeholder: In this stage product is shifted to the stakeholders.
CONCLUSION
On the basis of above discussion it is concluded that project management is the one of the
most important domain that is used by the business firms. Under this varied sort of decisions are
made by the business firms in respect to implementation, management of the business operations
in respect to the current project. It is also concluded that there are number of tools that are used
for the project monitoring by the business firms. Before selecting any method it is necessary to
select specific one by considering both merits and demerit. There are specific stages of the
project closure and each of them must be performed in proper manner. In this way project is
properly managed from starting point to end.
7
Document Page
REFERENCES
Books and journals
Burke, R., 2013. Project management: planning and control techniques. New Jersey, USA.
Caniëls, M.C. and Bakens, R.J., 2012. The effects of Project Management Information Systems
on decision making in a multi project environment.International Journal of Project
Management, 30(2), pp.162-175.
De Bakker, K., Boonstra, A. and Wortmann, H., 2010. Does risk management contribute to IT
project success? A meta-analysis of empirical evidence. International Journal of Project
Management, 28(5), pp.493-503.
Jun, L., Qiuzhen, W. and Qingguo, M., 2011. The effects of project uncertainty and risk
management on IS development project performance: A vendor perspective. International
Journal of Project Management, 29(7), pp.923-933.
Kerzner, H.R., 2013. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Meredith, J.R. and Mantel Jr, S.J., 2011. Project management: a managerial approach. John
Wiley & Sons.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Wu, P. and Low, S.P., 2010. Project management and green buildings: lessons from the rating
systems. Journal of Professional Issues in Engineering Education and Practice, 136(2),
pp.64-70.
Wysocki, R.K., 2011. Effective project management: traditional, agile, extreme. John Wiley &
Sons.
Online
10 steps at the time of project closure, 2017. [Online]. Available through :<
http://www.whizlabs.com/blog/10-steps-at-the-time-of-project-closure/>. [Accessed on 31st
May 2017].