This document discusses the preparation of schedule, budget, and risk management in project management. It includes a project schedule, relative merits of methods, tools, and techniques, stress point on the critical path, budget assumptions, and risk management tools and techniques.

Project Management: Schedule, Budget, Risk Management

Prepare relevant documentation for project schedule, resources, budget, and risk for a case study project.

   Added on 2022-11-11

ShareRelated Documents
Running head: PROJECT MANAGEMENT
Project management
Name of the Student
Name of the University
Author’s Note
Project Management: Schedule, Budget, Risk Management_1
PROJECT MANAGEMENT
1
Table of Contents
1. Preparation of schedule.......................................................................................................2
1.1 Project schedule...........................................................................................................2
1.2 Relative merits of the methods, tools and techniques.................................................5
1.3 Comparison with the tools that are not used...............................................................6
1.4 Stress point on the critical path...................................................................................7
1.5 Tools and techniques used for the critical path...........................................................8
2. Budget....................................................................................................................................8
2.1 Budget for the project.......................................................................................................8
2.2 Assumptions that are made in preparing the budget........................................................9
2.3 Actions required for controlling the cost.........................................................................9
3. Project risk management......................................................................................................10
3.1 Identification of tools and techniques that are used or risk management......................10
3.2 Qualitative and quantitative risk analysis with risk response strategies for mitigating
the risk..................................................................................................................................10
Bibliography.............................................................................................................................14
Bibliography.............................................................................................................................15
Project Management: Schedule, Budget, Risk Management_2
PROJECT MANAGEMENT
2
1. Preparation of schedule
1.1 Project schedule
The schedule which is prepared below for the renovation of the shop includes key
milestones as well as resources that are needed for the project.
WB
S
ID
Activity
description
Preceden
ce
Durati
on
estima
te
Resources Cost
Estimat
e
0 Renovation of
Royale Pizza
shop
6 mons AU$
40,000.00
1 Design stage 1 mon AU$
5,000.00
1.1 Conducting
meeting with the
designer
1 day Project management
consultant
AU$
200.00
1.2 Undertaking
sketch studies
2 4 days Designer, Project
management
consultant
AU$
300.00
1.3 Undertaking
preliminary
design for shop
renovation
3 5 days Designer AU$
1,500.00
Project Management: Schedule, Budget, Risk Management_3
PROJECT MANAGEMENT
3
1.4 Creating
detailed design
4 10 days Contractor,
Designer
AU$
3,000.00
1.5 Milestone 1:
Getting approval
for the project
design that is
developed
5 0 days AU$ 0.00
2 Procurement
and delivery
phase
2 mons AU$
18,000.00
2.1 Determining
suppliers and
other
construction
contractors
5 8 days Procurement
manager, Project
management
consultant, Project
manager
AU$
200.00
2.2
Recommending
vendors
8 5 days Procurement
manager, Project
management
consultant
AU$
300.00
2.3 Purchasing
orders and
executing
contracts
9 8 days Equipment suppliers AU$
7,000.00
2.4 Purchasing of
deep fryers,
10 9 days Equipment suppliers AU$
4,000.00
Project Management: Schedule, Budget, Risk Management_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Schedule Plan. Milestons. Due Dates. 1. Getting approva
|6
|444
|11

Schedule Plan. Milestons. Due Dates. 1. Proper design f
|6
|451
|11

Project Management: Royale Pizza
|17
|2562
|331

Budget Estimation.
|4
|483
|2

Schedule Plan. Milestons. Due Dates. 1. Getting approva
|6
|408
|3

Project Management for Renovation of Royale Pizza