Work Sequencing of Construction Plan

A guide on how to start a new project in Microsoft Project 2010, including creating a new project file, setting the project start date, and defining the project calendar.

6 Pages837 Words234 Views
   

Added on  2023-04-03

About This Document

This document discusses the work sequencing of a construction plan, including important procedures such as excavation, concrete work, construction of walls, roofing, and finishing. It also explains the use of the critical path method for scheduling construction activities.

Work Sequencing of Construction Plan

A guide on how to start a new project in Microsoft Project 2010, including creating a new project file, setting the project start date, and defining the project calendar.

   Added on 2023-04-03

ShareRelated Documents
Running head: PROJECT MANAGEMENT
Project Management
Name of the Student:
Name of the University:
Work Sequencing of Construction Plan_1
1PROJECT MANAGEMENT
Part 2
1. Precedence Diagram of construction activities
Work Sequencing of Construction Plan_2
2PROJECT MANAGEMENT
Figure 1: Precedence Diagram of the construction plan
(Source: Created by author using Ms Project)
2. Work sequencing of construction plan
The sequence of the construction work is followed into the construction of building based
on important construction procedures of the construction plan. The sequence of the work to be
followed for the building is considered as important procedures of the construction. The major
sequences of the construction work are:
1. Excavation and Backfilling
2. Concrete Work
3. Construction of the walls
4. Roofing of the work
5. Fixing of doors and windows
6. Fixing of electrical, mechanical and plumbing works
7. Final finishing of the construction work
In order to derive the work sequencing, there is used of scheduling ideas for the building
construction work. In Excavation and backfilling phase is consisted of paper work of the
building needed before the starting of the actual construction work. The paper work is prepared
of drawings and estimation of the construction cost (material, labor and contingencies), approval
of the construction drawings of the building from the city development authority. The approved
construction plan is being marked at ground first and then other floor. The layout is to be marked
on the ground with proper dimensions (Sears et al. 2015). Excavation is to be carried out for
Work Sequencing of Construction Plan_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Relationship Of The Ratio Between Longer to Shorter Span
|13
|1946
|21

Construction Footing System Assignment
|16
|1495
|199

Structural Principles for Commercial Low Rise Construction
|10
|1295
|112

Insulated Concrete Framework: The Best Modern Method of Construction for Self-Builders
|10
|3068
|405

CPCCBC4011B: Assessment 4 - Footing, Retaining Wall, Structural, Floor, Wall, Roof, Services, Fire Prevention, Quality
|9
|843
|328

Building Systems and Structural Connections for a Middle Rise Building
|11
|1147
|450