This assignment discusses different project, program and portfolio (PPPM) application systems and their advantages and disadvantages. It also explains how PPPM application systems can assist project managers to monitor performance and manage changes within a project. The appropriate PPPM application systems to support successful project execution in different industry domains are proposed. The contemporary developments in the use of PPPM application systems are also discussed.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
PROJECT MANAGEMENT METHODOLOGIES
Consolidated Portfolio
STUDENT NAME: <insert>
STUDENT ID: <insert>
LECTURER: <insert>
CAMPUS: <insert>
TERM: 1, 2018
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of contents
1 Introduction...................................................................................................................................3
2 Course Learning Outcomes...........................................................................................................3
Learning Outcome 1: Compare and contrast the advantages and disadvantages of different manual
and electronic project, program and portfolio (PPPM) application systems within each PPPM
knowledge area over the life cycle of a project, program or portfolio...............................................3
Learning Outcome 2: Identify how project, program and portfolio (PPPM) application systems can
assist project managers to monitor performance and manage changes within a project.....................4
Learning outcome 3: Propose appropriate project, program and portfolio (PPPM) application
systems to support successful project, program and portfolio execution in different industry
domains.............................................................................................................................................4
Learning outcome 4: Discuss contemporary developments in the use of project, program and
portfolio (PPPM) application systems...............................................................................................5
3 Discussion and Conclusion............................................................................................................5
4 BIBLIOGRAPHY.........................................................................................................................6
4 Appendix.......................................................................................................................................7
4.1 Portfolio 1..............................................................................................................................7
4.2 Portfolio 2............................................................................................................................10
4.3 Portfolio 3............................................................................................................................12
4.4 Portfolio 4............................................................................................................................14
4.5 Portfolio 5............................................................................................................................18
4.6 Portfolio 6............................................................................................................................20
4.7 Portfolio 7............................................................................................................................26
4.8 Portfolio 8............................................................................................................................29
4.9 Portfolio 9............................................................................................................................33
4.10 Portfolio 10..........................................................................................................................35
1 INTRODUCTION
Document Page
Various topics of project management has been assessed with the help of a number of portfolios for
the given assignment. A consolidated portfolio was created from 10 weekly portfolios and their
respective learning outcomes are assessed and evaluated. A summary and evidence section has
been proposed for every learning outcome. The justification for choosing the PPPM applications
has been assessed and evaluated.
2 COURSE LEARNING OUTCOMES
Learning Outcome 1: Compare and contrast the advantages and disadvantages of
different manual and electronic project, program and portfolio (PPPM) application
systems within each PPPM knowledge area over the life cycle of a project, program
or portfolio
Summary
In this assignment, I leant about PPPM application systems, different electronic and manual systems.
The main aim of every PPPM applications is to break down the difficult task into a number of easy
task so that the goal becomes achievable. I understand that the skill which is learned from this
experience is to gain the potential to manage a project and check it that the project gets to
completion. The advantages of the different systems over the span of the project includes the
inventory. The PPPM applications help to pinpoint where the resources are exactly. As the entire
process is fragmented, the applications help to provide a greater picture. This helps in the early
stages of the planning also learnt about the involvement factor. The manual and electronic projects
as well as the PPPM application helps to ensure that the project becomes successful. It also helped
me to understand the easy visibility of the performance issues in the project. I also came across
several disadvantages though. Resources can act as an advantage but it can also act as a
disadvantage in certain scenarios. I guess if a wrong person is made the head in charge of the
resources, it can lead to a lot of complexity in the project. Moreover, the prioritization of every
project needs to be checked so that the different elements of the entire portfolio are met. If there
are a number of projects going on, I can assume that it can lead to the wastage of resources in
organizing the labour and the operational costs of hiring them.
Evidence
I was recently involved in a field trip to assess the construction of a bridge. I learnt about the
different project management systems and how they are checked to assess the system. It gave me
an idea about throw different systems are applied in different domains of project management.
Learning Outcome 2: Identify how project, program and portfolio (PPPM)
application systems can assist project managers to monitor performance and
manage changes within a project.
Document Page
Summary
I decided to research a little but further about the PPPM applications and how they can provide the
managers an advantage in gaining a project success. I understood that the PPPM applications not
only runs the project but it also helps the project managers in choosing what types of executable
projects need to be chosen and how the funding need to be initiated. I learnt that it helps the
mangers in choosing the potential of every project and assess if they can support the goals and
objectives of the industry. This is how the managers eliminates the projects if they do not meet the
required criteria. To assess the performance and changes of the project, the contingencies and
interconnections of the project are assessed with the help of PPPM applications. As per my
understanding, the PPPM applications help the project manager to monitor the motion of the
project. The assessment helped me to understand how the monitoring of the portfolios of the
project are conducted and how they affect the projects which are in the portfolio.
Evidence
I was recently got involved with a press conference about project, program and portfolio application
systems. The conference helped me to assess the role of a project manager in a project and how
they can enhance their capabilities with the help of project, program and portfolio application
systems.
Learning outcome 3: Propose appropriate project, program and portfolio
(PPPM) application systems to support successful project, program and portfolio
execution in different industry domains.
Summary
This assignment helped me to learn about the different PPPM application system in a project related
to different domain of industry. The formal approach of the industries in prioritizing and
orchestration for the overall success of the project was understood by me. It helped me to
understand the different PPPM applications and selection methods. This assignment helped me to
understand the importance of PPPM applications in determining how the funds in a project need to
be utilized for properly returning the investment of the project. As an input to the selection process
of the project, the time value of money sometimes steers the project selection. It helped me to
assess how the future and present value of a project are determined and how different assumptions
are made. It helped me to learn about future value, interest rates and budget determination of a
project. The formulas of the present value helped me to assume the future value of the project.
With the help of different PPPM applications, I also learnt about how to determine the net present
value of the project. The financial based decisions overally determined the project selection
methods along with the PPPM applications.
Evidence
I recently learned about the organisational maturity levels and various PPPM applications from the
courses form our university. The assessment helped me to analyse different application systems
which helped me a lot in completing this assignment. I also learned the role of a project manager
from this assessment.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Learning outcome 4: Discuss contemporary developments in the use of project,
program and portfolio (PPPM) application systems.
Summary
In this assessment, I learned about the various developments that have happened in the PPPM
application systems. The longevity of the project is managed by the PPPM applications. The various
developments in the mentioned topic has been assessed in a PPPM research program. It included
about 400 organizations including non-governmental organizations and governmental agencies. A
general report, IT report, construction industry report and organizational change report were
developed which helped in assessing the various developments of the application systems.
Evidence
A survey related to information technology showed good results of a project to completion. It
constituted about 60 organization and several mini projects which were broken down for efficiency.
The use of PPPM applications were assessed.
3 DISCUSSION AND CONCLUSION
To conclude the report, it can be stated that four learning outcomes from the provided weekly
portfolios has been evaluated conclusively in the given assignment. The outcomes have been
evaluated according to their criteria and a small summary has been provided. The needs of a PPPM
application system for the success of a project has been discussed and evaluated.
Document Page
4 BIBLIOGRAPHY
Binder, J. (2016). Global project management: communication, collaboration and management
across borders. Routledge.
JOSEPH. PHILLIPS, P. M. P., CBAP, I., & PMP, C. (2018). PMP PROJECT MANAGEMENT PROFESSIONAL
STUDY GUIDE. McGraw-Hill Education.
Kerzner, H. (2018). Project management best practices: Achieving global excellence. John Wiley &
Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Leach, L. P. (2014). Critical chain project management. Artech House.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking project
management performance and project success. International journal of project management, 32(2),
202-217.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management. Project
Management Institute.
Document Page
4 APPENDIX
4.1 Portfolio 1
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
1. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
To manage the project, the leadership skills are important. Due to
lack of skills I faced some problems while handling my team due to
which I enhanced my leadership skills that are essentially needed to
attain by me for managing the project effectively. This is very
useful for me which provides me list about the leadership skills that
are required to become a successful and expert project manager.
Marsh, F. (2018). 10 Great
Leadership Skills of
Project Management.
[online] Available at:
https://aboutleaders.com/10
-great-leadership-skills-of-
project-management/
#gs.XWrPyJY [Accessed 3
Apr. 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
2. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
It is difficult for me to measure and attain the success but after
understanding that what aspects need to be focussed to attain
success effectively which is major demand towards the project as a
project manager. In last assignment I got very less marks due to
some problems in my assignment but after recognizing it that the
critical thinking is very important, I easily got good marks in my
next assignments.
Egelstaff, R. (2013).
Preparing and Writing
Academic Assignments -
Richard Egelstaff. [online]
YouTube. Available at:
https://www.youtube.com/
watch?v=I5UYb3d094M
[Accessed 3 Apr. 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
3. Assess the
relevance of
systems
engineering to
project cases.
The project success in defined as the accomplishment of all the
activities within all the constraints such as performance, cost and
time. The project manager should be able to handle the complete
project as per given schedule so that all the constraints will be
clearly fulfilled which is very necessary for the success of each
project. It is essential to complete the project within the original
scope only.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
4. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
PPMP20012 Unit Profile
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
5. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
Critical thinking and writing involve various types of essays,
papers, assignments and others. These all need to be done carefully
in order to get accurate results. In order to write this, proper
knowledge and skills are very important in the person so that all
things can be done accurately.
KERZNER, H.
(2009). PROJECT
MANAGEMENT.
[online] Available at:
http://honestyets.
pbworks.com/f
/Project+Mana
gement+-+A+
Systems+
Approach+-+
10thEd.pdf
[Accessed 4 Apr
. 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
6. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
Before understanding the concept of the project management, it is
essential to understand what exactly a project is. Any project can be
simply considered as a series of different activities as well as tasks
that have some specific objectives. There are mainly five different
process groups which can be considered and identified in the
PMBOK Guide. These five different process groups are the project
initiation, project planning, project execution, project monitoring
and control and project closure
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
7. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
It helps me to be a perfect in the field of project manager while
managing my college project. It defines me that, the honesty is the
major requirement of every organization and I need to focus at this
aspect properly.
White, D. and Fortune, J.
(2002). Current practice in
project management — an
empirical study.
International Journal of
Project Management,
20(1), pp.1-11.
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
8. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
It is a demand of every project manager to become accurate and
better in respective field. For this, the manager must utilise the
consistent estimating as well as scoping process so that and also use
helpful tools related to project management. The project manager
needs to be honest and realistic while managing the project which is
also an important aspect which is considered by all the
Rose, K. (2015).
Effectiveness in Project
Portfolio Management.
Project Management
Journal, 46(1), pp.e4-e4.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
organizations while hiring project manager for any project. These
tools involve Gantt chart, WBS and other tools.
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
9. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
The effectiveness of project management can be seen through the
status of the project like- if it satisfies all the requirements of the
client then it is considered as highly efficient project. Along with
this, it should also be useful in maintaining the quality level of the
project.
Mishra, K. and
Sudarsanam, D. (2016).
Project Expectation
Management – A Quality
Approach to Customer
Satisfaction. Adhyayan: A
Journal of Management
Sciences, 5(1).
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
10. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
When I was working as a project developer in a company, I could
see the project manager’s conditionwhile maintaining the
expectations of the stakeholders involved in the project. So I
learned that while a person is working on the project, it is important
to control the expectations of the team members as well as the
stakeholders of the project.
Marsh, F. (2018). 10 Great
Leadership Skills of
Project Management.
[online] Available at:
https://aboutleaders.com/10
-great-leadership-skills-of-
project-management/
#gs.XWrPyJY [Accessed 3
Apr. 2018].
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
portfolio
management—
Guidance on
portfolio
management;
4.2 Portfolio 2
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
11. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
With the use of highly appropriate project methodology, the scale
of project planning can be enhanced eventually. Project
methodologies cover each and every phase that needs to be focused
so that no problem can occurs during project development and
delivery.
Vukovic, Z. (2018).
PROJECT
MANAGEMENT -
SOFTWARE
DEVELOPMENT
METHODOLOGY.
[online] Available at:
http://ftp://ftp.repec.org/opt
/ReDIF/RePEc/osi/journl/P
DF/InterdisciplinaryManag
ementResearch/
IMR1a5.pdf [Accessed 8
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
12. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
When I was preparing WBS for my college project I found various
problems such as- assigning appropriate resources over each
module and managing their cost per hour. It took more than an hour
to design and develop the work breakdown structure of my project.
Ibrahim, Y. (2018). SEMI-
AUTOMATIC
DEVELOPMENT OF THE
WORK BREAKDOWN
STRUCTURE (WBS) FOR
CONSTRUCTION
PROJECTS. [online]
Available at:
http://www.irbnet.de/daten/
iconda/CIB16457.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
13. Assess the
relevance of
systems
engineering to
project cases.
The project success in defined as the accomplishment of all the
activities within all the constraints such as performance, cost and
time. The project manager should be able to handle the complete
project as per given schedule so that all the constraints will be
clearly fulfilled which is very necessary for the success of each
Passenheim, O. (2013).
Project Management.
[online] Available at:
http://home.hit.no/~hansha/
documents/theses/projectm
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
project. It is essential to complete the project within the original
scope only.
anagement.pdf [Accessed 8
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
14. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
15. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
The detailed division of project leads to enhance the cost accounts
per module. Fluctuating requirements of the client cannot be
estimated. It consists of wide range of interdependent activities as
change in one will surely affect the previous one
Ibrahim, Y. (2018). SEMI-
AUTOMATIC
DEVELOPMENT OF THE
WORK BREAKDOWN
STRUCTURE (WBS) FOR
CONSTRUCTION
PROJECTS. [online]
Available at:
http://www.irbnet.de/daten/
iconda/CIB16457.pdf
[Accessed 8 May 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
16. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
As per my personal experience, it is very much important to handle
the fluctuating demand and requirements of the client because this
affects over the overall planning of the manager regarding effective
completion of the project.
Martins de Andrade, P.
(2016). CHANGE
MANAGEMENT:
IMPLEMENTATION
AND BENEFITS OF THE
CHANGE CONTROL IN
THE INFORMATION
TECHNOLOGY
ENVIRONMENT. [online]
6(1). Available at:
https://arxiv.org/ftp/arxiv/p
apers/1603/1603.03110.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
17. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
When I was working as a team member in the company, if analyzed
that there were conflicts with between the manpower due to the lack
of collaboration.
Picariello, G. (2015). The
Five Steps of The Project
Management Life Cycle.
[online] Bright hub Project
Management. Available at:
https://www.brighthubpm.c
om/monitoring-projects/19
07-successfully-guide-
your-projects-to-
completion-with-the-pm-
life-cycle/ [Accessed 8
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
18. Identify how
project, program
and portfolio
(PPPM) application Many conflicts occur in the planning cycle such as schedule
Kukhnavets, v.
(2016). How to Improve
Productivity With a Work
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
conflicts, priority conflicts, manpower conflicts, cost conflicts,
personality conflicts. By using the collaboration between the team
members, these conflicts can be removed.
Breakdown Structure?
[online] Gantt Pro.
Available at:
https://blog.ganttpro.com/e
n/how-to-create-a-work-
breakdown-structure-wbs-
with-project-planning-
templates/ [Accessed 8
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
19. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
Work is authorized by the functional manager in the first level of
the WBS. In the 2nd level, the functional manager is responsible to
prepare the budget and the in the 3rd level, schedules are prepared
by the functional manager.
Mishra, K. and
Sudarsanam, D. (2016).
Project Expectation
Management – A Quality
Approach to Customer
Satisfaction. Adhyayan: A
Journal of Management
Sciences, 5(1).
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
20. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
I analyzed that, these chapters helps me to understand the planning
concepts as well as the life cycle phases. With the help of these
chapters, I was able to understand the role of the different
participants involved in the project management.
Marsh, F. (2018). 10 Great
Leadership Skills of
Project Management.
[online] Available at:
https://aboutleaders.com/10
-great-leadership-skills-of-
project-management/
#gs.XWrPyJY [Accessed 3
Apr. 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
4.3 Portfolio 3
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
21. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
A project manager must possess skills such as:
Team management
Encourage communication
Risk assessment
Task and quality enhancement
Cost and time management
Harrin, E. (2015). 15 Skills
Project Managers Will
Need in 2015. [online]
PMO Perspectives Blog.
Available at:
https://www.strategyex.co.
uk/blog/pmoperspectives/1
5-skills-project-managers-
will-need-2015/
[Accessed 22 Feb. 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
22. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
While working in a project-basedorganization, I have observed that
the quality of project depends directly on the skills possessed by the
project manager. Required skills include:
Budget management
Dispute resolution
Strong knowledge base
Specified vision and enthusiasm regarding the task
Aggressiveness
Kerzner, H.
(2009). Project
management. 10th ed.
Hoboken, N.J.: John Wiley
& Sons, pp. 319-355.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
23. Assess the
relevance of
systems
engineering to
project cases.
In a team that works in accomplishing a project along with a project
manager an assistant, selection of appropriate project office and a
team of expert developers put their valuable efforts to make it a
success. Along with all these,some other members are providing
their support for timely completion of the project such as project
engineer, project coordinator, technical assistant, V.P. program
developer and so on.
Kerzner, H.
(2009). Project
management. 10th ed.
Hoboken, N.J.: John Wiley
& Sons, pp. 141-183.
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
24. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
PPMP20012 Unit Profile
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
25. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
Other than the specified skills effective project management should
possess appropriate hard and soft skills required to lead the project
and should be able to provide the team with a vision to achieve.
Selection of project manager is dependent on following factors:
Organizing with cooperation
Experience
Integrative thinking
Cooperative leadership
Conflict resolution
Decision-making
Pmi.org.
(2014). The expectations
manager. [online]
Available at:
https://www.pmi.org/learni
ng/library/expectations-
managers-future-project-
management-9392
[Accessed 23 Feb. 2018].
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Creativity
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
26. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
Wrong selection of project manager gives rise to some challenges
such as:
Unclear objectives
Lack of transparency in the project completion task
Reduced communication within the workgroups
Unmanaged resources
Inappropriate selection of stakeholders
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
27. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
Challenges that have been faced by the organisation because of
inappropriate selection of project manager were:
No clear definition of project success criteria or the specified
objectives
Lack of planning results in delayed project delivery by using
more than specified resources
As per the information provided under these chapters, I come to
know about how to manage the resources in order to deliver the
project to the client which is fully designed and developed as per
the specifications of the client.
KERZNER, H. (2009).
PROJECT
MANAGEMENT. [online]
Available at:
http://honestyets.pbworks.c
om
/f/Project+Management+-
+A+Systems+Approach+-
+10thEd.pdf [Accessed 21
Feb. 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
28. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
The effectiveness of project management can be seen through the
status of the project like- if it satisfies all the requirements of the
client then it is considered as highly efficient project. Along with
this, it should also be useful in maintaining the quality level of the
project.
Rose, K. (2015).
Effectiveness in Project
Portfolio Management.
Project Management
Journal, 46(1), pp.e4-e4.
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
29. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
When I was working as a project developer in a company, I could
see the project manager’s conditionwhile maintaining the
expectations of the stakeholders involved in the project. So I
learned that while a person is working on the project, it is important
to control the expectations of the team members as well as the
stakeholders of the project.
Mishra, K. and
Sudarsanam, D. (2016).
Project Expectation
Management – A Quality
Approach to Customer
Satisfaction. Adhyayan: A
Journal of Management
Sciences, 5(1).
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
30. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
When I was working in a company, the project was completed
under the constraints of the time, cost and resources while
satisfying the end-user with the quality of the project. This was the
best practice of the project I have undertaken in me learn.
Lock, D. (2004). Applied
Project Management: Best
Practices on
Implementation.
International Journal of
Project Management,
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
systems. 22(4), pp.347-348.
4.4 Portfolio 4
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
31. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
The project is classified according to different levels. There are
three classification levels of the project. The first level includes the
Low complexity and the risks of the project, second level includes
the medium complexity and the risk and the level three includes the
high complexity and Risk. Writing, A.
(2018). Different Types of
Organizational Structure.
[online] Chron. Available
at:
http://smallbusiness.chron.
com/different-types-
organizational-structure-
723.html [Accessed 7 May
2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
32. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
When I was working as a team member under certain project, it was
the responsibility of the project manager to assign the tasks to each
team member.
Nealwhitten group
(2013). How is a senior
project manager different
from a project manager?.
[online] The Neal whitten
Group. Available at:
http://nealwhittengroup.co
m/2013/01/q-how-is-a-
senior-project-manager-
different-from-a-project-
manager/ [Accessed 7 May
2018].
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
33. Assess the
relevance of
systems
engineering to
project cases.
Project manager’s responsibility is to assign the task to the team
members as per their skills. The project manager must be able to
recognize the skills of the team members and must have the
potential to manage the project effectively.
KERZNER, H.
(2009). PROJECT
MANAGEMENT. [online]
honestyets. Available at:
http://honestyets.pbworks.c
om/f/Project+Management
+-
+A+Systems+Approach+-
+10thEd.pdf [Accessed 7
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
34. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
Working with the executives is provided by the Kerzner in the 1.8
chapter of the book and the concept of project champions is
provided by the Kerzner in the 1.10 chapter. In the 10 chapter of the
kerzner book, the project sponsor is provided whereas the
management control is provided in the chapter 11.25.
KERZNER, H.
(2009). PROJECT
MANAGEMENT. [online]
honestyets. Available at:
http://honestyets.pbworks.c
om/f/Project+Management
+-
+A+Systems+Approach+-
+10thEd.pdf [Accessed 7
May 2018].
Mandatory
Readings
35. Explain the I experienced from my experience that I worked as a project
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
manager in a firm, and the project was not successfully completed
because proper requirements were not provided to the project team
members.
Alexander, M.
(2017). Project
management: 5 tips for
managing your project
budget. [online] CIO from
IDG. Available at:
https://www.cio.com/articl
e/2406862/project-
management/project-
management-project-
management-4-ways-to-
manage-your-budget.html
[Accessed 7 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
36. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
When I was working in the organization as an employee is
experienced that the company was not able to achieve successful
reputation in the market because the employees were not allowed to
express their creative ideas due to which the proper communication
was not held and it results in the over management.
Alexander, M.
(2017). Project
management: 5 tips for
managing your project
budget. [online] CIO from
IDG. Available at:
https://www.cio.com/articl
e/2406862/project-
management/project-
management-project-
management-4-ways-to-
manage-your-budget.html
[Accessed 7 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
37. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
It has been experienced by me that the in-house representative was
removed from the organization if proper contact is not maintained
between project sponsor and executives
Westland, J.
(2016). Project Plan
Template. [online] Project
Manager. Available at:
https://www.projectmanage
r.com/templates/project-
plan-template [Accessed 7
May 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
38. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
I experienced that the project was not developed successfully due to
the lack of the required resources.
M. Neuman, R.
(2018). What is the
difference between an
Owner’s Representative
and a Project Manager?.
[online] The Owner's Rep.
Available at:
https://ownersrepny.com/2
012/05/24/what-is-the-
difference-between-an-
owners-representative-and-
a-project-manager/
[Accessed 7 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
39. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
The project management is turned into over management when the
contribution to ideas are not allowed and when the real time
feedback is not provided.
Picariello, G. (2015). The
Five Steps of The Project
Management Life Cycle.
[online] Bright hub Project
Management. Available at:
https://www.brighthubpm.c
om/monitoring-projects/19
07-successfully-guide-
your-projects-to-
completion-with-the-pm-
life-cycle/ [Accessed 8
May 2018].
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
40. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
The project is managed by the project manager by satisfying all the
needs of the project that are associated with the end user of that
project. It is the responsibility of the project manager to provide all
the requirement of the project to the team members of the project
team, in order to develop the project successfully.
Alexander, M.
(2017). Project
management: 5 tips for
managing your project
budget. [online] CIO from
IDG. Available at:
https://www.cio.com/articl
e/2406862/project-
management/project-
management-project-
management-4-ways-to-
manage-your-budget.html
[Accessed 7 May 2018].
4.5 Portfolio 5
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
41. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
My personal experience over project planning is that it is the term
that helps in reducing the chances of project failure and enhanced
the chances of satisfaction of the client.
KERZNER, H. (2006).
Project Management.
[online]
Available
at:
http://honestyets.pbworks.c
om
/f/Project+Management+-
+A+
Systems+Approach+-
+10thEd.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
42. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
As per my personal experience, all plans are not required to be
made in each and every project. Plans always made on the basis of
project size, type and requirements of projects as per the client.
Ibrahim, Y. (2018). SEMI-
AUTOMATIC
DEVELOPMENT OF THE
WORK BREAKDOWN
STRUCTURE (WBS) FOR
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
problems. CONSTRUCTION
PROJECTS. [online]
Available at:
http://www.irbnet.de/daten/
iconda/CIB16457.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
43. Assess the
relevance of
systems
engineering to
project cases.
System engineering helps me a lot in making appropriate plan
regarding the completion of project within the specified time and
budget limits when I work as an intern within an organization.
Passenheim, O. (2009).
Project Management.
[online] Available at:
http://home.hit.no/~hansha/
documents/theses/projectm
anagement.pdf [Accessed 8
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
44. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
The procedure to upgrade the current scale of activities and status of
project from the initial stage to delivery is considered as continuous
improvement. The improvement can be considered as the reflection of
small efforts made over some area.
Ibrahim, Y. (2018). SEMI-
AUTOMATIC
DEVELOPMENT OF THE
WORK BREAKDOWN
STRUCTURE (WBS) FOR
CONSTRUCTION
PROJECTS. [online]
Available at:
http://www.irbnet.de/daten/
iconda/CIB16457.pdf
[Accessed 8 May 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
45. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
As I was working over an internship project so this particular information
helps me in reviewing that what resources are important to be
considered and whether I consider all of them or not.
Martins de Andrade, P.
(2016). CHANGE
MANAGEMENT:
IMPLEMENTATION
AND BENEFITS OF THE
CHANGE CONTROL IN
THE INFORMATION
TECHNOLOGY
ENVIRONMENT. [online]
6(1). Available at:
https://arxiv.org/ftp/arxiv/p
apers/1603/1603.03110.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
46. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
This particular information helps me in defining the objective of my
project over which I was Woking during my graduation. I come to know
that how to assign responsibilities to all the team members.
Passenheim, O. (2009).
Project Management.
[online] Available at:
http://home.hit.no/~hansha/
documents/theses/projectm
anagement.pdf [Accessed 8
May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
47. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
This information provides me appropriate knowledge and information
about the importance of defining the project’s scope before starting the
designing and developing phase of the project.
KERZNER, H. (2006).
Project Management.
[online]
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
Available
at:
http://honestyets.pbworks.c
om
/f/Project+Management+-
+A+
Systems+Approach+-
+10thEd.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
48. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
As I was working over a project whose objective and scope is getting
changed automatically after some period of time so this particular
information helps me in understanding the valid reasons for the
occurrence of the same.
Martins de Andrade, P.
(2016). CHANGE
MANAGEMENT:
IMPLEMENTATION
AND BENEFITS OF THE
CHANGE CONTROL IN
THE INFORMATION
TECHNOLOGY
ENVIRONMENT. [online]
6(1). Available at:
https://arxiv.org/ftp/arxiv/p
apers/1603/1603.03110.pdf
[Accessed 8 May 2018].
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
49. Propose
appropriate
project, program
and portfolio
(PPPM)
application
systems to
support
successful
project, program
and portfolio
execution in
different industry
domains.
Changes within the project can happen with the sudden change in the
project scope and another reason can be the changing requirements of
the client in between the project development.
Passenheim, O. (2009).
Project Management.
[online] Available at:
http://home.hit.no/~hansha/
documents/theses/projectm
anagement.pdf [Accessed 8
May 2018].
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any prior
learning
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
50. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
As per my personal experience, project and people needs to have some
changes so that their continuous improvement rate can be analysed
effectively.
KERZNER, H. (2006).
Project Management.
[online]
Available
at:
http://honestyets.pbworks.c
om
/f/Project+Management+-
+A+
Systems+Approach+-
+10thEd.pdf
[Accessed 8 May 2018].
4.6 Portfolio 6
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
51. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
System thinking application has broad impact on effective decision making.
Casual loop diagrams and archetype techniques are effective in system thinking.
In the Chief Counsel’s Report, BP had a good idea about systems thinking.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Liu, S., Forrest, J.Y. and
Yang, Y., 2015. Grey
system: thinking,
methods, and models
with applications.
Contemporary Issues
in Systems Science and
Engineering, pp.153-
224.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
52. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
After learning the weakly studies I can conclude that it does not matter whether
the loop is right or not. It reflects the story of groups is trying to depict. The
application from previous week was also measured. As experienced by me
during my courses, I understood the guidelines of the project management in
this project.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Goetsch, D.L. and
Davis, S.B.,
2014. Quality
management for
organizational
excellence. Upper
Saddle River, NJ:
pearson.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube:
What is
Portfolio
Management
vs. Project
Management?
53. Assess the
relevance of
systems
engineering to
project cases.
System engineering approaches and applications define the combination of
system elements. A system engineer assist to ensure that system elements fit
with accomplish the aims of the whole.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Keyte, B. and Locher,
D.A., 2016. The complete
lean enterprise: Value
stream mapping for
administrative and office
processes. Productivity
Press
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
54. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
As experienced from learning, there are certain problems associate with system
engineering concepts and methodologies. For a proper project execution
monitoring and realisation is one of the main aspect to consider.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Herrmann, N. and
Herrmann-Nehdi, A.,
2015. The Whole Brain
Business Book:
Unlocking the Power of
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
organise a project. Whole Brain Thinking
in Organizations,
Teams, and
Individuals. McGraw
Hill Professional.
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
55. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
Appropriate project management selection is essential for fulfilling proper
objectives. Otherwise it can develop problems for lack of knowledge needs to
execute a proper project in an effective manner. PM is responsible for decision
making, so the entire crucial parts are maintained in order to gain proper
validation.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Krumholz, H.M., 2014.
Big data and new
knowledge in medicine:
the thinking, training,
and tools needed for a
learning health system.
Health Affairs, 33(7),
pp.1163-1170.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
56. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
Knowledge management play a crucial role in the decision making. For proper
decision making there are certain knowledge associate with the project is
essential. PM application systems are effective to monitor and manage that
could lead to efficient knowledge management and decision making.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Remington, K. and
Pollack, J.,
2016. Tools for
complex projects.
Routledge.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
57. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
The scope for program management is larger than the project scope, and
the portfolio has an organization-wide scope which changes with the
strategic objectives of the organization. In program management, we
manage similar projects, while in portfolio management you manage
non-similar projects or different programs.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Khan, F. and Hashemi,
S.J., 2017. Introduction.
In Methods in Chemical
Process Safety (Vol. 1, pp.
1-36). Elsevier.
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
58. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
Project, program and portfolio (PPPM) application systems can assist project
managers to monitor performance and manage changes within a project
through knowledge audit plan and proper identification from Controlling
project, prioritising and authorising.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Obolensky, N.,
2017. Complex
adaptive leadership:
Embracing paradox
and uncertainty.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
manage changes
within a project.
Routledge.
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
59. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
For improving a project standard the appropriate project, program and portfolio
(PPPM) application systems can play a leading role through proper monitoring
and efficient resource use. The use of the project management has been
maintained for increasing various management strategies in the organization.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Khan, F. and Hashemi,
S.J., 2017. Introduction.
In Methods in Chemical
Process Safety (Vol. 1,
pp. 1-36). Elsevier.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
Mandatory
Readings
SEBoK
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Realization;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Deployment
and Use;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Product
and Service
Life
Management;
Part 3:
Systems
Engineering
and
Management:
Knowledge
Area: Systems
Engineering
Standards;
Kerzner (2013)
Chapters 23;
60. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
There are several contemporary developments in the use of project, program
and portfolio (PPPM) application systems. The intent is to use the Standard to
improve project portfolio management capability and practice in organisations,
which in turn promotes efficient resource use and more profitable project
outcomes. The use of the PPM portfolio has been maintaining the importance of
project management strategies in the operations in the organization.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Obolensky, N.,
2017. Complex
adaptive leadership:
Embracing paradox
and uncertainty.
Routledge.
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
AS/NZS
15288:2015
Annex E
Optional
Readings
AS ISO
21504:2016
Web Sites
YouTube: What
is Portfolio
Management
vs. Project
Management?
4.7 Portfolio 7
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
61. Relevance of
systems thinking to
the project,
program and
portfolio manager.
In this week, I have learnt about various system thinking requirements that are
to be followed by the project, program and portfolio manager. I understood that
simply installing specific software is not sufficient. The project, program and
portfolio managers need to undertake several project management procedures
like auditing, documentation, quality check and others.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
62. Different systems
thinking tools and
techniques to aid
project managers
solve project
problems.
I have learnt about various project management tools and techniques that are
being utilized for preparation of project plan. Further, I learnt about various
phases of a project that are to be prepared based on the allocation of work
packages within the same.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
63. Assess the
relevance of
systems
engineering to
project cases.
In this week, I learnt about the application of systems engineering in preparing
cases and plans for project. As a part of this learning, I applied systems
engineering concepts while developing comprehensive plans and attributes of a
project.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
SEBoK Part 4:
64. Describe how
systems
engineering
System engineering concepts and methodologies can greatly help the
organization of a project. System engineering concepts are utilized to develop
complex life cycles of project as well as the methodologies that are to be
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
applied.
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
65. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
Application of appropriate project management systems is necessary depending
on the type and nature of the project. Moreover, a project consists of internal
and external objectives that are to be fulfilled in course of the project. Selection
of appropriate project management application system defines how these
objectives will be fulfilled during the project life cycle.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
66. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
Project management application systems help to develop a particular project
management life cycle roadmap for project managers. As a result, decision
making can be much more effective than regular methods.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Schwalbe, K.,
2015. Information
technology project
management. Cengage
Learning.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
67. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
Manual project management applications system have low efficiency, is a very
slow process. However, the advantage is that each aspect of the system can be
manually changed and tuned. On the other hand, electronic systems are faster
and much more efficient but almost all the aspects are automatically
determined and applied.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Schwalbe, K.,
2015. Information
technology project
management. Cengage
Learning.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
68. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
PPPM application systems can help project managers to develop monitoring and
quality control plans and standards. Based on these standards, the project
manager can monitor the performances of the project and make changes based
on the standards set using the PPPM application systems.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Schwalbe, K.,
2015. Information
technology project
management. Cengage
Learning.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
BP News Wrap-
up
Web Sites
-
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
69. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
There several PPPM software tools and systems that can be used in project
management in various industries. Some of these systems are 4c Portfolio
Manager, Jira Portfolio, Clarity PPM and others.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Schwalbe, K.,
2015. Information
technology project
management. Cengage
Learning.
Mandatory
Readings
SEBoK Part 4:
Applications of
Systems
Engineering;
AS/NZS
15288:2015
Annex F & G
Optional
Readings
AS ISO
21504:2016
BP News Wrap-
up
Web Sites
-
70. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
PPPM application systems are now widely used in developing business cases and
project charters for various project planning phases. These projects includes all
types of project management like construction project management, software
project management and others.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Schwalbe, K.,
2015. Information
technology project
management. Cengage
Learning.
4.8 Portfolio 8
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
71. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
I learnt about systems thinking procedures that help project managers to
develop appropriate project plans. I have been thinking about the process that
can be learned from the project plan.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
72. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
Many software based system thinking tools are available in the market. Each has
its own feature that helps the project managers to use different types of
thinking like dynamic thinking, structural thinking and others.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Chapter 7;
Optional
Readings
-
Web Sites
-
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
73. Assess the
relevance of
systems
engineering to
project cases.
I learnt that project cases are built in systematic methods and phases. These are
developed using systems engineering techniques.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
74. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
I learnt about various engineering concepts and methodologies that are being
used by project managers. These concepts are utilized to develop the project
portfolio that is used for the actual project.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
75. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
I learnt that unless appropriate project management application systems are
utilized, the project may fail or face different errors and problems. PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
76. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
PM application systems largely help in finding the outcomes of some particular
decision making processes.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Web Sites
-
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
77. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
Electronic processes are faster but cannot be tuned as per requirements.
Manual processes are slower but values can be changed as per requirements.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
78. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
PPPM application systems can help project managers to develop monitoring and
quality control plans and standards. Based on these standards, the project
manager can monitor the performances of the project and make changes based
on the standards set using the PPPM application systems.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
79. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
There several PPPM software tools and systems that can be used in project
management in various industries. Some of these systems are 4c Portfolio
Manager, Jira Portfolio, Clarity PPM and others.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
80. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
PPPM application systems are now widely used in developing business cases and
project charters for various project planning phases. These projects includes all
types of project management like construction project management, software
project management and others.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Kerzner, H. and
Kerzner, H.R.,
2017. Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Document Page
4.9 Portfolio 9
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory
Readings
-
Optional
Readings
-
Web Sites
-
81. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
I have been experiencing various idea about the system that has been
maintaining the advantages of the undertaking operational abilities. The use of
the systems have been creating difficulties for the operational behaviour of the
company.
Burke, R. (2013).
Project management:
planning and control
techniques. New
Jersey, USA
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
82. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
I have encountered a few sorts of the reasoning devices that are utilized for
critical thinking. The utilization if the few registering apparatuses and
applications have been caught and I have encountered about conceptualizing of
assortment of instruments.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
83. Assess the
relevance of
systems
engineering to
project cases.
From my experience, I have comprehended the basic holding between
framework building and task cases for finishing an effective mission. These
specialized abilities may help in empowering the framework design for string
administration and specialized aptitudes.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
84. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
As far as I can tell, I have found out about strategies utilized amid creating plans
for preparing aptitudes and learning about the improvement of the task
administration.
Harrison, F., & Lock, D.
(2017). Advanced
project management:
a structured approach.
Routledge
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
85. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
in regards to
meeting the
internal and
external objectives
of a project.
This experience have helped me in providing variety of project management
methodologies in order to maintain proper application of PPPM. The external
and internal objectives of the organization have been understood by me. Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Chapter 7;
Optional
Readings
-
Web Sites
-
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
86. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
The understanding of project management application system can lead to
effective PM knowledge management and decision making. The application are
very vast and hard to understand. Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
87. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
The use if the several manual and electronic project management strategies
have helped in understanding the life cycle of program and portfolio.
Harrison, F., & Lock, D.
(2017). Advanced
project management:
a structured approach.
Routledge
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
88. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
I have learned about the functions of the PPPM methods and applications for
different project cycle for improving the project. Heagney, J.
(2016). Fundamentals
of project
management.
AMACOM Div
American Mgmt Assn.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
89. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
I have learned about the concept of PPPM and its applications in different
project cycle fields for improving project and ROI improvement. This has also
helped me in maintaining the use of managing project performance. Heagney, J.
(2016). Fundamentals
of project
management.
AMACOM Div
American Mgmt Assn.
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Web Sites
-
Mandatory
Readings
PMI (2013) The
Standard for
Program
Management --
Third Edition
Chapter 8;
PMI (2013)
The Standard
for Portfolio
Management
-- Third
Edition
Chapter 7;
Optional
Readings
-
Web Sites
-
90. Discuss
contemporary
developments in
the use of project,
program and
portfolio (PPPM)
application
systems.
This experience have been helping me in maintaining a keen approach to the
project management and PPPM applications and its functions.
PPMP20012 Unit Profile
PPMP20012 Moodle
Web site
Have you any insights
you can add from other
units you have studies or
readings you’ve made?
s
4.10 Portfolio 10
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
91. Explain the
relevance of
systems thinking to
the project,
program and
portfolio manager.
I have been adapting various idea of systems that have been creating
advantages in the organization operations. The use of the understanding
procedures and several difficulties need to be experienced by me.
Burke, R. (2013).
Project management:
planning and control
techniques. New
Jersey, USA
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
92. Identify different
systems thinking
tools and
techniques to aid
project managers
solve project
problems.
I have been experiencing several reasoning devices that can be used for critical
thinking. The use of little registering devices has been caught by me and
experienced various conceptualization of assortment.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
93. Assess the
relevance of
systems
engineering to
project cases.
I have experienced the basic connecting between the operation building and
organizational cases for ending up a mission. These specialized abilities may help
in empowering the framework design for string administration and specialized
aptitudes.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
94. Describe how
systems
engineering
concepts and
methodologies can
help a project,
program and
portfolio managers
organise a project.
I would say, I have found out about systems utilized amid creating plans for
preparing abilities and information about the improvement of the task
administration.
Harrison, F., & Lock, D.
(2017). Advanced
project management:
a structured approach.
Routledge
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
95. Explain the
importance of
appropriate
selection of project
management (PM)
application systems
This experience has helped me to comprehend the best possible utilizations of
PPPM in achieving the outer and inner hierarchical targets. I think the PPPM
applications enable the framework chiefs to improve their administrative and
additionally authority abilities.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
in regards to
meeting the
internal and
external objectives
of a project.
and controlling. John
Wiley & Sons
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
96. Describe how the
use of project
management (PM)
application systems
can lead to
effective PM
knowledge
management and
decision making.
The comprehension of venture administration application framework can
prompt powerful PM learning administration and basic leadership. The
application are exceptionally immense and difficult to get it. Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
97. Compare and
contrast the
advantages and
disadvantages of
different manual
and electronic
project, program
and portfolio
(PPPM) application
systems within
each PPPM
knowledge area
over the life cycle
of a project,
program or
portfolio.
Distinctive manual and electronic task program and portfolio framework inside
each PPPM learning region over the life cycle of a venture, program or portfolio
has a few preferred standpoint and drawback over the undertaking execution.
Harrison, F., & Lock, D.
(2017). Advanced
project management:
a structured approach.
Routledge
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
98. Identify how
project, program
and portfolio
(PPPM) application
systems can assist
project managers
to monitor
performance and
manage changes
within a project.
This experience has helped me in understanding the elements of PPPM
strategies and applications for various undertaking cycle with a specific end goal
to enhance the task. The experience has likewise helped me to see how they are
utilized for dealing with the undertaking execution.
Heagney, J.
(2016). Fundamentals
of project
management.
AMACOM Div
American Mgmt Assn.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons
Mandatory
Readings
SEBoK:
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
99. Propose
appropriate
project, program
and portfolio
(PPPM) application
systems to support
successful project,
program and
portfolio execution
in different industry
domains.
This experience has helped me in understanding the elements of PPPM
strategies and applications for various venture cycle keeping in mind the end
goal to enhance the undertaking. The experience has likewise helped me to see
how they are utilized for dealing with the undertaking execution.
Heagney, J.
(2016). Fundamentals
of project
management.
AMACOM Div
American Mgmt Assn.
Mandatory
Readings
SEBoK:
100.Discuss
contemporary
developments in
This experience have helped in giving a superior way to deal with a few
employments of PPPM applications and its capacities including IBM Maximo,
Oracle, SAP and Microsoft Project) and also electronically.
Harrison, F., & Lock, D.
(2017). Advanced
project management:
Document Page
Reading
samples
Learning
outcomes of
the unit
Learnings from your weekly study, experience,
this and prior unit readings and assignments
Supporting
documentation
including any
prior learning
'Introduction to
SEBoK'
SEBoK:
'Introduction to
Systems
Engineering';
SEBoK: Part
7: Systems
Engineering
Implementati
on Examples
Kerzner (2013)
Chapters 2.1;
2.6 - 2.8; 2.21;
AS/NZS
15288:2015
Introduction;
Optional
Readings
AS ISO
21504:2016
Project,
programme and
portfolio
management—
Guidance on
portfolio
management;
the use of project,
program and
portfolio (PPPM)
application
systems.
a structured approach.
Routledge
chevron_up_icon
1 out of 46
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]