ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Project Management Methodologies

Verified

Added on  2023/06/12

|46
|11155
|93
AI Summary
This consolidated portfolio provides an understanding of the need for different project management methodologies in successful execution of a project. It covers the impact of project management methodologies on stakeholders, the major elements of project management methodology, and the reasons why organizations adopt project management methodologies. The portfolio includes references to various sources and is relevant to the PPMP20009 course.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
PROJECT MANAGEMNET METHODOLOGIES
PPMP20009
Consolidated Portfolio
STUDENT NAME: <insert>
STUDENT ID: <insert>
LECTURER:<insert>
CAMPUS: <insert>
TERM: 1, 2018

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Table of contents
1 Introduction...................................................................................................................................3
2 Course Learning Outcomes...........................................................................................................3
2.1 Learning Outcome 1: Explain reasons why organisations adopt Project Management
Methodologies...................................................................................................................................3
2.2 Learning Outcome 2: Critically analyse the impact of Project Management Methodologies
upon stakeholders..............................................................................................................................4
2.3 Learning outcome 3: Explain and justify the major elements of a Project Management
Methodology that might meet the needs of an organisation...............................................................4
3 Discussion and Conclusion............................................................................................................4
4 References.....................................................................................................................................4
5 Appendix.......................................................................................................................................4
5.1 Portfolio 1..............................................................................................................................5
5.2 Portfolio 2..............................................................................................................................5
5.3 Portfolio 3..............................................................................................................................5
5.4 Portfolio 4..............................................................................................................................5
5.5 Portfolio 5..............................................................................................................................5
5.6 Portfolio 6..............................................................................................................................5
5.7 Portfolio 7..............................................................................................................................5
5.8 Portfolio 8..............................................................................................................................5
5.9 Portfolio 9..............................................................................................................................5
5.10 Portfolio 10............................................................................................................................5
5.11 Supporting documents...........................................................................................................5
Document Page
1 INTRODUCTION
In this course, we have been provided with the concept and use of project management
methodologies in different organizations, for managing their projects. Success of the project is
mainly associated with contribution of the project head and the project manager. The success of any
project mainly depends on the approach that is undertaken by the organization in managing any
projects. A project management life cycle includes phases such as project initiation, project planning,
project execution, monitoring and the closure. Dividing the entire project in these phases enables
better management of each phase resulting in successful completion of the project (Kerzner &
Kerzner, 2017). It is the responsibility of the project manager to properly govern the different phases
of the project that will ensure its successful completion. The week 1 learning has provided me with
knowledge about the need of identifying the constraint of the project. There are certain negative
factors associated with the execution of the project. Proper identification of the negative aspects of
the project that include time constraint, cost constraint schedule issues are needed in order to
eliminate or reduce the chances of project failure. The use of certain project management tools such
as Gantt charts, checklist, risk registers helps in proper identification of the issues associated with
the project.
Throughout the learning of these 12 weeks, we have gained substantial knowledge about the
different project management processes that helps in completion of a project. The choice of the
project management methodology is therefore a crucial decision for any project. This course has
helped me in understanding the reasons why different organization adopts project management
methodologies. Project management methodologies are generally adopted by a number of
organizations as it helps in easier management of the different projects undertaken by the
organization. In this course we have learnt about the PMP code of ethics that is needed for
enhancing the professional development while working in a project as a manager (Marcelino-Sádaba
et al., 2014). This unit provided with the knowledge about the best practices that the enterprises
should adopt in order to successfully execute a project. In this context, the impact of the project
management methodologies upon the stakeholders is analyzed as well. The stakeholders are an
important part of any project or an organization as they are responsible in successful execution of a
project (Beringer, Jonas & Kock, 2013). There are certain elements of project management
methodology that might meet the needs of an organization. This consolidated portfolio has been
prepared in order to justify the learning outcomes that have been gained while attending this
course. The following paragraphs provide and detailed analysis of the learning outcomes of this unit.
2 COURSE LEARNING OUTCOMES
2.1 Learning Outcome 1:Explain reasons why organisations adopt Project Management
Methodologies
Summary
It was quite interesting to learn about the different project management methodologies and the use of
these project management methodologies in the organization. Different organization adopts the
project management methodologies in order to enhance the process by which a project is implemented
in the organization. The use of project management methodologies helps in successful execution and
there are a number of benefits of making use of project management methodologies in an organization
Document Page
(Caniëls & Bakens, 2012). The use of project management methodologies in an organization helps in
defining the roles of the human resources in the project. The use of project management
methodologies helps the clarifying the needs of the project so that the project is delivered within the
scheduled time. Therefore it can be said that the project management methodologies help in
identifying the different constraints of the project. The proper and effective implementation of the
project management methodology helps in analyzing the different issues associated with the project.
This is one significant reason that different organizations make use of project management
methodologies in successful execution of a project.
In this unit we have learnt about the different critical success factors that are associated with the
project. Proper project monitoring and project governance helps in successful implementation of a
project as the projects constraints can be easily identified with the successful project implementation.
In this unit, I have understood that the process of project management is mainly associated with the
effective management of the project and therefore, different organizations make use of the project
management methodologies in successful execution of the project (Devi & Reddy, 2012). However,
the organization needs to have a proper idea about the different tools and techniques of proper
management in order to ensure that the project is implemented without any issues or constraints. The
different project management tools include scheduling tool such as Gantt Chart, Risk register for risk
management and so on. These project management tolls helps an organization in efficient
management of the business processes associated with the organization. However, it is the duty of the
project manager to ensure that the project is implemented in a planned approach and there are no
issues associated with the implementation of the project following the approach. Therefore, the use of
different project management methodologies is integral for any organization.
Evidence
This unit has provided with detailed knowledge of the project management methodologies
that an organization implements for successful completion of the project. The learning about
the different project management methodologies is reflected in the portfolios of week 1, 2,
and 4. Previously I have worked in a project that made use of project management
methodology in successful completion of the project. The use of project management
methodology helps an organization in successful completion of the project.
2.2 Learning Outcome 2: Critically analyse the impact of Project Management
Methodologies upon stakeholders
Summary
Stakeholders are an important part if any organization or a project. This is because the stakeholders
are responsible for setting the goal of the project. Stake holders are important as the success of the
project largely depends on the stakeholders. It is therefore essential to keep the project stakeholders
engaged with the project. The implementation success of the project can be achieved only if the
stakeholders of the project are properly managed. Stakeholders include senior management of the
organization or the people who are providing resources for the project. The stakeholders of the project
are important as they are putting their money on the project. The stakeholders of the project are
largely affected by the results of the project since their resources are associated with the project
(Doloi, 2012). The stakeholders are often critical about the project success and therefore it is essential

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
to keep the stakeholders of a project managed. Active involvement of the stakeholders in a project
might result in the successful execution of the project. The active involvement of the stakeholders is
critical in defining, designing and producing the deliverables of the project.
The stakeholders, who are often the customers of the project will expect their work to be completed in
a scheduled time. The choice of project management methodologies ensure that the project is
implemented in a scheduled time. Therefore, it can be said that the choice of project management
methodology has a huge impact on the success of a project (Dybå, Dingsøyr & Moe, 2014).
Furthermore, the engagement of the stakeholders with a project is quite essential as it builds support
and enthusiasm in the work processes of the project. The choice of the project management
methodology ensures that the project is governed and regularly tracked so that there are no chances of
project failure. This unit has helped in gaining a detailed understanding of the impact of a chosen
project management methodology on the stakeholders involved with the project. Stakeholder
management is an important part of the project as it helps in setting up a realistic project goal. This is
mainly because the stakeholders of a project are responsible for determining the project goal.
Evidence
In this unit, I have gained a substantial knowledge about the stakeholders of the project which
is reflected in the portfolio of week 2. While working on a project, I have understood the
importance of project stakeholders and their contribution in ensuring the success of the
project. The need of keeping the stakeholders managed throughout the implementation phase
of the project is vital as the stakeholders are providing the resources for successful project
execution. The knowledge about the stakeholders that I have gained in this unit is reflected in
the portfolio of week 7 as well. The choice of project management methodology has a huge
impact on the stakeholders of the project as the project stakeholders provide the necessary
resources needed for successful project execution.
2.3 Learning outcome 3: Explain and justify the major elements of a Project
Management Methodology that might meet the needs of an organisation
Summary
There are certain elements of the project management methodology that an organization need in order
to successfully execute the project. The choice of the project management methodology is integral for
success of a project as it will ensure that the project will be successfully executed. There are different
elements of project management methodology that an organization needs, which include, proper
planning of the project deliverables, Identification of the scope of the project, proper evaluation of the
time and schedule that the project will need to be delivered along with the associated project
constraints. The constraints of the project include the cost constraint, schedule issue, resource
constraint and risks associated with the project (Fleming & Koppelman, 2016). These elements of
project management methodology help an organization in understanding the goals of the project. The
importance of the project management methodologies and the different elements of the project
management methodology are significant for an organization as the main purpose of an organization
is to ensure that the project is implemented according to the goals of the project (Heagney, 2016).
Project scheduling is an important tool or element of project management that is essential for
successful execution and completion of the project. This is one of the major elements of project
management methodology that an organization needs in order to successfully execute a project. Apart
Document Page
from project scheduling, proper resource allocation is an important element of project management
methodology. The stakeholders of the project are an important part of a project (Kerzner, 2017). The
stakeholders of the project are essential as they are responsible for allocating the resources of the
project. The resource allocation is an essential part of the project as the success of the project largely
depends on correct allocation of the resources of the project.
Evidence
The knowledge about the different elements of the project management methodologies is
reflected in the portfolio of week 9 and week 10. Previously while working in a project, I
have gained a knowledge about the major elements of a project management methodologies
mainly the need of project scheduling and the resource allocation in successful project
execution.
3 DISCUSSION AND CONCLUSION
Throughout 12 weeks of learning about project management methodologies, I have
understood the fundamental knowledge about the need of different project management
methodologies in successful execution of a project. The choice of the project management
methodology plays a significant role in determining the success of a project. The need of
project management methodology is integral in an organization or a project as the choice of
the project management methodology helps in successful execution of the project. In this
consolidated portfolio the learning outcomes that is realized while attending this unit is
drafted. The 12 weeks’ learning has provided with a knowledge of project management
methodology, the role of project stakeholders in a project and the elements of the different
project methodologies. One of the important elements of project management methodology is
project planning as it helps in aligning the project objectives with the identified goals of the
project. The requirements of the project are needed to be identified so that the proper project
management methodology can be chosen. The choice of the project management
methodology is integral for a project as it makes the process of project execution simple and
effective.
4 REFERENCES
Beringer, C., Jonas, D., & Kock, A. (2013). Behavior of internal stakeholders in project
portfolio management and its impact on success. International Journal of Project
Management, 31(6), 830-846.
Caniëls, M. C., & Bakens, R. J. (2012). The effects of Project Management Information
Systems on decision making in a multi project environment. International Journal of
Project Management, 30(2), 162-175.
Devi, T. R., & Reddy, V. S. (2012). Work breakdown structure of the project. Int J Eng Res
Appl, 2(2), 683-686.
Document Page
Doloi, H. (2012). Cost overruns and failure in project management: Understanding the roles
of key stakeholders in construction projects. Journal of construction engineering and
management, 139(3), 267-279.
Dybå, T., Dingsøyr, T., & Moe, N. B. (2014). Agile project management. In Software project
management in a changing world (pp. 277-300). Springer, Berlin, Heidelberg.
Fleming, Q. W., & Koppelman, J. M. (2016, December). Earned value project management.
Project Management Institute.
Heagney, J. (2016). Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Kerzner, H. (2017). Project management metrics, KPIs, and dashboards: a guide to
measuring and monitoring project performance. John Wiley & Sons.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. and Villanueva, P., (2014).
Project risk management methodology for small firms. International journal of
project management, 32(2), pp.327-340.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
5 APPENDIX
5.1 Portfolio 1, 2, 3 and 4
WEEKLY PORTFOLIO LEARNING TABLE
Topic
and
readin
g
sampl
es.
Your personal
learning
outcomes from
thisunit.
Learnings from
your experience.
Supporting
documentation
including your
prior learnings.
Week
1
Success of a project is
directly proportional to the
contribution made by the
heads of the project
Kerzner (2013) explained
the success of a project can
be measured through the
actions undertaken by
three group members
including customer’s
organization, parent
organization, and parent
organization
I am associated with an
organization that does not
have any PMO however;
effectively team members
are managing the
operational activities
within the organization. I
identified that there is a
fine line of difference
between the favorable
selection and continued
business for the proposed
tender.
The actions explained by
the Kerzner within a
project management
include the project
initiation, planning,
execution, and control and
monitor, and project
closure. These approaches
and phases will be helpful
in executing the project in
proper managerial way
that can be helpful in
managing the constraints
of the project. The project
manager plays the most
crucial role in the
execution and delivery of
the project. The main
objectives of the project
include the above
mentioned phases and the
project manager have to
develop the project plan,
execute the plan and
Kerzner, H. and Kerzner,
H.R., 2017. Project
management: a systems
approach to planning,
scheduling, and controlling.
John Wiley & Sons.
Harrison, F. and Lock, D.,
2017. Advanced project
management: a structured
approach. Routledge.
Document Page
Topic
and
readin
g
sampl
es.
Your personal
learning
outcomes from
thisunit.
Learnings from
your experience.
Supporting
documentation
including your
prior learnings.
continuously monitor and
audit the changes those
need to be implemented in
manner to keep the
project on track. The
success factor of the
project is the direct result
of the effort provided by
the project manager within
the project.
Week
2
The facts learnt in the
previous class are the
major constraints of the
project that even if the
manager fails in single
constraint, the whole
project will be moved
towards the failure.
Proper and effective
implementation of the
OPM can be helpful for the
organization in manner to
relate the objectives and
goals of the project with
the program, PM practices
and principles, portfolio
and program.
I learnt the negative
factors of the project those
are capable of sinking the
project and single project
constraint can affect the
whole project. Despite of
these factors, the project
could be delivered
successfully through the
application of the proper
and effective tools and
techniques such as
portfolio management,
Project Scheduling using
Gantt Chart, using MS
project, checklist, and
others. I learnt about the
stakeholder analysis that
depicts how to identify the
roles and responsibilities of
the stakeholders, how can I
deliver an effective
communication between
other team members and
executives. Requirement
analysis was another phase
of the project that
emphasizes on the
identification of the
functional and non-
functional requirements of
the project. Cost analysis,
HR, Risk, Change
management,
Harrison, F. and Lock, D.,
2017. Advanced project
management: a structured
approach. Routledge.
Kerzner, H., 2018. Project
management best practices:
Achieving global excellence.
John Wiley & Sons.
Document Page
Topic
and
readin
g
sampl
es.
Your personal
learning
outcomes from
thisunit.
Learnings from
your experience.
Supporting
documentation
including your
prior learnings.
Procurement, and quality
were also included in this
learning. This guide helped
and assisted me towards
the identification of the
scope of the project. I
learnt about these facts
and interrelation between
the Organizational Project
Management in manner to
enhance the performance
of the organization.
Week
3
PMP code of Ethics
I learnt about the various
practices that can be
helpful in enhancing the
professional development
within a project as a
manager and what are the
possible and effective
approaches towards
problem solving attitude.
These practices can
enhance an individual’s
personality. I also get to
know about the
importance of Staffing and
how it could be an effective
measure for the
organizational
development
Project manager should be
capable of handling the
every aspect of the project
through proper and
effective managerial and
leadership skills.
The workforce within a
project is completely
dependent on the project
manager and he or she has
the skills to communicate
with everyone and
managed everyone to be
motivated towards
objectives and goals of the
project the best practices
according to me for the
management of the work
force are the cost saving
realization, subcontractor
evaluation, and
experienced gained from
the previous projects
JOSEPH. PHILLIPS, P.M.P.,
CBAP, I. and PMP, C.,
2018. PMP PROJECT
MANAGEMENT PROFESSIONAL
STUDY GUIDE. McGraw-Hill
Education.
Heldman, K., 2018. PMP:
project management
professional exam study guide.
John Wiley & Sons.
Week
4
I learnt how to prepare a
proposal for the
accomplishment of the
objectives and activities of
The constraints of the
project can be efficiently
and effectively deliver
within the context of the
Kiu, M.S., Riazi, M., Riazi, S.,
Nawi, M., Nasrun, M. and Esa,
M., 2017. The roles, challenges
& improvement of project

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Topic
and
readin
g
sampl
es.
Your personal
learning
outcomes from
thisunit.
Learnings from
your experience.
Supporting
documentation
including your
prior learnings.
the project that will be
specifying the roles,
responsibilities, schedule,
and sectors of the
individuals involved in the
project. I learnt the
preparation of the WBS,
prepare the schedule of
the project, set milestones,
depict milestones, and
determine the resources
and their needs.
I learnt about the risk
assessment process
including the identification,
implementation,
monitoring and changes,
those steps could be
helpful in ensuring the
growth and development
of the project in an
effective and efficient
manner.
project. However,
uncertainties are the
shadow of the project
execution those could be
predicted in the prior of
the project execution that
makes it the most
necessary component for
the project. Considering
the previous learnings, this
sector was very crucial and
could be accomplished in
an effective and efficient
manner if project is
undertaken by an
experienced or
professional project
manager
Auditing, monitoring, and
changes are the major key
success factor for any
project that needs to be
delivered whenever there
is chance for the
improvement in the
project. Practical
experiences also helpful
for the expectations those
need to be implemented
during the accomplishment
of these objectives within
the project. Understanding
the scope and having a
detailed specification will
set the expectation of the
product or service to be
delivered. “I have
experienced firsthand
when engaging contractors
that my expectations of
the completed product
differs from the outcome.
Normally a contractor will
only deliver as per the
quoted specification
manager in project financial
management in building
development in Penang,
Malaysia. International Journal
of Supply Chain Management
(IJSCM), 6(1), pp.238-245.
Heldman, K., 2018. PMP:
project management
professional exam study guide.
John Wiley & Sons.
Document Page
Topic
and
readin
g
sampl
es.
Your personal
learning
outcomes from
thisunit.
Learnings from
your experience.
Supporting
documentation
including your
prior learnings.
(Kerzner 2013).”
5.2 Portfolio 5
WEEKLY PORTFOLIO LEARNING TABLE: WEEK 5
Topic and
reading
samples.
Your personal
learning
outcomes
from this
unit.
Learnings from your
experience.
Supporting
documentation
including your
prior learnings.
Project
manageme
nt
methodolo
gies
Week
lecture 5
Presentati
on
From this particular
unit I have learned
about the best
practices which the
enterprise and an
individual should
make for the proper
success of any
project. The best
practices will
ultimately help in
having competitive
advantage.
The presentation file provides basic idea
which is required for assessing the read
lines. In the first stage, three
organizational that is organization
change management, sustained
leadership and continuous
improvement have been discussed in
details. In the further step project
feasibility has been taken into account.
In the third, a business case has been
provided for the executive proposal.
Feasibility of the project is mainly
analysed by cost benefit along with
strategic need. It is the duty of project
manager to analyse the present state of
the organization and depending on it
proper kind of blueprint must be
provided. Project manager and his team
members should access the present
state of the organization, followed by
future state. They should prepare a
proper kind of project plan. After that
they should conduct feasibility study
along with cost benefit analysis.
Feasibility analysis mainly help in
checking the fact that whether the
project will have completed in time or
not. While cost benefit analysis will help
analysing the fact the project will
provide financial benefits or not.
Lecture slide
Document Page
Topic and
reading
samples.
Your personal
learning
outcomes
from this
unit.
Learnings from your
experience.
Supporting
documentation
including your
prior learnings.
Kerzner
Chapter 1
This is inclusive of
learning. Various
methods of
classification of
project has been
provided.
In this part, I have analysed various
methods which are used for
classification of a project. A project is
mainly classified into various kinds of
groups and as per it per defined
functionality is provided.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Egelstaff
(2013)
Academic
assignmen
ts: Critical
thinking
and
writing
critically
It includes various
kinds of accessing
readiness which can
be used for
implementation of
organization PM.
In this part I have learned about various
roles and responsibilities of a project
manager of a team. Senior project
manager is mainly associated with
planning phase of large number of
documents.
Lecture slide
Journals &
Standards
Critical factors for the
success of a project
The ultimate reason behind the success
of a project is its monitoring in proper
way. Project manager is mainly
responsible for tracking the success of
any project. It mainly ensures the fact
that project is mainly schedules as per
the setting.
PMJ Change in
organization and
management of
project. (Slides from
lecture 5)
Project management is mainly
associated for effective management of
a project. It is mainly lead by a project
manager. It is mainly associated with in
transferring of power from the line
manager to the project manager. It is
not designed for transferring of power
rather it is much associated with
managing of project in more efficient
way.
Lecture slides
Tutorials
and
lecture
slides
Change in
organization and
management of
project. (Slides from
lecture 5)
Project management in organization of
project driven is generally compared to
a non-project and so growth of career
differs to a large extent in both
organizations which is provided. Having
a proper idea regarding tools and
techniques will help in essential
management of different kinds of
projects. It is will ultimately help in
developing a successful kind of career in
the coming future.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Topic and
reading
samples.
Your personal
learning
outcomes
from this
unit.
Learnings from your
experience.
Supporting
documentation
including your
prior learnings.
Text books
and
tutorials
Various kinds of structure of
organization is mainly inclusive of
division, function, process and matrix
based organization structure. Various
personnel who are working in project
should attend seminar at least once in
three months so that they can easily get
better understating of the project.
Definitely the frequency totally depends
on the selected organization of a
project.
Every department a head to whom it is
expected to report at regular interval.
Kerzner, H., & Kerzner,
H. R. (2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
5.3 Portfolio 6
Weekly Portfolio Learning Table: Week 6
Topic and reading
samples.
Your personal learning
outcomes from thisunit.
Learnings from your
experience.
Supporting
documentation
including your prior
learnings.
Project
management
methodologies
Lecture slides of week 6.
Project manager should
analyse the various business
strategy which will
ultimately improve the
activity of an organization.
OPM framework is
considered to be much
useful. I have learnt the fact
that various organization
with help of OPM framework
has easily analyse the current
state and various kinds of
improvements which is
encountered in the near
future.
It is the duty of project
manager to check the
requirements of an
organization followed by an
analysis in the near future.
Future of any project mainly
depends on strategy which is
undertaken by an
organization. Team of
management is mainly
associated with improvisation
of various business process.
Prince model is mainly
associated with associated
risk, plans and progress. The
project progress is mainly
inclusive with direction of a
project. After that initiation of
a project is taken into
Document Page
Topic and reading
samples.
Your personal learning
outcomes from thisunit.
Learnings from your
experience.
Supporting
documentation
including your prior
learnings.
account. It is the duty of
project manager to proper
manage state boundary along
with managing delivery of a
project. In the end the closing
phase of the project is taken
into account. It is the duty of
project board to ensure proper
kind of decision, effective
communication and after that
they should promote the idea
of cross-function integration.
In the end I have concluded
the fact that project manager
should give a proper list of
large number of projects and
various kinds of goals which
project is much focused to
addresses.
Kerzner Chapter
1.8-1.10, & 10 &
11.25;
It is totally the responsibility
of project manager which is
mainly set as per the goals of
an organization in a way that
it can easily bring a large
amount of benefit to an
organization. Project manager
not only associated with
managing of a project along
with this they are managing a
project along with it is there
duty to ensure the fact the
project comes up with
maximum profit in the end.
Kerzner, H., &
Kerzner, H. R.
(2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Egelstaff (2013)
Academic
assignments:
Critical thinking
and writing
critically
Tutorials along with Kerzner Age should not be considered
as a barrier for the time
interval for an executive to
easily have project and it is
mainly associated with
experience of a project on the
way how a project can be
Document Page
Topic and reading
samples.
Your personal learning
outcomes from thisunit.
Learnings from your
experience.
Supporting
documentation
including your prior
learnings.
easily managed easily.
Journals &
Standards
Various responsibilities of
project manager in the lecture
of week 6
In some case it is encountered
that project manager is
inefficient in the proper
functional line of project. It is
duty of project manager to
easily fulfil the various
objectives of a project in the
stage of planning.
Inefficiencies of the
functional line should be
checked so that various delays
in project is reduced. Various
executive management are
involved in a project if and
only if the project is on high
priority.
Tutorials
IJPM
PMJ This particular week learning
mainly includes various
process of project
management and slides of
lecture
Support of top management is
considered to be very
essential for every project
manager for properly
managing of objectives of
project. If needed project
managers should be limited
from publishing prerequisites
which is generally placed on
the top of the management in
regards to various standard
procedures of an organization.
Generally, project manager
tend to have a better idea
about various processes of a
project.
SAI Global
Tutorials Various text books and
tutorials.
Project sponsor generally
does not have idea regarding
the fact that various house
representative should be
removed from an
Kerzner, H., &
Kerzner, H. R.
(2017). Project
management: a
systems approach to

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Topic and reading
samples.
Your personal learning
outcomes from thisunit.
Learnings from your
experience.
Supporting
documentation
including your prior
learnings.
organization. But in some
cases it seen that project
sponsor removes house
representative because of his
poor performance in the
organization in comparison to
various project related works.
In some cases it is seen that
project manager begins to
focus much on
planning, scheduling,
and controlling. John
Wiley & Sons.
Lecture slides Lecture slides and tutorials of
week 6
From the week lecture and
various learning tutorials I
have learned the fact project
manager mainly bears the full
responsibility for successful
delivery of the projects.
5.4 Portfolio 7
Weekly Portfolio Learning Table: week 7
Topic and
reading samples.
Your personal
learning
outcomes from
this unit.
Learnings from your experience. Supporting
documentation
including your prior
learnings.
Project Planning
and Scheduling
Methodology can
easily bring
structure to an
organization. I
have recognized
the fact that
various project
methodologies can
be considered to
It is the duty of management staff to take
into account the various objectives of a
business. They just need to implement
Prince2 model as per the objective of
various business. The project manager of
an organization mainly describes process
of project along with various document
format. Governance mainly enables
continuous managing of various projects
Kerzner, H., &
Kerzner, H. R.
(2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Document Page
Topic and
reading samples.
Your personal
learning
outcomes from
this unit.
Learnings from your experience. Supporting
documentation
including your prior
learnings.
be important for
attaining success
of a project.
Prince2 will
ultimately help the
organization to
have various
objectives in an
effective way.
and also focus on various kinds of
decision making. Project manager needs
to review various portfolio forts. It also
need to check the necessary skills which
is needed for a project. They are mainly
associated with various kinds of gaps
which are involved in a project. Various
Gaps mainly helps in analysing the fact
that where improvements are needed. PM
can easily adopt various kinds of
strategies like prince2 for easily carrying
into various project methodologies. It is
the duty of project manager to review the
impact of prince2 model on various
enterprise and project. They can even
check the performance of business
depending on various goals. Smart goals
mainly consist of a series of steps like
specific, attainable and lastly time
focused. By this method project manager
can easily check the various kinds of risk
which are associated with project. And
depending on various kinds of risk
possible solution can be easily provided.
In the end it can be easily concluded that
this week learning helped in having an
idea regarding understanding the various
kinds of problems which can easily arise
from development phase of the project.
Scheduling of project is considered to be
an important aspect in its execution.
Planning step mainly checks total kind of
problem which mainly schedules like
study of feasibility and gathering of
various requirements. Various steps are
mainly associated with project scheduling
like evaluation of goals of various
projects, activities of project and
sequencing of activities in a proper way.
Kerzner Chapter
11.9-11.14,
11.22-11.29
Tutorials and
books
From my experience, the whole method
of project planning is generally
incorporated and helps in details
Kerzner, H., &
Kerzner, H. R.
(2017). Project
Document Page
Topic and
reading samples.
Your personal
learning
outcomes from
this unit.
Learnings from your experience. Supporting
documentation
including your prior
learnings.
understanding of various project
objectives and setting up of proper kinds
of goals.
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
PMI
Implementing
Organizational
PM Chapter 5
Project manager mainly checks the
complex nature of a project by analysing
various requirements of a project.
Breakdown of various project work
mainly helps in allocation of resources
much easier. For proper development of
WBS the functional manager should
identify the various requirements of a
project.
Journals &
Standards
Chapters from
Kerzner as
provided
I have not encountered any kind of
situation in which functional manager is
more focused in proper planning of
project.
Various kinds of conflict are mainly
associated when taking the priority of
various task, procedure of administration
and lastly technical option of any project.
IJPM
PMJ Gathered
experiences which
are involved in
managing of
various projects
Generally, a customer and contractor
have a clear idea regarding the various
kinds of understanding regarding
statement of work and various program
plan which is related to progress of
project.
SAI
Global
In a project, for ensuring the fact that
project stakeholders should have proper
idea regarding progress of project. I have
developed a project communication plan
which is mainly followed by project team
Kerzner, H., &
Kerzner, H. R.
(2017). Project
management: a
systems approach to

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Topic and
reading samples.
Your personal
learning
outcomes from
this unit.
Learnings from your experience. Supporting
documentation
including your prior
learnings.
members in establishing the progress of
report.
There is mainly some defined
communication which is followed by
each kind of team members for ensuring
the progress of report. After that it is
important information is mainly
communicated to large number of team
members. Beside mobile phones, email
social media also plays a key role in
establishing communication with
important project information to various
team members. Social media also help the
various project stakeholders in having
proper updates regarding the update of
various information.
On the contrary, meetings of regular
interval are considered to important part
of the project. This is mainly considered
as meetings on regular interval are
associated with a project. It is not always
possible for ringing on regular interval
when a team is considered to be huge in
number. Call on conference is considered
to be good initiative when team members
wants to establish a proper
communication with one or more person
at same time.
planning, scheduling,
and controlling. John
Wiley & Sons.
Development or upgradation of WBS of a
project mainly includes identification of
various requirements of a project. The
project requirements are generally
scheduled and planned as per allocated
time which is needed for completing of a
project. A good understating of the needs
of a project is considered to be essential
Document Page
Topic and
reading samples.
Your personal
learning
outcomes from
this unit.
Learnings from your experience. Supporting
documentation
including your prior
learnings.
for development of WBS. The choice of
kind of WBS mainly depends on very
long projects and various kinds of time
phase which is used in the project.
5.5 Portfolio 8
Weekly Portfolio Learning Table: Week 8
Topic and reading
samples.
Your personal
learning outcomes
from thisunit.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
Project
Management
From this particular
unit I have learned
about various project
managers and
stakeholders of a
project which tend to
work in collaborative
way. It is much
focused to provide
project methodology
for providing the best
kind of outcome.
Generally, a project manager is
mainly associated with preparing of a
project plan. Various kinds of
stakeholders are mainly assigned to a
project which mainly works as per
plan of project. Project stakeholders
should take the responsibility of
project plan. A project plan mainly
consists of large number of steps.
Work plan mainly provides the
budget which is required for
completing the project. The
stakeholders of any project should
follow the dictionary of WBS. The
software project should be carried as
per the SDLC life cycle phases. It is
the duty of stakeholders of projects to
follow various steps and complete the
project in given interval of time.
Specification is mainly associated
with various requirements of a
project. Various kinds of steps are
mainly involved in development or
upgradation of various components of
a project. It mainly checks the fact
Document Page
Topic and reading
samples.
Your personal
learning outcomes
from thisunit.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
that the given activity can be easily
completed in schedule which is
provided.
Kerzner Chapter
11.9-11.14, 11.22-
11.29;
Text book Various kinds of problems are mainly
discussed with decomposition of
WBS which is inclusive of creep and
various kinds of changes in the
domain of project along with various
kinds of issues which is used for
controlling with the various changes
which are associated with a project.
Kerzner, H., &
Kerzner, H. R.
(2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Egelstaff (2013)
Academic
assignments:
Critical thinking
and writing
critically
Various tutorials and
text books
Various kinds of top level executives
of a project is mainly associated for
analysing and tracking of various
kinds of project which are in
progress. Use of proper project
management tools helps in
monitoring of project in much
efficient way.
Journals &
Standards
Lecture slides from
week 8
This is a particular situation in which
someone else has come up with a
situation during the first task involved
a situation which has a dispute which
has mainly occur as a result of dispute
with various team members. No kind
of politics is generally involved with
various situation along with various
difference in the opinion of various
kinds of team members.
Tutorials
IJPM
PMJ Project plan generally provides an
overview or idea regarding various
kinds of activities and task which are
involved in a project from expected
bodies. Various kinds of plans are
needed by project manager for

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Topic and reading
samples.
Your personal
learning outcomes
from thisunit.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
developing of activities related to
project plan and plan for
communication.
SAI Global
PMI Managing
Change Chapter 5;
Tutorials . Project charter mainly provides a
proper kind of idea regarding various
kinds of roles and responsibilities
which are involved in a project team
member. It is also associated with
analysing various kinds of
stakeholders and authority of various
project managers
Project charter is mainly prepared in
the beginning phase of the project.
Kerzner, H., &
Kerzner, H. R.
(2017). Project
management: a
systems approach to
planning, scheduling,
and controlling. John
Wiley & Sons.
Kerzner chapters If somehow I have a plan, then I keep
it personnel by tracking of progress of
work and much focused to complete
the given work in the provided
schedule. Statement of work can be
easily defined as a work which is
needed for completing the project for
achieving success.
Configuration management can be
defined as a process which mainly
aims in maintenance of consistency of
performance of project.
Document Page
Topic and reading
samples.
Your personal
learning outcomes
from thisunit.
Learnings from your experience. Supporting
documentation
including your
prior learnings.
Various project management
methodology can be used for
developing or enhancing the method
of implementation and handling or
handling of any project.
Document Page
References
Binder, J., 2016. Global project management: communication, collaboration and
management across borders. Routledge.
Conforto, E.C., Salum, F., Amaral, D.C., da Silva, S.L. and de Almeida, L.F.M., 2014. Can
agile project management be adopted by industries other than software development?. Project
Management Journal, 45(3), pp.21-34.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Harrison, F., & Lock, D. (2017). Advanced project management: a structured approach.
Routledge.
Heagney, J. (2016). Fundamentals of project management. AMACOM Div American Mgmt
Assn.
Hornstein, H.A., 2015. The integration of project management and organizational change
management is now a necessity. International Journal of Project Management, 33(2),
pp.291-298.
JOSEPH. PHILLIPS, P.M.P., CBAP, I. and PMP, C., 2018. PMP PROJECT
MANAGEMENT PROFESSIONAL STUDY GUIDE. McGraw-Hill Education.
Joslin, R. and Müller, R., 2015. Relationships between a project management methodology
and project success in different project governance contexts. International Journal of Project
Management, 33(6), pp.1377-1392.
Kerzner, H., & Kerzner, H. R. (2017). Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Larson, E. W., & Gray, C. (2013). Project management: The managerial process with MS
project. McGraw-Hill.
Lee, S. K., & Yu, J. H. (2012). Success model of project management information system in
construction. Automation in construction, 25, 82-93.
Lock, D. (2017). The essentials of project management. Routledge.
Martinelli, R. J., & Milosevic, D. Z. (2016). Project management toolbox: tools and
techniques for the practicing project manager. John Wiley & Sons.
Mir, F. A., & Pinnington, A. H. (2014). Exploring the value of project management: linking
project management performance and project success. International journal of project
management, 32(2), 202-217.
Nixon, P., Harrington, M., & Parker, D. (2012). Leadership performance is significant to
project success or failure: a critical analysis. International Journal of productivity and
performance management, 61(2), 204-216.
Osei-Kyei, R., & Chan, A. P. (2015). Review of studies on the Critical Success Factors for
Public–Private Partnership (PPP) projects from 1990 to 2013. International Journal of
Project Management, 33(6), 1335-1346.
Petrović, D.Č., Mihić, M.M., Obradović, V.L. and Bushuyev, S.D., 2017. Project success
analysis framework: A knowledge-based approach in project management. International
Journal of Project Management, 33(4), pp.772-783.
Schwalbe, K. (2015). Information technology project management. Cengage Learning.
Shaul, L., & Tauber, D. (2013). Critical success factors in enterprise resource planning
systems: Review of the last decade. ACM Computing Surveys (CSUR), 45(4), 55.
Document Page
Todorović, M. L., Petrović, D. Č., Mihić, M. M., Obradović, V. L., & Bushuyev, S. D.
(2015). Project success analysis framework: A knowledge-based approach in project
management. International Journal of Project Management, 33(4), 772-783.
Turner, R., 2016. Gower handbook of project management. Routledge.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
Walker, A. (2015). Project management in construction. John Wiley & Sons.
Zou, W., Kumaraswamy, M., Chung, J., & Wong, J. (2014). Identifying the critical success
factors for relationship management in PPP projects. International Journal of Project
Management, 32(2), 265-274.
5.6 Portfolio 9
1. Week Portfolio Learning Table
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
i) Kerzner Chapter 21.5-
21.8, & 22;
To ensure
have right
number of
resources of
the project
Resources are required to
carry out the task of the
project. It is required of
people, equipments, and
facilities as well as
funding of the project
work. The key resources
into the project work are
project manager, creation
of resource plan to track
the project related
efforts, along with track
of the project costs. The
Lecture slide
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
resource manager can
modify as well as approve
of resource plan which is
created into the planning
stage.
Achievement of a task
depends on number of
elements, for example,
guaranteeing that ideal
individuals and their
abilities are required for
project achievement.
Right number of
individuals are chosen for
the project by following
criteria, for example,
Identifying the
rundown of delicate and
hard abilities required for
the task
Identifying the
base level of competency
required for every
aptitude
Rating of
undertaking colleagues in
light of aptitude
The team competency
assessment is
straightforward with
identification of the soft
as well as hard skills
required to plan the
project.
ii) Readings
Arumugam, V., Antony, J. and
Kumar, M., 2013. Linking
learning and knowledge
creation to project success in
To ensure of
the project
team have
correct skills
as well as
Skills required into the
undertaking assets are
that they ought to be
magnificent
communicator,

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
Six Sigma projects: An
empirical
investigation. International
Journal of Production
Economics, 141(1), pp.388-
402.
knowledge to
the job
information on the
standards of project
administration, more
grounded capacity to
peruse individuals,
exceptionally sorted out
and precise estimation of
time to finish the task.
The achievement of any
task is reliant on various
variables, yet
guaranteeing to have the
perfect individuals and
abilities is basic. At the
point when a group is
assembled sans
preparation,
guaranteeing that the
group has the suitable
aptitudes is second
nature, regardless of
whether it isn't broke
down formally. Anyway
numerous activities and
innovation groups exist
as a perpetual gathering
inside an association. As
activities emerge they are
doled out to existing
groups to be finished. In
this occasion, it is more
typical that groups will do
not have the essential
aptitudes for progress.
The project partners
should can stand and face
the disputes in addition
to inconveniences into
the affiliation. Allocation
of resources is required
into the project plan to
develop of the resources
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
at the project work. Each
of the people is assigned
with the project activities
and suppliers and
materials are worked on
the project to get
success.
Doppelt, B., 2017. Leading
change toward sustainability: A
change-management guide for
business, government and civil
society. Routledge.
To manage of
the project
scope and
ensure of
scope creep
Scope creep is such a
procedure in which the
task develops past the
foreseen measure.
From the side of project
manager, scope creep is a
bane. It gives an effect on
venture cost and course
of events alongside
quality. Into any
advancement venture,
scope crawl drives cause
for disappointments into
the undertaking. The task
supervisor handles the
undertaking extension
and keeps from turning
crazy.
Scope creep is eluded to
uncontrolled changes
that reason venture
extension to develop.
The project
administration causes the
association to oversee of
changes and take of
starts to convey an
effective undertaking
comes about. There are a
few stages used to deal
with the change
procedure, for example,
Project plan
document
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
Define the
change goals
Development of
progress administration
technique
Create of
undertaking
administration to
influence changes
Install of control
process for checking of
undertaking progress
Manage of
undertaking by execution
of progress
administration design
There are some of the
reasons due to which the
scope creep can caused
such as:
Project is being
vision oriented
but it is lack of
defined as well
as measurable
tasks and project
deliverables
The project does
not have a
proper business
cases
There is lack of
executive
support from
the top
management
level

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
There are lack of
experiences of
the project
manager deals
with the project
size and project
complexity
There are longer
time required to
actual work and
complex defined
project work
Issues are not
being resolved
and it is required
of changes to
close all of them
Investigation of time as
well as effort into the
detailed project is
required to begin the
project work before
begin of the cost as well
as schedule. The scope of
project is included of
efforts, which ensures
that there are no such
gaps into the project
work statement. It leads
to change into scope into
the execution phase.
Madhuri, K.L., Suma, V. and
Mokashi, U.M., 2018. A triangular
perception of scope creep
influencing the project
success. International Journal of
Business Information
Systems, 27(1), pp.69-85.
To describe of
the personal
life
experienced
for need of
changes and
handle the
changes
While leading work in this
course, I have absence of
project administration
aptitudes to work into
this field; hence I have
additional task
administration classes to
roll out improvements
throughout everyday life.
Project plan
document
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
Presently, I can ready to
work in venture
administration
assignments.
A task might be
thoroughly thought out
and sufficiently financed,
the assets might be
authorities, and experts
might be profoundly
experienced, however in
the event that the
endeavours of the
considerable number of
members are not skilfully
planned and dealt with,
the undertaking may
invade the financial
backing, neglect to meet
the timetable, or miss the
mark in practical and
specialized quality. The
bigger and more
perplexing the venture,
the more basic this
general administration
work moves toward
becoming.
In the development
business it is
unimaginable to lead a
development project
without an undertaking
administrator. A few
organizations, be that as
it may, at present
observe a project
administrator as
overhead instead of
fundamental to progress.
Amid monetary
downturns numerous
project administrators
are laid off because of
Document Page
Topic and reading samples Your
personal
learning
outcomes
from this
course
Learning from
your experience
Supporting
documentation
including your
prior learning
cancelation of activities.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Bibliography
Arumugam, V., Antony, J. and Kumar, M., 2013. Linking learning and knowledge creation to project
success in Six Sigma projects: An empirical investigation. International Journal of Production
Economics, 141(1), pp.388-402.
Doppelt, B., 2017. Leading change toward sustainability: A change-management guide for business,
government and civil society. Routledge.
Harold Kerzner, P., 2013. Project Management, A Systems Approach to Planning, Scheduling and
Controlling. Eleventh ed. New Jersey: John Wiley & Sons Madhuri, K.L., Suma, V. and Mokashi, U.M.,
2018. A triangular perception of scope creep influencing the project success. International Journal of
Business Information Systems, 27(1), pp.69-85.
5.7 Portfolio 10
6 Week Portfolio Learning Table
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
i) Lecture slides To
develop
of project
specificati
ons
Throughout the
weekly course, I
learned that the
project
development
specifications
provide roadmap to
correct of specified
protocols based on
current practices
along with industry
resources. It
provides with clear
direction towards
the entire team
with the project
Lecture slide
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
requirements tools
along with quality
management. Great
project
specifications lead
to successful project
work and follow of
consistent
processes.
ii) Recommended reading
Kerzner Chapter 11.9-11.14, 11.22-11.29;
To
develop
steps in
work
breakdow
n
structure
and list of
problems
in
decompos
ition of
WBS
The steps which are
required to develop
the work
breakdown
structure are as
follows:
1. Begin with
the higher
level tasks
and project
deliverable
s
2. Identificati
on of the
project
subtasks
3. Description
of each of
the tasks
The problems into
WBS are created
due to poor project
planning, overrun of
cost, and inefficient
work along with
lower quality
results. WBS is
considered as
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
effective way to
map the project,
make easier to track
the progress and
stays on the project
schedule.
Kerzner Chapter 11.9-11.14, 11.22-11.29; To
determine
role of
senior
manager
and top
level
manager
The senior manager
has responsibility as
well as authority
which are
broadened into the
project scope than
the front line
manager. The
responsibilities of
senior manager and
top level manager
are:
Providing
the project
guidance
to direct
the
reports,
which is
comprised
with the
first line
managers
as well as
project
supervisors
Ensure of
the project
priorities
as well as
project
Project plan
document

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
goals for
the
functional
area
Approval
of the
requests
for the
project
investment
for the
business
functions
Approval
of the
requests
for the
investment
to the level
of
authority
Manageme
nt of the
financial
budgets for
the
business
functions
Approval
of hiring as
well as
firing of
requests
from the
project
groups
Developme
nt of
processes
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
for the
project
groups and
functions
Working
across the
business
functions
with the
project
peers
Interaction
with the
senior
manageme
nt level for
project
reporting
Communic
ating the
financial
goals of
the project
and key
performan
ce
indicators
for
directing of
project
reports
Kerzner Chapter 11.9-11.14, 11.22-11.29; Role of
executive
during
planning
The executive
manager is
responsible to meet
with entire project
strategy as well as
business goals of
organization. The
manager receives
Project plan
document
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
required project
results. The
executive is
responsible to run
the organization
and exact nature of
the role based on
the organization.
They create of
project plans to
help the business
organization into
profitability. They
are responsible to
direct the manager
into short as well as
long term project
and develop of
strategic program
to make the
business
profitability. They
have goal to
monitor the project
program and its
performance.
iii) Recommended readings
PMI Implementing Organizational PM Chapter 5;
Available at:
http://marketplace.pmi.org/Pages/ProductDetail.as
px?GMProduct=00101 500501
To
describe
the
project
plan and
different
types of
plan the
project
manager
requires
to
In my point of view
and as per PMBOK,
the project plan is
approved
documents which
are used as guide
into the project
execution as well as
project control. The
primary usage of
the project plan is
to document of
Project plan
document

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
develop planning
assumptions,
facilitate of the
communication
among the
stakeholders along
with document of
the approved scope,
cost along with the
schedule baselines.
There are different
types of project
plan such as:
Project
scope
manageme
nt plan
Project
time
manageme
nt plan
Cost
manageme
nt plan
Stakeholde
r
manageme
nt plan
Communic
ation plan
Quality
manageme
nt plan
PMI Implementing Organizational PM Chapter 5;
Available at:
http://marketplace.pmi.org/Pages/ProductDetail.as
To
develop
of project
The project charter
is a process to
develop the
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
px?GMProduct=00101 500501 charter document which is
authorized
existence of the
project. It is
provided to the
project manager
with authority to
apply the resources
to the project
activities. The
benefit of project
charter is well
starting and project
boundaries,
creation of the
formal project
record with
approval of the
project documents.
PMI Managing Change Chapter 5; Available at:
http://marketplace.pmi.org/Pages/ProductDetail.as
px?GMProduct=00101 469401
To define
SOW
The full form of
SOW is statement
of work. It provides
with detailed
description of the
services and tasks
that a contractor is
needed to perform
of the project
contract. SOW into
the contract is
indirectly as well as
directly as the
attachment. At the
end of working day,
the employees
should clear their
area of work, check
for the safety
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
measures as well as
turn into the
statement of work.
The stamen of work
provides clear
written statement
of the project work
so that people can
know to expect
from the project
supervisor.
PMI Managing Change Chapter 5; Available at:
http://marketplace.pmi.org/Pages/ProductDetail.as
px?GMProduct=00101 469401
To
determine
configura
tion
managem
ent
Configuration
management is the
governance as well
as process of
system engineering
to ensure for the
consistency among
the logical assets
into the operational
environments. The
process of
configuration
management seeks
for identification as
well as track of the
individual
configuration items,
documentation of
the functional
capabilities. The
software developer
is used of the tools
of configuration
management for
verification of
effects of changes
into the
Project plan
document

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
configuration items
has on the other
systems.
PMI Managing Change Chapter 5; Available at:
http://marketplace.pmi.org/Pages/ProductDetail.as
px?GMProduct=00101 469401
To
describe
of project
managem
ent
methodol
ogy
enhances
of project
planning
The IT project is
hard for
management. The
project
management
methodology
enhances the
project success into
the IT division. The
methodology is
enhanced the
success of project if
it is being
maintained as well
as used properly
over the
organization. It
enhances the
project quality and
the study is focused
on two of the
project phases such
as: implementation
of the project
management and
PMM based on
PMBOK. The
purpose of this
project study is
investigation of how
to implement of
PMMM to enhance
the project success
into the IT projects.
Therefore, the
Project plan
document
Document Page
Topic and reading samples Your
persona
l
learning
outcom
es from
this
course
Learning from
your experience
Supportin
g
document
ation
including
your prior
learning
project
management
methodologies are
effective in practice
by contribution for
enhancement of the
quality as well as
success of the
project work.
Document Page
Bibliography
Harold Kerzner, P., 2013. Project Management, A Systems Approach to Planning, Scheduling and
Controlling. Eleventh ed. New Jersey: John Wiley & Sons
PMI Implementing Organizational PM Chapter 5; Available at:
http://marketplace.pmi.org/Pages/ProductDetail.aspx?GMProduct=00101 500501.
PMI Managing Change Chapter 5; Available at:
http://marketplace.pmi.org/Pages/ProductDetail.aspx?GMProduct=00101 469401.
1 out of 46
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]