LUBS 5XXXM: Project Management Methodologies Delivering Benefits
VerifiedAdded on 2023/06/10
|17
|3991
|379
Essay
AI Summary
This essay critically assesses the role of project management methodologies in delivering benefits to organizations. It begins by defining project management methodology as a combination of practices, logical methods, and processes that determine the effectiveness of project planning, development, and implementation. The essay highlights the need for project management methodologies, including establishing a common language, explaining stakeholder needs, estimating costs, executing tasks using public methodologies, identifying and resolving struggles early, and properly delivering expected outputs. It discusses the project management framework, focusing on planning, executing, and delivering projects, and differentiating between traditional and modern approaches. Specific methodologies such as PMBOK Guide, PRINCE2, and CPM are examined, outlining their advantages for organizations, such as easy breakdown of project stages, professional development units, tested methodologies, standardization of processes, wide recognition, common vocabulary, and uncertainty management. The essay concludes by emphasizing the importance of selecting the appropriate methodology based on organizational needs and desired competitive advantages.

Running head: MANAGEMENT OF PROJECT
MANAGEMENT OF PROJECT
Name of the Student
Name of the University
Author Note
MANAGEMENT OF PROJECT
Name of the Student
Name of the University
Author Note
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

2MANAGEMENT OF PROJECT
Table of Contents
Introduction................................................................................................................................3
Definition...................................................................................................................................3
The need of project management methodology.........................................................................3
Methodology in project management Framework.....................................................................3
Types of methodology................................................................................................................4
Traditional approach..............................................................................................................5
Modern approach...................................................................................................................5
Methodologies............................................................................................................................5
PMBOK Guide.......................................................................................................................5
Prince 2...................................................................................................................................6
CPM.......................................................................................................................................6
Lean........................................................................................................................................7
CCPM.....................................................................................................................................7
Conclusion..................................................................................................................................9
References................................................................................................................................10
Table of Contents
Introduction................................................................................................................................3
Definition...................................................................................................................................3
The need of project management methodology.........................................................................3
Methodology in project management Framework.....................................................................3
Types of methodology................................................................................................................4
Traditional approach..............................................................................................................5
Modern approach...................................................................................................................5
Methodologies............................................................................................................................5
PMBOK Guide.......................................................................................................................5
Prince 2...................................................................................................................................6
CPM.......................................................................................................................................6
Lean........................................................................................................................................7
CCPM.....................................................................................................................................7
Conclusion..................................................................................................................................9
References................................................................................................................................10

3MANAGEMENT OF PROJECT
Introduction
The methodology which is related to project management in the early 1960’s when
most of the organisation began to take into consideration an effective manner that would be
simplifying the realization of the benefit of the business and directly organize the task or the
work in a unique and structured entity (Binder 2016). Collaboration and communication can
be considered as a key criteria for the purpose of creating work relationship between
departments and the teams within one and similar organisation. In recent times the term has
mostly changed and modified many times, in this sector new definition have been created and
new functions and elements have been changed. The project management methodology can
be considered as a broad principle and the rules which can deal with particular project which
has a particular end and a beginning. There are different types and approach of project
management methodology which has to be implemented according to the requirement of the
organisation or the project they are dealing with and the complexity of the project
(Bongiovanni et al. 2015).
The purpose of the report is to take into consideration project management
methodologies in the sector of delivering benefit to the organisation from the projects
process. The different project management methodology which can be implemented into the
working of the project are mainly taken into consideration with stating the main advantage
which are associated with the implementation. On the other hand the main competitive
advantage which the organisation can obtain from the concept which discussed in the report.
Definition
Project Management methodology can be considered strictly a combination of
practices, logical method and processes which determine affectivity would be the plan,
development of the project taking into consideration the implementation phase which is
Introduction
The methodology which is related to project management in the early 1960’s when
most of the organisation began to take into consideration an effective manner that would be
simplifying the realization of the benefit of the business and directly organize the task or the
work in a unique and structured entity (Binder 2016). Collaboration and communication can
be considered as a key criteria for the purpose of creating work relationship between
departments and the teams within one and similar organisation. In recent times the term has
mostly changed and modified many times, in this sector new definition have been created and
new functions and elements have been changed. The project management methodology can
be considered as a broad principle and the rules which can deal with particular project which
has a particular end and a beginning. There are different types and approach of project
management methodology which has to be implemented according to the requirement of the
organisation or the project they are dealing with and the complexity of the project
(Bongiovanni et al. 2015).
The purpose of the report is to take into consideration project management
methodologies in the sector of delivering benefit to the organisation from the projects
process. The different project management methodology which can be implemented into the
working of the project are mainly taken into consideration with stating the main advantage
which are associated with the implementation. On the other hand the main competitive
advantage which the organisation can obtain from the concept which discussed in the report.
Definition
Project Management methodology can be considered strictly a combination of
practices, logical method and processes which determine affectivity would be the plan,
development of the project taking into consideration the implementation phase which is
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

4MANAGEMENT OF PROJECT
continuous (Heldman 2018). The process continuous until the complete completion and
termination. It is very much proven scientifically as a means of disciplined and systematic
approach to the design of the project, completion and execution.
The need of project management methodology
The main need which are associated with the project management methodology are
stated below:
Establishment of common language which is understood by the team, so it gives a clear
idea what the expectation is from the team.
The need of the stakeholders are broadly explained.
The estimation of the cost are credible, accurate and complete.
Each of the task are executed using the public methodology method.
Maximum of the struggles are identified and resolved in an early stage.
The deliverables which are expected are produced and handed over properly.
Instructions which are learned and the solutions are very much applied quickly (Hornstein
2015).
Methodology in project management Framework
Project management which can be stated in the form of acronym “PM” can be stated
as a framework of planning, executing and delivering the basics of the project of any size,
kind, type and nature (Joslin and Müller 2015). The framework which is related to the PM
focus on the aspect of realization of the changes which are desired in accordance to the
approach of the methodology. The main important point which can be stated here is that it
directly manages the change in the core aspect which should be managed. The framework of
the project management identifies and directly defines how to manage the aspect in a proper
manner. The concept of the practice helps as a best way to systematically realize the change
continuous (Heldman 2018). The process continuous until the complete completion and
termination. It is very much proven scientifically as a means of disciplined and systematic
approach to the design of the project, completion and execution.
The need of project management methodology
The main need which are associated with the project management methodology are
stated below:
Establishment of common language which is understood by the team, so it gives a clear
idea what the expectation is from the team.
The need of the stakeholders are broadly explained.
The estimation of the cost are credible, accurate and complete.
Each of the task are executed using the public methodology method.
Maximum of the struggles are identified and resolved in an early stage.
The deliverables which are expected are produced and handed over properly.
Instructions which are learned and the solutions are very much applied quickly (Hornstein
2015).
Methodology in project management Framework
Project management which can be stated in the form of acronym “PM” can be stated
as a framework of planning, executing and delivering the basics of the project of any size,
kind, type and nature (Joslin and Müller 2015). The framework which is related to the PM
focus on the aspect of realization of the changes which are desired in accordance to the
approach of the methodology. The main important point which can be stated here is that it
directly manages the change in the core aspect which should be managed. The framework of
the project management identifies and directly defines how to manage the aspect in a proper
manner. The concept of the practice helps as a best way to systematically realize the change
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

5MANAGEMENT OF PROJECT
which is implemented in term of time, quality and cost (Kerzner 2017). The concept of
managing the project directly means to perform and describe the activity which is objective
related to making of change. For example it can be stated that writing a book is kind of the
project and the objective which is related to the aspect is scripting of a book. In order to
proceed with the activity there can be a sequence of activity which can be implemented
which may include selection of the topic, material collection regarding the topic, draft
creation, typing the content and proofreading the content (Kerzner and Kerzner 2017). So
taking into consideration the prospective of project management the author’s main role is to
access and publish all the necessary jobs and complete them which would directly result in
the successful completion of the project.
The framework of project management can be considered as a collection which is
structured relating to relevant knowledge on how to implement different methodology. The
main factor which is taken into consideration is overview of the different and various
methods, processes, rules and standard (Kerzner 2018). On the other hand it does not take
into consideration exact algorithm into how to manage a specific project. In this context it can
be stated that the methodology of project management can be explained as a level of PM
framework.
Figure 1: (PROJECT MANAGEMENT FRAMEWORK)
(SOURCE: Marchewka 2014)
which is implemented in term of time, quality and cost (Kerzner 2017). The concept of
managing the project directly means to perform and describe the activity which is objective
related to making of change. For example it can be stated that writing a book is kind of the
project and the objective which is related to the aspect is scripting of a book. In order to
proceed with the activity there can be a sequence of activity which can be implemented
which may include selection of the topic, material collection regarding the topic, draft
creation, typing the content and proofreading the content (Kerzner and Kerzner 2017). So
taking into consideration the prospective of project management the author’s main role is to
access and publish all the necessary jobs and complete them which would directly result in
the successful completion of the project.
The framework of project management can be considered as a collection which is
structured relating to relevant knowledge on how to implement different methodology. The
main factor which is taken into consideration is overview of the different and various
methods, processes, rules and standard (Kerzner 2018). On the other hand it does not take
into consideration exact algorithm into how to manage a specific project. In this context it can
be stated that the methodology of project management can be explained as a level of PM
framework.
Figure 1: (PROJECT MANAGEMENT FRAMEWORK)
(SOURCE: Marchewka 2014)

6MANAGEMENT OF PROJECT
The steps which are stated would be directly playing a very vital role which would be
altering the overall life phase of the project and different types of competitive advantage can
be gained from the implementation.
Types of methodology
In the approach of the project management it can be seen that most of the organisation
tend to indulge into the aspect to gain competitive advantage. It should be implemented
according to the need of the organisation and taking into consideration what type of
advantage they want to obtain from the implementation. There are basically two types of
project management methodology which are stated below:
Traditional approach
It can be stated as the process has few steps which are involved into the aspect which
are done step by step according to the requirement of the project which mainly include
design, develop and deliver the service and the product. It directly entails achieving the
succession in the implementation of the process and directly providing the benefit of the
milestone which is based on the planning and the team building (Bongiovanni et al. 2015).
The steps which are mainly included into the process are stated below:
Initiation
Planning and design
Execution (This phase may include coding part)
Integration and control
Validation (Debugging and testing)
Closure
Modern approach
The steps which are stated would be directly playing a very vital role which would be
altering the overall life phase of the project and different types of competitive advantage can
be gained from the implementation.
Types of methodology
In the approach of the project management it can be seen that most of the organisation
tend to indulge into the aspect to gain competitive advantage. It should be implemented
according to the need of the organisation and taking into consideration what type of
advantage they want to obtain from the implementation. There are basically two types of
project management methodology which are stated below:
Traditional approach
It can be stated as the process has few steps which are involved into the aspect which
are done step by step according to the requirement of the project which mainly include
design, develop and deliver the service and the product. It directly entails achieving the
succession in the implementation of the process and directly providing the benefit of the
milestone which is based on the planning and the team building (Bongiovanni et al. 2015).
The steps which are mainly included into the process are stated below:
Initiation
Planning and design
Execution (This phase may include coding part)
Integration and control
Validation (Debugging and testing)
Closure
Modern approach
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

7MANAGEMENT OF PROJECT
Modern approach does not focus on the aspect of the linear processes on the other
hand they tend to provide an alternative look into the process of project management. Some
of the methods which is related to the concept can be stated to be benefit for the software
development and IT sector while other can be directly implemented within the production,
improvement of process, production of engineering and many more. Modern approach may
use different models of the process of management.
Methodologies
PMBOK Guide
A guide to the project management body of knowledge cannot be considered as a
Project management methodology in its pure form. Most of the people considered it as a
methodology approach which is related to planning, execution, control and termination of the
various aspect of the project (Nicholas and Steyn 2017). Meanwhile the PMBOK guide is a
broad inventory which is related to the best practice and the ideas with emphasis on the
implementation and the planning of the project.
Advantage to organisation
Easy breakdown of project management stages: The implementation of the PMBOK a
project can be broken down into one or more phases. The main advantage which can be
achieved from the aspect is that is makes the working of the project more simple. It can
be stated here that some of the steps in the process can be difficult to understand but the
process of PMBOK explains how to breakdown the overall process into simple steps.
Professional development Unit: Development and reading the PMBOK directly counts
as a professional development Unit (PDUs). This directly helps the organisation to stay in
accordance with the standard of the industry.
Modern approach does not focus on the aspect of the linear processes on the other
hand they tend to provide an alternative look into the process of project management. Some
of the methods which is related to the concept can be stated to be benefit for the software
development and IT sector while other can be directly implemented within the production,
improvement of process, production of engineering and many more. Modern approach may
use different models of the process of management.
Methodologies
PMBOK Guide
A guide to the project management body of knowledge cannot be considered as a
Project management methodology in its pure form. Most of the people considered it as a
methodology approach which is related to planning, execution, control and termination of the
various aspect of the project (Nicholas and Steyn 2017). Meanwhile the PMBOK guide is a
broad inventory which is related to the best practice and the ideas with emphasis on the
implementation and the planning of the project.
Advantage to organisation
Easy breakdown of project management stages: The implementation of the PMBOK a
project can be broken down into one or more phases. The main advantage which can be
achieved from the aspect is that is makes the working of the project more simple. It can
be stated here that some of the steps in the process can be difficult to understand but the
process of PMBOK explains how to breakdown the overall process into simple steps.
Professional development Unit: Development and reading the PMBOK directly counts
as a professional development Unit (PDUs). This directly helps the organisation to stay in
accordance with the standard of the industry.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

8MANAGEMENT OF PROJECT
Tested methodologies: The PMBOK offers tested methodology which is related to the
evidence based practices which directly ensures what are the operation standard of the
organisation. On the other hand it also stated what should be the proper form of
orientation of working in the organisation. It also stated why other methodology would
not be working properly.
Provide standardization of processes: It can be stated that the process of
standardization remains one of the most important sector when relating to effective
business plans and models. In the process of project the PMBOK model provides a way
of transforming the isolated process into a complete, standard and collaborative effort of
negotiation (Martinelli and Milosevic 2016).
Prince 2
Project IN Controlled Environment 2 (Prince2) can be considered as a process which
is method driven approach and the approach which is related to documentation which allows
the access of driving different projects in the aspect of nature driven approach. The
methodology was developed by the UK government and today it can be considered as a great
example which is related to project management methodology which is implemented in the
parts of UK as well as internationally.
Advantage to organisation
Recognized Widely: Although the process of PRINCE2 can be considered as a
management process of the IT projects, but the method was eventually developed to be
accepted universally. It can be stated that due to the advantage of the implementation the
process is widely adopted by more than 4 countries.
Common vocabulary: It can be stated here that sector qualification that recognised across
countries and industries is not only the main point of emphasis. About 120 public and
Tested methodologies: The PMBOK offers tested methodology which is related to the
evidence based practices which directly ensures what are the operation standard of the
organisation. On the other hand it also stated what should be the proper form of
orientation of working in the organisation. It also stated why other methodology would
not be working properly.
Provide standardization of processes: It can be stated that the process of
standardization remains one of the most important sector when relating to effective
business plans and models. In the process of project the PMBOK model provides a way
of transforming the isolated process into a complete, standard and collaborative effort of
negotiation (Martinelli and Milosevic 2016).
Prince 2
Project IN Controlled Environment 2 (Prince2) can be considered as a process which
is method driven approach and the approach which is related to documentation which allows
the access of driving different projects in the aspect of nature driven approach. The
methodology was developed by the UK government and today it can be considered as a great
example which is related to project management methodology which is implemented in the
parts of UK as well as internationally.
Advantage to organisation
Recognized Widely: Although the process of PRINCE2 can be considered as a
management process of the IT projects, but the method was eventually developed to be
accepted universally. It can be stated that due to the advantage of the implementation the
process is widely adopted by more than 4 countries.
Common vocabulary: It can be stated here that sector qualification that recognised across
countries and industries is not only the main point of emphasis. About 120 public and

9MANAGEMENT OF PROJECT
private sector organisation make up a committee which is virtual that directly consults on
PRINCE2. The practice which is stated as “best practice” is directly agreed upon. The
most important aspect which can be stated here is that the PRINCE2 can be considered as
a project management language.
Build for uncertainty: The employee are very much familiar with the approach which is
related to the PRINCE2 due to the fact that employee are well equipped to sustain in the
tough time. The concept can be applied in the sector of recession as well as problem
which is within the organisation. The organisation can take into consideration the aspect
of the PRINCE2 as a troubleshooting approach. Within the internal working of the
organisation if there are any sort of problem the
Perfect starter: Taking into consideration the above criteria it can be stated that the
PRINCE 2 can be one of most effective way in which project can be managed within the
external as well as internal working of the organisation. It can directly help the employee
to learn different methodology of project management. The implementation of the process
can be done for any project and at any level of expertise (Mir and Pinnington 2014). The
capacity of integration into other project management methodology can also be done
quite easily which would be altering the role of scope.
CPM
The critical path method (CPM) can be stated to be exploring the most important or
critical area of the task relating to the project by means of defining the possible sequence of
the activity and directly estimating the time duration of each of the sequence. The main
concept which is related to the concept is that it gives a direct estimation of the time which
can be taken to complete each of the task and which of the task would be within the scope of
the project.
Advantage to organisation
private sector organisation make up a committee which is virtual that directly consults on
PRINCE2. The practice which is stated as “best practice” is directly agreed upon. The
most important aspect which can be stated here is that the PRINCE2 can be considered as
a project management language.
Build for uncertainty: The employee are very much familiar with the approach which is
related to the PRINCE2 due to the fact that employee are well equipped to sustain in the
tough time. The concept can be applied in the sector of recession as well as problem
which is within the organisation. The organisation can take into consideration the aspect
of the PRINCE2 as a troubleshooting approach. Within the internal working of the
organisation if there are any sort of problem the
Perfect starter: Taking into consideration the above criteria it can be stated that the
PRINCE 2 can be one of most effective way in which project can be managed within the
external as well as internal working of the organisation. It can directly help the employee
to learn different methodology of project management. The implementation of the process
can be done for any project and at any level of expertise (Mir and Pinnington 2014). The
capacity of integration into other project management methodology can also be done
quite easily which would be altering the role of scope.
CPM
The critical path method (CPM) can be stated to be exploring the most important or
critical area of the task relating to the project by means of defining the possible sequence of
the activity and directly estimating the time duration of each of the sequence. The main
concept which is related to the concept is that it gives a direct estimation of the time which
can be taken to complete each of the task and which of the task would be within the scope of
the project.
Advantage to organisation
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide

10MANAGEMENT OF PROJECT
The implementation of the CPM would be directly beneficial for the organisation in a
way which makes the control over the management easier.
The concept directly helps in the aspect of ascertaining the schedule of time relating to
the activity having a sequential information.
CPM identifies the most important and critical element in the project. Thus the
management of the organisation should be kept very much alert and prepared to pay
attention to the critical activity of the project.
The planning in the approach can be stated to be more detailed and easier in the point of
view of implementation (Martinelli and Milosevic 2016).
Lean
The lean project methodology directly intend to increase the customer resource waste and
customer value. Lean project management allows the organisation to create higher value
relating to the customers with very few resources (Mir and Pinnington 2014). These type of
approach help in the aspect of the creation of customer satisfaction and generation of value
through implementation of an optimized process of flow which removes waste in services,
products, inventory and transport.
Advantage to organisation
The lean process can directly reduce the risk management and even eradicate the waste
completely. In most of the cases it is seen that less the waste more would be the profit
which would be seen.
The lean process uses lesser material which increases the profit sector. However the main
goal in each of the sector should be to provide customer satisfaction as end result will
reduce cost.
Lean promotes employee safety and access to lesser accident for maximum productivity.
The implementation of the CPM would be directly beneficial for the organisation in a
way which makes the control over the management easier.
The concept directly helps in the aspect of ascertaining the schedule of time relating to
the activity having a sequential information.
CPM identifies the most important and critical element in the project. Thus the
management of the organisation should be kept very much alert and prepared to pay
attention to the critical activity of the project.
The planning in the approach can be stated to be more detailed and easier in the point of
view of implementation (Martinelli and Milosevic 2016).
Lean
The lean project methodology directly intend to increase the customer resource waste and
customer value. Lean project management allows the organisation to create higher value
relating to the customers with very few resources (Mir and Pinnington 2014). These type of
approach help in the aspect of the creation of customer satisfaction and generation of value
through implementation of an optimized process of flow which removes waste in services,
products, inventory and transport.
Advantage to organisation
The lean process can directly reduce the risk management and even eradicate the waste
completely. In most of the cases it is seen that less the waste more would be the profit
which would be seen.
The lean process uses lesser material which increases the profit sector. However the main
goal in each of the sector should be to provide customer satisfaction as end result will
reduce cost.
Lean promotes employee safety and access to lesser accident for maximum productivity.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser

11MANAGEMENT OF PROJECT
Lean directly ensures a smooth flow relating to the productivity of critical activity.
The implementation of the lean would increase the all-round high rates of planning.
The process directly reduces the communication gap which is between the employers and
the workers. The main aspect which is seen was result are improved.
The process can be considered as a technique of implementation of the process in a smart
manner. This would be directly reducing the overall cost (Misopoulos et al. 2018).
The concept of lean project delivery method aspect would be the satisfaction of the
customer rather than procedure while eliminating the risk which is associated with the waste
reduction (Martens and Carvalho 2016). The concept of the elimination of waste can be
considered to be very much important due to the factor that everyone would be concentrating
on the actual cost when there are several types of hidden cost which may be considered as
very much high. The project management can be stated as a solution to several information
flow problem and by completely eradicating the information flow problem will directly
improve the physical health and mental health as well of the manager as well as the
employees which in turn will improve the productivity overall (Nicholas, J.M and Steyn
2017).
CCPM
Critical chain project management (CCPM) in a way describes a way of planning,
review and implementation of various kind of work in s single-and-multiple project
environment. This management methodology directly uses the aspect of theory of constraints
(TOC) and the concept of the buffer which establishes the sector of task duration and the
management of the resource dependent activity and tasks.
Advantage to organisation
The CCPM would be directly seen in the uncertainty or the sector of unforeseen.
Lean directly ensures a smooth flow relating to the productivity of critical activity.
The implementation of the lean would increase the all-round high rates of planning.
The process directly reduces the communication gap which is between the employers and
the workers. The main aspect which is seen was result are improved.
The process can be considered as a technique of implementation of the process in a smart
manner. This would be directly reducing the overall cost (Misopoulos et al. 2018).
The concept of lean project delivery method aspect would be the satisfaction of the
customer rather than procedure while eliminating the risk which is associated with the waste
reduction (Martens and Carvalho 2016). The concept of the elimination of waste can be
considered to be very much important due to the factor that everyone would be concentrating
on the actual cost when there are several types of hidden cost which may be considered as
very much high. The project management can be stated as a solution to several information
flow problem and by completely eradicating the information flow problem will directly
improve the physical health and mental health as well of the manager as well as the
employees which in turn will improve the productivity overall (Nicholas, J.M and Steyn
2017).
CCPM
Critical chain project management (CCPM) in a way describes a way of planning,
review and implementation of various kind of work in s single-and-multiple project
environment. This management methodology directly uses the aspect of theory of constraints
(TOC) and the concept of the buffer which establishes the sector of task duration and the
management of the resource dependent activity and tasks.
Advantage to organisation
The CCPM would be directly seen in the uncertainty or the sector of unforeseen.

12MANAGEMENT OF PROJECT
The critical chain project management (CCPM) can be considered an outgrowth of the
theory of the Constraints (TOC) developed by the Eliyahu Goldratt to the managing and
scheduling of manufacturing.
The implementation of the critical chain project management can be beneficial in a way
by which projects can be completed in a time friendly manner with the introduction of
greater scheduling of reliability.
The main aspect which is taken into consideration is how the management of the risk is
initiated. This majorly means that in the process there should not be any type of risk
which is associated into the aspect. If there are any type of risk associated it would be
directly impacting the overall working of the project. The main implementation which is
done to avoid the risk factor is the implementation of padding in the task duration,
starting of the work as soon as possible, multitasking approach to work and focusing on
the aspect of the meeting of the commitment dates (Pajares et al. 2017).
It can be stated here that the critical chain project management (CCPM) directly
delivers all the above benefit but is not considered as a standard in the industry. In some of
the aspect it can be stated to qualify as a new technology introduction. To state in a concise
manner the main advantage which can be seen in the concept are stated below:
Shorten overall project duration
Significantly improve the project delivery
Provides early warning relating to the approach of the threat
Enables less drastic, earlier and more focused response to the potential problem (Špundak
2014).
The critical chain project management (CCPM) can be considered an outgrowth of the
theory of the Constraints (TOC) developed by the Eliyahu Goldratt to the managing and
scheduling of manufacturing.
The implementation of the critical chain project management can be beneficial in a way
by which projects can be completed in a time friendly manner with the introduction of
greater scheduling of reliability.
The main aspect which is taken into consideration is how the management of the risk is
initiated. This majorly means that in the process there should not be any type of risk
which is associated into the aspect. If there are any type of risk associated it would be
directly impacting the overall working of the project. The main implementation which is
done to avoid the risk factor is the implementation of padding in the task duration,
starting of the work as soon as possible, multitasking approach to work and focusing on
the aspect of the meeting of the commitment dates (Pajares et al. 2017).
It can be stated here that the critical chain project management (CCPM) directly
delivers all the above benefit but is not considered as a standard in the industry. In some of
the aspect it can be stated to qualify as a new technology introduction. To state in a concise
manner the main advantage which can be seen in the concept are stated below:
Shorten overall project duration
Significantly improve the project delivery
Provides early warning relating to the approach of the threat
Enables less drastic, earlier and more focused response to the potential problem (Špundak
2014).
⊘ This is a preview!⊘
Do you want full access?
Subscribe today to unlock all pages.

Trusted by 1+ million students worldwide
1 out of 17
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
Copyright © 2020–2026 A2Z Services. All Rights Reserved. Developed and managed by ZUCOL.