ProductsLogo
LogoStudy Documents
LogoAI Grader
LogoAI Answer
LogoAI Code Checker
LogoPlagiarism Checker
LogoAI Paraphraser
LogoAI Quiz
LogoAI Detector
PricingBlogAbout Us
logo

Project Management In Organization Report

Verified

Added on  2022/07/28

|14
|2188
|16
AI Summary

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT MANAGEMENT
Project management
Name of the Student
Name of the University
Author’s note

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
PROJECT MANAGEMENT
Table of Contents
1. Project charter..............................................................................................................................2
1.1 Project title.............................................................................................................................2
1.2 Brief background...................................................................................................................2
1.3 Objectives of the project........................................................................................................2
1.4 Brief list of constraints and boundaries.................................................................................2
1.5 Risk and opportunities...........................................................................................................3
1.6 Project leaders and team members........................................................................................5
1.7 Project milestones..................................................................................................................6
1.8 Summary of the project costs................................................................................................6
1.9 Sequence diagram..................................................................................................................6
2. Schedule management plan.........................................................................................................7
3. Cultural barriers within the organization.....................................................................................8
4. Discussion about the training need..............................................................................................9
5. Issues on the Launch day...........................................................................................................10
6. Follow up launch.......................................................................................................................10
Bibliography..................................................................................................................................11
Document Page
2
PROJECT MANAGEMENT
1. Project charter
1.1 Project title
The paper mainly reflects on the development of a CRM system for a Kit and Ace
1.2 Brief background
The paper mainly focuses on the development of a CRM system for Kit and Ace
organization which was founded in the year 2014. It is found that the company mainly sells
machine washable wool clothing as well as other accessories. As the organization wants to
expand its market by giving tough competition to its competitors therefore, they want to develop
a CRM system. It is found with the help of the CRM system; the organization can be able to
centralize as well as streamline its communication for creating stronger relationship with the
customers. In addition to this, development of CRM give better knowledge about the customers,
helps in segmentation and assist in better as well as speedier service that attracts more customers
and helps the organization in expanding its business.
1.3 Objectives of the project
The objectives include:
To develop CRM system for Kit and Ace clothing store
To expand the business of the organization by giving tough competition to its competitors
To resolve the issues that the organization mainly faces due to current system
1.4 Brief list of constraints and boundaries
Budget: The expenditure of project budget must be done in a proper way for avoiding
project budget shortfall issues and if project shortfall occurs, the progress of the project
can be obstructed.
Document Page
3
PROJECT MANAGEMENT
Time: If from the initial stage, the project manager does not take proper initiative of
tracking the schedule then slippage will occur in the schedule that further causes delay
and extension of the completion date.
Resources: If the workers who are hired for the project are not much skilled and
experienced then it will be quite difficult to undertake proper project progress and the
project will face delay as they are not much skilled in handling challenges and conflicts
associated with the project.
1.5 Risk and opportunities
The table that is given below helps in reflecting the opportunities and risks that are
associated with CRM project in Kit and Ace.
Id Risk/opportunities Description Impact Probability
1 Improper budget
estimation
(Risk)
Improper budget
estimation can
create a number
of financial
challenges.
High High
2 Delay
(Risk)
Slippage of
schedule can
cause delay in
the project and
that can further
extend the
project
High High

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
4
PROJECT MANAGEMENT
completion date.
3 Inexperienced workers
(Risk)
The workers are
not much
experienced and
therefore they are
unable to handle
issues associated
with the project
properly.
Medium Medium
4 Lack of
communication
(Risk)
Due to improper
communication
between the
project team and
the higher
authority, proper
decisions related
with the project
are not taken on
proper time that
creates a lot of
issues.
Medium Low
5 Scope creep
(Opportunity)
It is found that
changes in
Medium Medium
Document Page
5
PROJECT MANAGEMENT
schedule is done
for adding
functionalities of
call support so
that the
customers can
call if they have
any query and
thus the service
of the
organization gets
improved.
1.6 Project leaders and team members
Name Role
<Please fill your name> Project manager
William Smith Sponsor
Jacob Martin Programmer
Logan Wilson Administration officer
Felix Gagnon Tester
Nathan Roy Developer
Zack Brown Interface designer
1.7 Project milestones
Milestone Completion date
Document Page
6
PROJECT MANAGEMENT
Getting approval for the project Fri 24-04-20
Getting approval for designing phase Mon 11-05-20
Getting approval for development phase Thu 28-05-20
Completion of the entire system Fri 19-06-20
Project Closure Fri 10-07-20
1.8 Summary of the project costs
It is found that in order to develop CRM system for Kit and Ace, it is found that budget
of around $51,960 is needed. All the activities of the project are assigned with proper cost so that
the entire project gets completed on time.
1.9 Sequence diagram
Figure 1: Sequence diagram for project showing interaction with activities
(Source: Created by Author)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
7
PROJECT MANAGEMENT
2. Schedule management plan
The schedule management plan that is created helps in reflecting the project activities,
milestones as well as start and end dates in the form of Gantt chart. As per the Gantt chart which
is given, the commencement of the project is on 17th April 2020 and the completion date of the
project is 10th July 2020 that means around 61 days of time is needed for successful development
of CRM system for Kit and Ace clothing store in Canada.
Figure 2: Gantt chart
Document Page
8
PROJECT MANAGEMENT
(Source: Created by Author)
3. Cultural barriers within the organization
It is found that development of CRM system for handling the entire functions and
operations of the organization is considered as a major change and this change can be proper
adopted if the organization consists of proper working environment.
Barriers within the organization
Poor communication: If the higher management of the organization do not
communicate the significance of the system then the workers of Kit and Ace will not
support the project which will further create barrier within the project progress. It is
analyzed that arrangement of proper meeting is needed for reflecting the significance of
the project so that such types of barriers can be avoided (Atkin et al., 2017).
Seeing change as a threat: Resistance is considered as one of the greatest barriers for
making changes and this resistance is mainly due to the fear that is present in the mind of
the workers. Most of the workers feared that they are unable to manage work on the new
system or the system will threaten their productivity. Such type of resistance generally
acts as a barrier (Asmi et al., 2017).
Identification of members for combating barriers
It is found that in order to resolve the barriers that are mainly associated with the
organizational change will be solved by the higher authority of the organization as well as with
the help of the team members. If the project team is able to spread awareness by communicating
about the significance of the project then the barriers for accepting the project within the
organization can be reduced.
Document Page
9
PROJECT MANAGEMENT
4. Discussion about the training need
It is found that in order to resolve the issue that is faced due to organizational barrier, it is
needed to arrange a proper awareness meeting for the team members as well as for other
stakeholders of the project. In this meeting, the higher authority of the organization as well as the
project manager will discuss how the development of the new system will expand the business of
the organization and how it will create impact on the organizational revenue that is generated.
(Dandage et al., 2018). This is mainly done for motivating the team so that they do not create
barrier during CRM development project. In addition to thus proper facility of training will be
provided to each and every stakeholder who will operate the CRM system so that they will not
face any type of challenges while handling the functions and operations of Kit and Ace clothing
store. The various training items which are necessary in the project are listed below:
Type of training Reason
Ways for handling customers Proper training facility needs to be given to
the workers of Kit and Ace so that they know
the ways for handling customers mood.
Operation of the system Training facility is needed for reflecting the
functions of each of the parts and for showing
the operation of entire system.
Steps taken for making customers satisfied The techniques as well as strategies that are
needed for keeping the customers happy are
provided during the training period.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
10
PROJECT MANAGEMENT
5. Issues on the Launch day
On the launch day of the changes that are done in the project for avoiding barriers, it is
found that due to illness, the project manager is unable to attend the launch event. It is found that
due to absence of project manager, it will be quite difficult to launch the project successfully
(Kerzner 2017). As a contingency plan for such issue, the project planner is given the
responsibility of launching the project so that the project gets launched within the estimated time
without facing any delay. This contingency plan must be incorporated within the launch plan of
the project so that the contingency plan can be undertaken within the project for avoiding project
related issues.
6. Follow up launch
The steps that are mainly taken on order to take proper follow up on the launch plan after 3
weeks and after one year of launch.
After three weeks of launch, the project team must analyse whether the system that was
launched has been done effectively or not for avoiding project related challenges. This
follow up is needed for analyzing the issues that the organization is facing after launch
and what type of actions are mainly needed for resolving such issues (Silvius et al.,
2017).
It is found that after 1 year, the project manager must take follow up for properly
maintaining the system that was development such that the CRM system will be able to
manage the operations and functions of the organization quite successfully. This is
mainly done by the support team from time to time for avoiding operations related
challenges of the system.
Document Page
11
PROJECT MANAGEMENT
Document Page
12
PROJECT MANAGEMENT
Bibliography
Andersen, E. S. (2016). Do project managers have different perspectives on project
management?. International Journal of Project Management, 34(1), 58-65.
Asmi, A., Brus, M., Laj, P., & Kutsch, W. (2017, April). Overcoming organizational, cultural
and technological barriers in a cluster of European Research Infrastructures. In EGU
General Assembly Conference Abstracts (Vol. 19, p. 14098).
Atkin, D., Chaudhry, A., Chaudry, S., Khandelwal, A. K., & Verhoogen, E. (2017).
Organizational barriers to technology adoption: Evidence from soccer-ball producers in
Pakistan. The Quarterly Journal of Economics, 132(3), 1101-1164.
Atkin, D., Chaudhry, A., Chaudry, S., Khandelwal, A. K., & Verhoogen, E. (2017).
Organizational barriers to technology adoption: Evidence from soccer-ball producers in
Pakistan. The Quarterly Journal of Economics, 132(3), 1101-1164.
Dandage, R. V., Mantha, S. S., Rane, S. B., & Bhoola, V. (2018). Analysis of interactions among
barriers in project risk management. Journal of Industrial Engineering
International, 14(1), 153-169.
Hoda, R., & Murugesan, L. K. (2016). Multi-level agile project management challenges: A self-
organizing team perspective. Journal of Systems and Software, 117, 245-257.
Kerzner, H., 2017. Project management: a systems approach to planning, scheduling, and
controlling. John Wiley & Sons.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
13
PROJECT MANAGEMENT
Muriana, C., & Vizzini, G. (2017). Project risk management: A deterministic quantitative
technique for assessment and mitigation. International Journal of Project
Management, 35(3), 320-340.
Silvius, A. G., Kampinga, M., Paniagua, S., & Mooi, H. (2017). Considering sustainability in
project management decision making; An investigation using Q-
methodology. International Journal of Project Management, 35(6), 1133-1150.
Zwikael, O., Chih, Y. Y., & Meredith, J. R. (2018). Project benefit management: Setting
effective target benefits. International Journal of Project Management, 36(4), 650-658.
1 out of 14
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]