logo

Project Management Plan for Voice Recognition Technology Integration at Autopia Tours

   

Added on  2024-07-22

27 Pages7086 Words377 Views
 | 
 | 
 | 
Project management
Project Management Plan for Voice Recognition Technology Integration at Autopia Tours_1

TABLE OF CONTENTS
Introduction..................................................................................................................................................1
Project plan..................................................................................................................................................2
1. Necessary assumptions about the business and articulate to incorporate “Voice Recognition”
technologies.............................................................................................................................................2
2. Expanding your ICT unit to incorporate “Voice Recognition” technologies......................................3
3. Provide an initial estimated cost & resource structure with appropriate justifications........................5
4. Develop a time sheet with key project aspects such as milestones, slack etc to indicate how long
will it take to deploy “Voice Recognition” technologies........................................................................7
5. Provide a complete project plan (PERT & Gantt chart)......................................................................8
Project description.....................................................................................................................................10
1. Cost benefits analysis.........................................................................................................................10
2. Set of the recommendations for the project management..................................................................12
3. Implementation plan detailing time, cost and resource schedules.....................................................14
4. Provide a comprehensive post-implementation plan.........................................................................17
5. Recommendation...............................................................................................................................19
Conclusion.................................................................................................................................................20
References..................................................................................................................................................21
Project Management Plan for Voice Recognition Technology Integration at Autopia Tours_2

LIST OF FIGURES
Figure 1: Project management activities and processes...............................................................................3
Figure 2: Area of expertise required in project management......................................................................8
Figure 3: Cost benefit analysis...................................................................................................................13
Project Management Plan for Voice Recognition Technology Integration at Autopia Tours_3

Introduction
The report will show the current issues on the project which the organization are facing and it will also
focus on the system issues too. It will show the issues that are facing by the information system project
managers. The report will discuss on the project management planning that includes the planning,
implementing, evaluation, scheduling and feasibility of the project. Through this process it encourage
the team members to take participate in the project activities analytically and holistically. The report will
show the utilizing of the project management tools and current software which provide the most reliable
strategies to the team members in their projects. It is necessary to have the reliable information on the
project which will lead in achieving the project goals and objectives. The project management
information system is differing in the design, features and scope that are depend upon the operational
requirements of the organization.
1
Project Management Plan for Voice Recognition Technology Integration at Autopia Tours_4

Project plan
1. Necessary assumptions about the business and articulate to incorporate “Voice Recognition”
technologies
Autopia Tours is a leading Australian tour business operating through Melbourne. The
organization has expanding the business and therefore, there is need of the voice recognition
technology to serve the customers. The organization is expecting to integrate the technology in
the business to ensure that the customers are more engaged in the business operations and the
overall satisfaction for the services is effective. It is also ensured that the customers have
wireless connectivity to connect their devices with the business from the local or remote access.
Therefore, the online system is required for the business which can be accessed through the
voice recognition to execute the desired commands.
2
Project Management Plan for Voice Recognition Technology Integration at Autopia Tours_5

Figure 1: Project management activities and processes
The organization has to consider the several necessary assumptions for the business project. The
requirement gathering and other phases of the projects are mainly concerned with the availability
and capabilities in the resources. The organization has to consider the following assumptions:
Cost: Suppose that the organization has effective cost to initiate and complete the project. Also,
the cost is required to purchase and integrate the technology in the business system and make the
suitable changes in the business infrastructure. It is assumed that the organization has provided
the required amount of the capital to purchase and update the devices, infrastructure and other
3
Project Management Plan for Voice Recognition Technology Integration at Autopia Tours_6

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents