Introduction......................................................................................................................................3
Main Body.......................................................................................................................................3
Execution and control of the project through application of PRINCE-2 model.........................3
End of Project Evaluation report.................................................................................................5
Conclusion.......................................................................................................................................8
References........................................................................................................................................9
Execution and Control of Project through PRINCE-2 Model_2

Introduction
Project management is related with application of processes, methods, skills, knowledge
etc. in order to achieve project objectives within a stipulated time and budget so that effective
results can be achieved which can help in maximising the interest of stakeholders. In order to
achieve desired goals it is important that appropriate approaches are applied so that project can
be controlled and managed efficiently and its execution can be done effectively. After the
completion of report the end project report is prepared by project manager so that the the
outcomes can be evaluated and lessons can be learnt so that projects in future can be completed
effectively (Bjorvatn and Wald, 2018). In this report the execution and control of a project
related with launching an event by which QA Higher Education College can publish their
technological constructed building so that more number of students can be attracted will be
discussed. Application of PRINCE-2 model will be done for controlling the entire project so that
it can be made successful. Further reflection of self competence while executing roles and
responsibilities will be done with the help of end of project report.
Main Body
Execution and control of the project through application of PRINCE-2 model
In order to complete the project so that the desired results can be achieved within the
stipulated time and budget it is important that effective approaches are applied for controlling
and executing the project. The importance of project execution phase is that it help in conducting
the activities related with project in planned manner so that the products or services that are
produced can help in fulfilling the quality requirements of customers so that high satisfaction can
be achieved. It is also important that the activities related with project are controlled so that data
related with project can be gathered and analysed effectively and the cost and time related with
project can be managed (Cooke, 2016). Project controls are the processes that help in measuring
project status so that the likely outcomes can be forecasted and improvements can be made so
that better outcomes can be achieved. There are various processes which are involved in project
control like project planning, budgeting, risk management, change management, forecasting,
performance management etc. All these processes can help QA Higher Education College in
maximising the quality of the project related with launching technological constructed building
so that the admissions in college can increase. It can also help in improving the brand image of
Execution and Control of Project through PRINCE-2 Model_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Execution and Control of Project through PRINCE-2 Model
|8
|2809
|68

Execution and Control of Project through PRINCE-2 Model
|10
|2890
|28

Execution and Control of Project through PRINCE-2 Model
|10
|2866
|1

Execution and Control of Project through PRINCE-2 Model
|9
|3006
|61

Execution and Control of Project through PRINCE-2 Model
|10
|3072
|41

Execution and Control of Project through PRINCE-2 Model
|9
|2760
|23