logo

Project Management: Execution and Control of the Project through PRINCE-2 Model

   

Added on  2023-01-07

10 Pages3063 Words39 Views
 | 
 | 
 | 
Project management-
second assessment
Project Management: Execution and Control of the Project through PRINCE-2 Model_1

Table of Contents
INTRODUCTION...........................................................................................................................1
MAIN BODY...................................................................................................................................1
Execution and control of the project through application of PRINCE-2 model.........................1
End of Project Evaluation report.................................................................................................4
CONCLUSION ...............................................................................................................................7
REFERENCES................................................................................................................................8
Project Management: Execution and Control of the Project through PRINCE-2 Model_2

INTRODUCTION
The project management is based on the different working aspect within which the all the
associated task and activities are performed with more perfection so that appropriate outcomes
are conceived in timely basis. The project is managed and controlled as per the suitability of
objectives within which various parameters are considerate and it also assist to make positive
shift within the working standard so that affordable endings is persuade with more easiness. It is
basically based on the effective inducement of all the different strategies so that all the team
members has performed their roles and responsibilities with better appropriateness (Abyad,
2018). It is also be used to generate and creative suitable outcomes as while organising,
developing, monitoring and controlling different activities so that moderate outcomes are
developed in effective manner. In this both initiation and ending of project is considerate so that
appropriate result is developed and that produces collective benefits to the business. It also
provides more accuracy to the employees by which accomplishment of target and goals become
more easy and flexible. The project below is based on the health food items that is used to make
balanced diet through which adequate amount of vitamins and protein is provided to the
customers. The report includes PRINCE 2 model so as to make suitable control and execution on
all the performed task. In addition self reflection that is used to analyse the competency of
execution.
MAIN BODY
Execution and control of the project through application of PRINCE-2 model
Project management is a working procedure through which moderate and adequate
changes are conceived so that parallel changes within the productivity and performance is
developed. In this project manager plays vital role as they have assigned appropriate job role to
the others by which they have completed their working within the timely basis so that probability
of generation of favourable outcome is developed (Fleming, 2019). The project completion
includes the achievement of different constraints with more suitability as with this the efficient
ending is processed with more comfort. In this it is essential that all the task and actions are
completed within the allocated budget and timeline so that more profit is developed in systematic
format. In this the accurate changes are required to processed thus the project manager always
progressed the project completion as per the demand of conductions and also make appropriate
1
Project Management: Execution and Control of the Project through PRINCE-2 Model_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Execution and Control of Project through PRINCE-2 Model
|10
|3072
|41

Control and Execution of Project with PRINCE-2 Model
|10
|3375
|63

Execution and Control of Project through PRINCE-2 Model
|9
|3006
|61

Execution and Control of Project through PRINCE-2 Model
|9
|2817
|1

Execution and Control of Project through PRINCE-2 Model
|10
|2866
|1

Execution and Control of Project through PRINCE-2 Model
|8
|2809
|68