Software Application for Online Fuel Booking and Payment
VerifiedAdded on  2022/12/18
|23
|3789
|122
AI Summary
This project aims to develop a software application for online fuel booking and payment. It includes the development of clear and concise software requirement specification, identification of risks and development of risk management plan, and the creation of an easy and secure payment portal for fuel booking to customers. The project also involves designing a monitoring and control strategy, stakeholder engagement plan, and page navigation.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Contents
Introduction:...............................................................................................................................2
Deliverables................................................................................................................................2
Software Requirement specification plan..................................................................................2
Stakeholder management plan...............................................................................................2
Stakeholder contribution:.......................................................................................................4
Software Requirement:...........................................................................................................4
Database Design.....................................................................................................................5
E-R Diagram..........................................................................................................................7
Software Benefit.....................................................................................................................9
Security Requirement:............................................................................................................9
Project Management Plan:.......................................................................................................10
Project Schedule:..................................................................................................................10
Project Estimated Cost plan:................................................................................................11
Assumptions, Dependencies and constraints...........................................................................13
Risks Management Plan:..........................................................................................................14
Communication Management plan......................................................................................16
Monitoring and Control Mechanism:...................................................................................18
Conclusion:..............................................................................................................................21
References................................................................................................................................22
Introduction:...............................................................................................................................2
Deliverables................................................................................................................................2
Software Requirement specification plan..................................................................................2
Stakeholder management plan...............................................................................................2
Stakeholder contribution:.......................................................................................................4
Software Requirement:...........................................................................................................4
Database Design.....................................................................................................................5
E-R Diagram..........................................................................................................................7
Software Benefit.....................................................................................................................9
Security Requirement:............................................................................................................9
Project Management Plan:.......................................................................................................10
Project Schedule:..................................................................................................................10
Project Estimated Cost plan:................................................................................................11
Assumptions, Dependencies and constraints...........................................................................13
Risks Management Plan:..........................................................................................................14
Communication Management plan......................................................................................16
Monitoring and Control Mechanism:...................................................................................18
Conclusion:..............................................................................................................................21
References................................................................................................................................22
Introduction:
Easy operations in relation to the fuel booking ad payment can be effectively done through
the development of the software applications which facilitates the customers and companies.
It helps in managing connectivity between the consumers and providers. The query posted by
them will be solved at first glance and provides quality of services and facilities to increase
the level of satisfaction (Anderson, 2015). The success of the project depends on the strategy
developed for giving reliable services and secured booking and payment system. The purpose
of this project is to develop a software application which is capable of online booking and
payment of fuel required by the users.
Deliverables
The deliverables of the project are highlighted below:
ï‚· Development of clear and concise software requirement specification
ï‚· Identification of risks and development of the risk management plan
ï‚· Easy and secure payment portal for fuel booking to customers
ï‚· On demand booking of fuel
ï‚· Designing of Software application screenshot
ï‚· Welcome screen
ï‚· Login Page
ï‚· Registration page
ï‚· Designing of monitoring and control strategy
ï‚· Stakeholder engagement plan
ï‚· Page navigation
Software Requirement specification plan
Stakeholder management plan
Project team is comprised of five members so that good and relevant mobile application can
be developed for easy fuel booking and secured payment system. The amalgamative efforts
of the team members help in retrieving the goal and scope of the undertaken project.
Stakeholder Role Type of Stakeholders Responsibilities
Project Manager Internal He is responsible for designing
Easy operations in relation to the fuel booking ad payment can be effectively done through
the development of the software applications which facilitates the customers and companies.
It helps in managing connectivity between the consumers and providers. The query posted by
them will be solved at first glance and provides quality of services and facilities to increase
the level of satisfaction (Anderson, 2015). The success of the project depends on the strategy
developed for giving reliable services and secured booking and payment system. The purpose
of this project is to develop a software application which is capable of online booking and
payment of fuel required by the users.
Deliverables
The deliverables of the project are highlighted below:
ï‚· Development of clear and concise software requirement specification
ï‚· Identification of risks and development of the risk management plan
ï‚· Easy and secure payment portal for fuel booking to customers
ï‚· On demand booking of fuel
ï‚· Designing of Software application screenshot
ï‚· Welcome screen
ï‚· Login Page
ï‚· Registration page
ï‚· Designing of monitoring and control strategy
ï‚· Stakeholder engagement plan
ï‚· Page navigation
Software Requirement specification plan
Stakeholder management plan
Project team is comprised of five members so that good and relevant mobile application can
be developed for easy fuel booking and secured payment system. The amalgamative efforts
of the team members help in retrieving the goal and scope of the undertaken project.
Stakeholder Role Type of Stakeholders Responsibilities
Project Manager Internal He is responsible for designing
of project requirement
specification plan, scheduling
of activities, allocation of time
duration, allocation of
responsibilities, synchronising
the activities according to the
required output, time frame, and
managing resources ((Acosta,
2015)
Software Designer Internal He is responsible for
developing the software
according to the predefined and
approved requirement
specification plan (Badewi,
2015)
Software Developers Internal Software developer write down
the coding and test plan for the
developed software design
Software Analyst Internal He is responsible for evaluating
and verifying the software
output according to the
developed software requirement
specification
Risk Manager Internal Risk manager is responsible for
identifying the risks and design
effective risks management plan
so that activities and project
schedule can be completed
within the given time frame
specification plan, scheduling
of activities, allocation of time
duration, allocation of
responsibilities, synchronising
the activities according to the
required output, time frame, and
managing resources ((Acosta,
2015)
Software Designer Internal He is responsible for
developing the software
according to the predefined and
approved requirement
specification plan (Badewi,
2015)
Software Developers Internal Software developer write down
the coding and test plan for the
developed software design
Software Analyst Internal He is responsible for evaluating
and verifying the software
output according to the
developed software requirement
specification
Risk Manager Internal Risk manager is responsible for
identifying the risks and design
effective risks management plan
so that activities and project
schedule can be completed
within the given time frame
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Stakeholder contribution:
Resource
Name Type Materia
l Label
Initial
s
Grou
p
Max.
Units Std. Rate Ovt.
Rate
Cost/
Use
Accrue
At
Base
Calendar
Project
Manager
Wor
k P 100
%
$23.00/
hr
$0.00/
hr $0.00 Prorate
d
Standar
d
Software
Designer Work S 100% $15.00/hr $0.00/hr $0.00 Prorated Standard
Software
Develope
r
Work S 100% $10.00/hr $0.00/hr $0.00 Prorated Standard
Software
Analyst Work S 100% $10.00/hr $0.00/hr $0.00 Prorated Standard
Risk
Manager Work R 100% $15.00/hr $0.00/hr $0.00 Prorated Standard
Software Requirement:
The proposed system is the development of the online mobile application for the online
booking of fuel and secured payment. Development of software application helps in resolving
difficulty faced by the consumers in booking fuel in performing their day to day operation
(Kasar, Dhaygude, Godse, and Gurgule, 2016). Tracking of the errors is the way to minimize
overhead cost and provides reliable services to the customers.
Hardware Requirement:
Particulars Specification
Processor I 5
Or
Quad core processor
Processing speed 1 Ghtz
Ram 1 Gb RAM
Hard Disk 32 GB
Software Requirement:
Particulars Specification
Resource
Name Type Materia
l Label
Initial
s
Grou
p
Max.
Units Std. Rate Ovt.
Rate
Cost/
Use
Accrue
At
Base
Calendar
Project
Manager
Wor
k P 100
%
$23.00/
hr
$0.00/
hr $0.00 Prorate
d
Standar
d
Software
Designer Work S 100% $15.00/hr $0.00/hr $0.00 Prorated Standard
Software
Develope
r
Work S 100% $10.00/hr $0.00/hr $0.00 Prorated Standard
Software
Analyst Work S 100% $10.00/hr $0.00/hr $0.00 Prorated Standard
Risk
Manager Work R 100% $15.00/hr $0.00/hr $0.00 Prorated Standard
Software Requirement:
The proposed system is the development of the online mobile application for the online
booking of fuel and secured payment. Development of software application helps in resolving
difficulty faced by the consumers in booking fuel in performing their day to day operation
(Kasar, Dhaygude, Godse, and Gurgule, 2016). Tracking of the errors is the way to minimize
overhead cost and provides reliable services to the customers.
Hardware Requirement:
Particulars Specification
Processor I 5
Or
Quad core processor
Processing speed 1 Ghtz
Ram 1 Gb RAM
Hard Disk 32 GB
Software Requirement:
Particulars Specification
Operating system Android Operating System
Or
Window 7
Environment ASP.Net
Dot Net Framework Version 4.0
Language used C#
Dot net Backend Software SQL server 2010
Database Design
Cost Table
Column Name Data type Remark
Fuel_Type Varchar (8) Type of Fuel
Cost Float (4) Price of fuel
Quantity Float (4) Quantity in Litres
Billing Table:
Column Name Data Type Remark
Bill_IDNo. Integer Id number of the bill
Cus-no Float (4) Customer ID number
Fuel_Type Varchar (8) Type of Fuel
Booking_Date Date Date of booking fuel
Delivery_Date Date Date of Delivery Fuel to
customer
Amount_Paid Float (4) Amount
Customer Table:
Column Name Data Type Remark
Cus-no Float (4) Customer ID number
Password Varchar (8) User Password
Fuel_Type Varchar (8) Type of Fuel
Cus-Name Varchar (20) Name of consumer
Cus-Add Varchar (20) Address of consumer
Or
Window 7
Environment ASP.Net
Dot Net Framework Version 4.0
Language used C#
Dot net Backend Software SQL server 2010
Database Design
Cost Table
Column Name Data type Remark
Fuel_Type Varchar (8) Type of Fuel
Cost Float (4) Price of fuel
Quantity Float (4) Quantity in Litres
Billing Table:
Column Name Data Type Remark
Bill_IDNo. Integer Id number of the bill
Cus-no Float (4) Customer ID number
Fuel_Type Varchar (8) Type of Fuel
Booking_Date Date Date of booking fuel
Delivery_Date Date Date of Delivery Fuel to
customer
Amount_Paid Float (4) Amount
Customer Table:
Column Name Data Type Remark
Cus-no Float (4) Customer ID number
Password Varchar (8) User Password
Fuel_Type Varchar (8) Type of Fuel
Cus-Name Varchar (20) Name of consumer
Cus-Add Varchar (20) Address of consumer
Zip Code Number (6) Area pin code
Mobile-No. Number (10) Mobile number of customer
for contact
Fuel Stock Table:
Customer Name Data Type Remark
Date Date Date
Store_commercial Integer Total stock for commercial
purpose
Store_Domestic Integer Total stock for domestic
purpose
Defect_Stock Integer Defective stock
Current_Stock Integer Current status of stock
Transaction Table:
Column Name Data Type Remark
Trans_ID Integer Transaction ID number
generated automatically in
serial order
Cus-no Float (4) Customer ID number
Fuel_Type Varchar (8) Type of Fuel
Cus-Name Varchar (20) Name of consumer
Cus-Add Varchar (20) Address of consumer
Transaction_Status Varchar (10) Status of the transaction
completed
Mobile-No. Number (10) Mobile number of customer
for contact
Fuel Stock Table:
Customer Name Data Type Remark
Date Date Date
Store_commercial Integer Total stock for commercial
purpose
Store_Domestic Integer Total stock for domestic
purpose
Defect_Stock Integer Defective stock
Current_Stock Integer Current status of stock
Transaction Table:
Column Name Data Type Remark
Trans_ID Integer Transaction ID number
generated automatically in
serial order
Cus-no Float (4) Customer ID number
Fuel_Type Varchar (8) Type of Fuel
Cus-Name Varchar (20) Name of consumer
Cus-Add Varchar (20) Address of consumer
Transaction_Status Varchar (10) Status of the transaction
completed
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
E-R Diagram
Customer
Transaction Stock
Payment
Check
Process
RegistrationBill
Cost
Cus_No
Password
Fuel_Type
Cus_Name
Address
Trans_ID Cus_No
Fuel_Typ
eCus_Name
Cus_ad
d
Transaction
Status
Date
Stock_Commercial
Stock_Domesti
c
Defect Stock
Current_Stock
Fuel_Type
Quantity
Cost
Fuel_Type
Booking_date
Delivery_date Amount_Paid
Cus_No
Customer
Transaction Stock
Payment
Check
Process
RegistrationBill
Cost
Cus_No
Password
Fuel_Type
Cus_Name
Address
Trans_ID Cus_No
Fuel_Typ
eCus_Name
Cus_ad
d
Transaction
Status
Date
Stock_Commercial
Stock_Domesti
c
Defect Stock
Current_Stock
Fuel_Type
Quantity
Cost
Fuel_Type
Booking_date
Delivery_date Amount_Paid
Cus_No
Software Benefit
Online booking fuel booking system helps in providing interface between the company and
the consumers so that instant response can be provided to the query posted by the users.
Consumers are provided with the details of amount paid and date of delivery of the fuel with
the mentioned quantity. Customer personal details are filled in the customer registration form
which helps in mentioning the delivery address. Users are provided with the unique ID
number and password so that they can login into their accounts by using login credentials for
the booking of required quantity of fuel and delivered at the required destination. Customers
are able to retrieve their order at their required destination and at affordable price (Hamad,
2018). Cost of Fuel is cheaper than the market price because in online portal system dealer
directly deals with the customers. It helps in managing interaction between the customers and
company. Consumers are able to provide their feedback on the quality of service they receive
so that improvement in the services provided to the users can be improved effectively. The
query posted by them will be solved at first glance and provides quality of services and
facilities to increase the level of satisfaction (Kumar and Bansal, 2010).
Security Requirement:
Security is the major concern for the users to pay the amount of money through the online
transaction. It is required to intimate the users with the security system in the payment
module through which they can securely complete their transaction. Bill is generated which
mentions the amount of money paid by the users for the verification of the transaction
completion (Naranayan and et. al., 2015). Online payment can be done within the fraction of
seconds which saves time of the user. Users are provided with different modules for carrying
out online payments such as by using debit card, credit card, net banking, smart cards, e-
checks, e-wallet, and others (Ryan, and Efatmaneshnik, 2015). Security is the perquisite for
online and offline payment. Strategic plans are designed for minimizing the frauds and
information leakages from the payment gateways to the third party. Standard security
protocols are used for securing the payment process (Sulaman, Weyns, and Host, 2013).
Cryptographic techniques are used for safely and securely completing the payment process by
Online booking fuel booking system helps in providing interface between the company and
the consumers so that instant response can be provided to the query posted by the users.
Consumers are provided with the details of amount paid and date of delivery of the fuel with
the mentioned quantity. Customer personal details are filled in the customer registration form
which helps in mentioning the delivery address. Users are provided with the unique ID
number and password so that they can login into their accounts by using login credentials for
the booking of required quantity of fuel and delivered at the required destination. Customers
are able to retrieve their order at their required destination and at affordable price (Hamad,
2018). Cost of Fuel is cheaper than the market price because in online portal system dealer
directly deals with the customers. It helps in managing interaction between the customers and
company. Consumers are able to provide their feedback on the quality of service they receive
so that improvement in the services provided to the users can be improved effectively. The
query posted by them will be solved at first glance and provides quality of services and
facilities to increase the level of satisfaction (Kumar and Bansal, 2010).
Security Requirement:
Security is the major concern for the users to pay the amount of money through the online
transaction. It is required to intimate the users with the security system in the payment
module through which they can securely complete their transaction. Bill is generated which
mentions the amount of money paid by the users for the verification of the transaction
completion (Naranayan and et. al., 2015). Online payment can be done within the fraction of
seconds which saves time of the user. Users are provided with different modules for carrying
out online payments such as by using debit card, credit card, net banking, smart cards, e-
checks, e-wallet, and others (Ryan, and Efatmaneshnik, 2015). Security is the perquisite for
online and offline payment. Strategic plans are designed for minimizing the frauds and
information leakages from the payment gateways to the third party. Standard security
protocols are used for securing the payment process (Sulaman, Weyns, and Host, 2013).
Cryptographic techniques are used for safely and securely completing the payment process by
using the online mode. Notification regarding the transaction process should be sent to the
user so that in case of fraud required action can be taken within time. The diagram below
shows the payment process used for online payment mode:
Project Management Plan:
Project Schedule:
Task Name Duratio
n Start Finish
Fuel consumption report and
employee roster management 37 days Tue 10-09-19 Wed 30-10-19
Project Planning Phase 13 days Tue 10-09-19 Thu 26-09-19
Project Proposal 1 day Tue 10-09-19 Tue 10-09-19
Feasibility Analysis 2 days Wed 11-09-19 Thu 12-09-19
Required Output 1 day Fri 13-09-19 Fri 13-09-19
Development of requirement
specification plan 2 days Mon 16-09-19 Tue 17-09-19
Cost Estimation 2 days Wed 18-09-19 Thu 19-09-19
Project Schedule 3 days Thu 19-09-19 Mon 23-09-19
user so that in case of fraud required action can be taken within time. The diagram below
shows the payment process used for online payment mode:
Project Management Plan:
Project Schedule:
Task Name Duratio
n Start Finish
Fuel consumption report and
employee roster management 37 days Tue 10-09-19 Wed 30-10-19
Project Planning Phase 13 days Tue 10-09-19 Thu 26-09-19
Project Proposal 1 day Tue 10-09-19 Tue 10-09-19
Feasibility Analysis 2 days Wed 11-09-19 Thu 12-09-19
Required Output 1 day Fri 13-09-19 Fri 13-09-19
Development of requirement
specification plan 2 days Mon 16-09-19 Tue 17-09-19
Cost Estimation 2 days Wed 18-09-19 Thu 19-09-19
Project Schedule 3 days Thu 19-09-19 Mon 23-09-19
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Risk Identification 1 day Tue 24-09-19 Tue 24-09-19
Software Security Requirement 2 days Wed 25-09-19 Thu 26-09-19
Project Designing Phase 8 days Fri 27-09-19 Tue 08-10-19
Finalization of Software
requirement specification 2 days Fri 27-09-19 Mon 30-09-19
Software Design 3 days Tue 01-10-19 Thu 03-10-19
Risks Management plan 1 day Fri 04-10-19 Fri 04-10-19
Monitoring and control
mechanism 2 days Mon 07-10-19 Tue 08-10-19
Coding and Testing Phase 11 days Wed 09-10-19 Wed 23-10-19
Coding of Software Design 3 days Wed 09-10-19 Fri 11-10-19
Prepare test plan and procedures 3 days Mon 14-10-19 Wed 16-10-19
Testing of software 2 days Thu 17-10-19 Fri 18-10-19
Verifying output with the
software requirement 2 days Mon 21-10-19 Tue 22-10-19
Test report 1 day Wed 23-10-19 Wed 23-10-19
Project Closure 5 days Thu 24-10-19 Wed 30-10-19
Handover test report 2 days Thu 24-10-19 Fri 25-10-19
Handover software for operation 2 days Mon 28-10-19 Tue 29-10-19
Project close 1 day Wed 30-10-19 Wed 30-10-19
Project Estimated Cost plan:
Task Name Duration Resource
Names Cost Predecessors
Fuel consumption report and
employee roster management 37 days $5,064.00
Project Planning Phase 13 days $2,304.00
Project Proposal 1 day Project
Manager $184.00
Software Security Requirement 2 days Wed 25-09-19 Thu 26-09-19
Project Designing Phase 8 days Fri 27-09-19 Tue 08-10-19
Finalization of Software
requirement specification 2 days Fri 27-09-19 Mon 30-09-19
Software Design 3 days Tue 01-10-19 Thu 03-10-19
Risks Management plan 1 day Fri 04-10-19 Fri 04-10-19
Monitoring and control
mechanism 2 days Mon 07-10-19 Tue 08-10-19
Coding and Testing Phase 11 days Wed 09-10-19 Wed 23-10-19
Coding of Software Design 3 days Wed 09-10-19 Fri 11-10-19
Prepare test plan and procedures 3 days Mon 14-10-19 Wed 16-10-19
Testing of software 2 days Thu 17-10-19 Fri 18-10-19
Verifying output with the
software requirement 2 days Mon 21-10-19 Tue 22-10-19
Test report 1 day Wed 23-10-19 Wed 23-10-19
Project Closure 5 days Thu 24-10-19 Wed 30-10-19
Handover test report 2 days Thu 24-10-19 Fri 25-10-19
Handover software for operation 2 days Mon 28-10-19 Tue 29-10-19
Project close 1 day Wed 30-10-19 Wed 30-10-19
Project Estimated Cost plan:
Task Name Duration Resource
Names Cost Predecessors
Fuel consumption report and
employee roster management 37 days $5,064.00
Project Planning Phase 13 days $2,304.00
Project Proposal 1 day Project
Manager $184.00
Feasibility Analysis 2 days Project
Manager $368.00 3
Required Output 1 day Project
Manager $184.00 4
Development of requirement
specification plan 2 days Project
Manager $368.00 5
Cost Estimation 2 days Project
Manager $368.00 6
Project Schedule 3 days Project
Manager $552.00 6
Risk Identification 1 day Risk Manager $120.00 7,8
Software Security Requirement 2 days Software
Analyst $160.00 9
Project Designing Phase 8 days $1,008.00
Finalization of Software
requirement specification 2 days Software
Analyst $160.00 10
Software Design 3 days Software
Designer $360.00 12
Risks Management plan 1 day Risk Manager $120.00 13
Monitoring and control
mechanism 2 days Project
Manager $368.00 14
Coding and Testing Phase 11 days $1,040.00
Coding of Software Design 3 days Software
Developer $240.00 15
Prepare test plan and procedures 3 days Software
Developer $240.00 17
Testing of software 2 days Software
Designer $240.00 18
Verifying output with the
software requirement 2 days Software
Designer $240.00 19
Test report 1 day Software $80.00 20
Manager $368.00 3
Required Output 1 day Project
Manager $184.00 4
Development of requirement
specification plan 2 days Project
Manager $368.00 5
Cost Estimation 2 days Project
Manager $368.00 6
Project Schedule 3 days Project
Manager $552.00 6
Risk Identification 1 day Risk Manager $120.00 7,8
Software Security Requirement 2 days Software
Analyst $160.00 9
Project Designing Phase 8 days $1,008.00
Finalization of Software
requirement specification 2 days Software
Analyst $160.00 10
Software Design 3 days Software
Designer $360.00 12
Risks Management plan 1 day Risk Manager $120.00 13
Monitoring and control
mechanism 2 days Project
Manager $368.00 14
Coding and Testing Phase 11 days $1,040.00
Coding of Software Design 3 days Software
Developer $240.00 15
Prepare test plan and procedures 3 days Software
Developer $240.00 17
Testing of software 2 days Software
Designer $240.00 18
Verifying output with the
software requirement 2 days Software
Designer $240.00 19
Test report 1 day Software $80.00 20
Analyst
Project Closure 5 days $712.00
Handover test report 2 days Project
Manager $368.00 21
Handover software for operation 2 days Software
Analyst $160.00 23
Project close 1 day Project
Manager $184.00 24
Assumptions, Dependencies and constraints
The success of the project depends on the completion of project activities within the given
time frame and cost determined. Strategic plan should be developed for fulfilling the
requirement of the customers as mentioned in the software requirement specification plan.
Activities are to be designed by following the legal laws so that legal obligations can be
omitted at top priority. Strategic plans are designed for minimizing the frauds and
information leakages from the payment gateways to the third party. It is assumed that the
software developing team has required skills and expertise so that effective mobile
application for fuel booking and payment system can be developed which helps in facilitating
easy booking of fuel and secured payment. Time and costs are the top major factors to
complete the given project flawlessly.
Assumption Dependencies Constraints
Verified Requirement
Specification plan
Success of the project
depends on the completion of
project activities within the
given time frame and cost
determined
Time
Strategic plan follows legal
laws
Key skills and expertise of
the team members
Cost
Software developing team
has required skills and
expertise
Strategic plans are designed
for minimizing the frauds
and information leakages
Project Closure 5 days $712.00
Handover test report 2 days Project
Manager $368.00 21
Handover software for operation 2 days Software
Analyst $160.00 23
Project close 1 day Project
Manager $184.00 24
Assumptions, Dependencies and constraints
The success of the project depends on the completion of project activities within the given
time frame and cost determined. Strategic plan should be developed for fulfilling the
requirement of the customers as mentioned in the software requirement specification plan.
Activities are to be designed by following the legal laws so that legal obligations can be
omitted at top priority. Strategic plans are designed for minimizing the frauds and
information leakages from the payment gateways to the third party. It is assumed that the
software developing team has required skills and expertise so that effective mobile
application for fuel booking and payment system can be developed which helps in facilitating
easy booking of fuel and secured payment. Time and costs are the top major factors to
complete the given project flawlessly.
Assumption Dependencies Constraints
Verified Requirement
Specification plan
Success of the project
depends on the completion of
project activities within the
given time frame and cost
determined
Time
Strategic plan follows legal
laws
Key skills and expertise of
the team members
Cost
Software developing team
has required skills and
expertise
Strategic plans are designed
for minimizing the frauds
and information leakages
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
from the payment gateways
to the third party.
Risks Management Plan:
Risks are the concern and complexities associated with the project development lifecycle
Strategic and tactical plans are to be developed so that they can be minimize at top priority
and the project process can be completed flawlessly. Some of the risks identified in the
development of fuel booking system are described below:
Risk Identified Description
Security in Payment system Customers are not confident about the
security system associated with the payment
system for doing online transaction and
billing of the fuel ordered and booked
Failure of software Operating system is not applicable for
running the designed application
Failure of Software Required hardware is not used for running
the application such as smart phones
Skills and expertise Team members are not having authentic
skills to develop the required software
application
Time Project delay since activities are not
completed on the given duration of time
Cost Over-running of cost due to poor estimation
Security Security is the major concern in doing online
payment
Risk Mitigation Plan
Risk Identified Risk Priority Risk Probability Risk Impact Risk Mitigation
plan
Security in
Payment system
High Low High Intrusion
detection and
firewall
to the third party.
Risks Management Plan:
Risks are the concern and complexities associated with the project development lifecycle
Strategic and tactical plans are to be developed so that they can be minimize at top priority
and the project process can be completed flawlessly. Some of the risks identified in the
development of fuel booking system are described below:
Risk Identified Description
Security in Payment system Customers are not confident about the
security system associated with the payment
system for doing online transaction and
billing of the fuel ordered and booked
Failure of software Operating system is not applicable for
running the designed application
Failure of Software Required hardware is not used for running
the application such as smart phones
Skills and expertise Team members are not having authentic
skills to develop the required software
application
Time Project delay since activities are not
completed on the given duration of time
Cost Over-running of cost due to poor estimation
Security Security is the major concern in doing online
payment
Risk Mitigation Plan
Risk Identified Risk Priority Risk Probability Risk Impact Risk Mitigation
plan
Security in
Payment system
High Low High Intrusion
detection and
firewall
protection
system should
be initiated in
the software
project
Failure of
software
Medium High Medium Specification of
the software is
to be clearly
defined
Failure of
Software
Low Medium High Back support of
the software
should be kept
Skills and
expertise
High Low Low Training and
development
program for the
team members is
to be arranged
so that
application can
be developed
smoothly
without any
hindrance
Time High Low High Development of
project schedule
helps in
specifying the
time duration of
activities for
finishing the
task within the
required time
Cost Medium High Medium Market analysis
system should
be initiated in
the software
project
Failure of
software
Medium High Medium Specification of
the software is
to be clearly
defined
Failure of
Software
Low Medium High Back support of
the software
should be kept
Skills and
expertise
High Low Low Training and
development
program for the
team members is
to be arranged
so that
application can
be developed
smoothly
without any
hindrance
Time High Low High Development of
project schedule
helps in
specifying the
time duration of
activities for
finishing the
task within the
required time
Cost Medium High Medium Market analysis
helps in
developing
effective cost
estimation plan
by minimizing
the variation in
prices.
Security High Medium Low Security
protocols and
cryptographic
procedures are
used for
preserving the
confidential
information of
the users and
helps in
completing the
online payment
securely through
the secured
gateways.
Communication Management plan
Who When How What Whom
Project Manager During the
project planning
phase
Email
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Designing of
project
requirement
specification plan,
scheduling of
activities,
allocation of time
duration,
Project team
Members
developing
effective cost
estimation plan
by minimizing
the variation in
prices.
Security High Medium Low Security
protocols and
cryptographic
procedures are
used for
preserving the
confidential
information of
the users and
helps in
completing the
online payment
securely through
the secured
gateways.
Communication Management plan
Who When How What Whom
Project Manager During the
project planning
phase
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Designing of
project
requirement
specification plan,
scheduling of
activities,
allocation of time
duration,
Project team
Members
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
allocation of
responsibilities,
synchronising the
activities
according to the
required output,
time frame, and
managing
resources
Software
Designer
During the
Project
Designing phase
Email
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Software Design
according to the
predefined and
approved
requirement
specification plan
Project
Manager
Software
Developer
During coding
and testing
phase
Email
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Coding and test
plan for the
developed
software design
Project
Manager
Software analyst During the
coding and
testing phase
Email
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Verifies the
software output
according to the
developed
software
requirement
specification and
Generates test
report
Project
Manager
Risk Manager Throughout the Email Identifying the Project
responsibilities,
synchronising the
activities
according to the
required output,
time frame, and
managing
resources
Software
Designer
During the
Project
Designing phase
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Software Design
according to the
predefined and
approved
requirement
specification plan
Project
Manager
Software
Developer
During coding
and testing
phase
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Coding and test
plan for the
developed
software design
Project
Manager
Software analyst During the
coding and
testing phase
Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
Verifies the
software output
according to the
developed
software
requirement
specification and
Generates test
report
Project
Manager
Risk Manager Throughout the Email Identifying the Project
project Newsletter
Telephonic
conversation
Video Calling
Round table
Discussion
risks and design
effective risks
management plan
so that activities
and project
schedule can be
completed within
the given time
frame
Manager
Monitoring and Control Mechanism:
Project monitoring and control mechanism depends on the identification of risks level
associated with the complexities. Status of risks occurrence is calculated for omitting it in
future. Changes in the project scope are done according to the action plan developed for
mitigating the risks at an early stage. Training and development program is arranged for
solving the expertise and skills issues which exist with them so that operations can be be
flourishing within required deadline and cost (Yang, and Gao, 2016). Flowchart below gives
the details of monitoring and control procedures for managing the changes and issues
associated with the development of software cycle.
Monitoring of project process is used for comparing the software specification document with
the output of the project cycle. It helps in measuring the changes required in the project scope
so that customers can be satisfied with the developed software. It is used for noticing the
variation for evaluating the verification and validation process.
Project monitoring can be effectively done by measuring the efficiency of five parameters
which are named as project schedule, cost estimation plan, deliverables of the projects,
Quality of service provided to the users, and benefits.
Table below shows the monitoring process can be completed by evaluating the five
parameters:
Parameters Description Status
Project Schedule Project is to be completed
within the period of 1 month
without any delay.
Project will be completed
Success
No delay
Telephonic
conversation
Video Calling
Round table
Discussion
risks and design
effective risks
management plan
so that activities
and project
schedule can be
completed within
the given time
frame
Manager
Monitoring and Control Mechanism:
Project monitoring and control mechanism depends on the identification of risks level
associated with the complexities. Status of risks occurrence is calculated for omitting it in
future. Changes in the project scope are done according to the action plan developed for
mitigating the risks at an early stage. Training and development program is arranged for
solving the expertise and skills issues which exist with them so that operations can be be
flourishing within required deadline and cost (Yang, and Gao, 2016). Flowchart below gives
the details of monitoring and control procedures for managing the changes and issues
associated with the development of software cycle.
Monitoring of project process is used for comparing the software specification document with
the output of the project cycle. It helps in measuring the changes required in the project scope
so that customers can be satisfied with the developed software. It is used for noticing the
variation for evaluating the verification and validation process.
Project monitoring can be effectively done by measuring the efficiency of five parameters
which are named as project schedule, cost estimation plan, deliverables of the projects,
Quality of service provided to the users, and benefits.
Table below shows the monitoring process can be completed by evaluating the five
parameters:
Parameters Description Status
Project Schedule Project is to be completed
within the period of 1 month
without any delay.
Project will be completed
Success
No delay
successfully within the due
date
Cost Project is to be completed
within the approved cost
Overrunning of cost may
result into project failure
Success
Completed under budget
Quality Security is the major concern
of the user during payment
transaction
Success
Payment transaction can be
securely done
Deliverables Development of clear and
concise software requirement
specification
Identification of risks and
development of the risk
management plan
Easy and secure payment
portal for fuel booking to
customers
On demand booking of fuel
Designing of Software
application screenshot
Designing of monitoring and
control strategy
Stakeholder engagement plan
Page navigation
Success
Benefit Online booking of fuel
Online payment option
Delivery at required
destination
Secure payment
Acknowledges about the
status of order
Success
date
Cost Project is to be completed
within the approved cost
Overrunning of cost may
result into project failure
Success
Completed under budget
Quality Security is the major concern
of the user during payment
transaction
Success
Payment transaction can be
securely done
Deliverables Development of clear and
concise software requirement
specification
Identification of risks and
development of the risk
management plan
Easy and secure payment
portal for fuel booking to
customers
On demand booking of fuel
Designing of Software
application screenshot
Designing of monitoring and
control strategy
Stakeholder engagement plan
Page navigation
Success
Benefit Online booking of fuel
Online payment option
Delivery at required
destination
Secure payment
Acknowledges about the
status of order
Success
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Analysis of the five parameters helps in evaluating that project is successfully completed or
not.
Monitoring and control process
Conducting Meeting with the project manager by identifying the status of the software
development life cycle
Reviewing the requirement specification plan for changes required
Reviewing the software designing process
Reviewing the software development and coding process
Reviewing the output of software developed by applying testing procedures
Verifying the required output with the software output
not.
Monitoring and control process
Conducting Meeting with the project manager by identifying the status of the software
development life cycle
Reviewing the requirement specification plan for changes required
Reviewing the software designing process
Reviewing the software development and coding process
Reviewing the output of software developed by applying testing procedures
Verifying the required output with the software output
Conclusion:
It can be concluded that development of software application helps in resolving difficulty
faced by the consumers in booking fuel in performing their day to day operation. Online
booking fuel booking system helps in providing interface between the company and the
consumers so that instant response can be provided to the query posted by the users. Security
is the major concern for the users to pay the amount of money through the online transaction.
It is required to intimate the users with the security system in the payment module through
which they can securely complete their transaction. Activities are to be designed by following
the legal laws so that legal obligations can be omitted at top priority. Project monitoring and
control mechanism depends on the identification of risks level associated with the
Identifying the action taken to minimize the risks associated with the online payment
process
Preparing monitoring report for approval
It can be concluded that development of software application helps in resolving difficulty
faced by the consumers in booking fuel in performing their day to day operation. Online
booking fuel booking system helps in providing interface between the company and the
consumers so that instant response can be provided to the query posted by the users. Security
is the major concern for the users to pay the amount of money through the online transaction.
It is required to intimate the users with the security system in the payment module through
which they can securely complete their transaction. Activities are to be designed by following
the legal laws so that legal obligations can be omitted at top priority. Project monitoring and
control mechanism depends on the identification of risks level associated with the
Identifying the action taken to minimize the risks associated with the online payment
process
Preparing monitoring report for approval
complexities. Status of risks occurrence is calculated for omitting it in future. Changes in the
project scope are done according to the action plan developed for mitigating the risks at an
early stage.
References
Acosta, K. (2015). Online payment process. Ebook [Online]. Available at: https://webuser.hs-
furtwangen.de/~heindl/ebte-08-ss-Online-Payment-Process-Kathleen.pdf [Accessed on 06
September, 2019]
Anderson, S. (2015). Project quality and project management. International journal of
project management, 10(3). Available at:
https://www.sciencedirect.com/science/article/abs/pii/026378639290002Q [Accessed on 06
September, 2019]
Badewi, D. (2015). The impact of project management and benefits management practices on
project success: towards developing a project benefit governance framework. Ebook
[Online]. Available at:
https://cdn.ymaws.com/www.projectmanagement.org.za/resource/resmgr/
KS_July_2016/3.Elsevier_The_impact_of_Ben.PDF [Accessed on 06 September, 2019]
Hamad, W. (2018). The role of ICT in knowledge management processes: A review. Ebook
[Online]. Available at:
https://pdfs.semanticscholar.org/4722/38a6fc0bc8c2cd27ddef33e892e535a021d6.pdf
[Accessed on 06 September, 2019]
Kasar, M., Dhaygude, R., Godse, S., and Gurgule, S. (2016). Automatic LPG gas booking
and detection system. International journal of advanced research in electrical and
electronics, 5(3). Available at:
https://www.ijareeie.com/upload/2016/march/8_Comparative.pdf [Accessed on 06
September, 2019]
project scope are done according to the action plan developed for mitigating the risks at an
early stage.
References
Acosta, K. (2015). Online payment process. Ebook [Online]. Available at: https://webuser.hs-
furtwangen.de/~heindl/ebte-08-ss-Online-Payment-Process-Kathleen.pdf [Accessed on 06
September, 2019]
Anderson, S. (2015). Project quality and project management. International journal of
project management, 10(3). Available at:
https://www.sciencedirect.com/science/article/abs/pii/026378639290002Q [Accessed on 06
September, 2019]
Badewi, D. (2015). The impact of project management and benefits management practices on
project success: towards developing a project benefit governance framework. Ebook
[Online]. Available at:
https://cdn.ymaws.com/www.projectmanagement.org.za/resource/resmgr/
KS_July_2016/3.Elsevier_The_impact_of_Ben.PDF [Accessed on 06 September, 2019]
Hamad, W. (2018). The role of ICT in knowledge management processes: A review. Ebook
[Online]. Available at:
https://pdfs.semanticscholar.org/4722/38a6fc0bc8c2cd27ddef33e892e535a021d6.pdf
[Accessed on 06 September, 2019]
Kasar, M., Dhaygude, R., Godse, S., and Gurgule, S. (2016). Automatic LPG gas booking
and detection system. International journal of advanced research in electrical and
electronics, 5(3). Available at:
https://www.ijareeie.com/upload/2016/march/8_Comparative.pdf [Accessed on 06
September, 2019]
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Kumar, G., and Bansal, A. (2010). Project monitoring and control. National conference on
role and application of ICT in accessible areas. Available at:
https://www.researchgate.net/publication/260952275_Project_Monitoring_and_Control_PM
C [Accessed on 06 September, 2019]
Naranayan, N., Xavier, N., Prasad, S., George, R. (2015). Smart LPG Booking system and
leakage detection. Ebook [Online]. Available at:
https://www.ijareeie.com/upload/2017/march/118_MBITS_ECE7.PDF [Accessed on 06
September, 2019]
Ryan, M., and Efatmaneshnik, M. (2015). Fundamentals of system complexity measures.
Ebook [Online]. Available at:
https://www.researchgate.net/publication/274663152_Fundamentals_of_System_Complexity
_Measures [Accessed on 06 September, 2019]
Sulaman, S., Weyns, K., and Host, M. (2013). A review of research on risks analysis methods
for IT system. Ebook [Online]. Available at:
https://www.researchgate.net/publication/235330202_A_Review_of_Research_on_Risk_Ana
lysis_Methods_for_IT_Systems [Accessed on 06 September, 2019]
Yang, G., and Gao, H. (2016). Uncertain risk assessment of knowledge management: Based
on set pair analysis. Ebook [Online]. Available at:
http://downloads.hindawi.com/journals/sp/2016/2025892.pdf [Accessed on 06 September,
2019]
role and application of ICT in accessible areas. Available at:
https://www.researchgate.net/publication/260952275_Project_Monitoring_and_Control_PM
C [Accessed on 06 September, 2019]
Naranayan, N., Xavier, N., Prasad, S., George, R. (2015). Smart LPG Booking system and
leakage detection. Ebook [Online]. Available at:
https://www.ijareeie.com/upload/2017/march/118_MBITS_ECE7.PDF [Accessed on 06
September, 2019]
Ryan, M., and Efatmaneshnik, M. (2015). Fundamentals of system complexity measures.
Ebook [Online]. Available at:
https://www.researchgate.net/publication/274663152_Fundamentals_of_System_Complexity
_Measures [Accessed on 06 September, 2019]
Sulaman, S., Weyns, K., and Host, M. (2013). A review of research on risks analysis methods
for IT system. Ebook [Online]. Available at:
https://www.researchgate.net/publication/235330202_A_Review_of_Research_on_Risk_Ana
lysis_Methods_for_IT_Systems [Accessed on 06 September, 2019]
Yang, G., and Gao, H. (2016). Uncertain risk assessment of knowledge management: Based
on set pair analysis. Ebook [Online]. Available at:
http://downloads.hindawi.com/journals/sp/2016/2025892.pdf [Accessed on 06 September,
2019]
1 out of 23
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.