This report analyzes project constraints, communications, responsibility matrix, risk management planning and project perquisites for SNHU EnergyInc. network implementation project. It includes stakeholder analysis, communication matrix, risk analysis matrix, time scheduling, project signoff letter, project review and recommendations.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Running head: PROJECT MANAGEMENT
Project management
(SNHU EnegryInc.)
Name of the student:
Name of the university:
Author Note
Project management
(SNHU EnegryInc.)
Name of the student:
Name of the university:
Author Note
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
1PROJECT MANAGEMENT
Executive summary
The Southern New Hampshire University is a private university at United States. Here, a project
planning is demonstrated in the basis of entire parameters of the university’s projects. The study
analyzes project constraints, communications, responsibility matrix, risk management planning and
project perquisites.
Executive summary
The Southern New Hampshire University is a private university at United States. Here, a project
planning is demonstrated in the basis of entire parameters of the university’s projects. The study
analyzes project constraints, communications, responsibility matrix, risk management planning and
project perquisites.
2PROJECT MANAGEMENT
Table of Contents
1. Introduction:......................................................................................................................................3
2. Project constraints and project requirements:....................................................................................3
2.1. Project scopes:............................................................................................................................3
2.2. Work Breakdown Structure:.......................................................................................................4
3. Understanding the response to various tasks:....................................................................................9
3.1. Stakeholder analysis:..................................................................................................................9
3.2. Communication Matrix:............................................................................................................10
3.3. Risk analysis matrix:.................................................................................................................10
3.4. Time scheduling:......................................................................................................................12
4. Project deployments:.......................................................................................................................15
5. Project signoff, project review and recommendations:...................................................................15
5.1. Project signoff letter:................................................................................................................15
5.2. Project review:..........................................................................................................................16
5.3. Recommendations:...................................................................................................................16
6. References:......................................................................................................................................18
Table of Contents
1. Introduction:......................................................................................................................................3
2. Project constraints and project requirements:....................................................................................3
2.1. Project scopes:............................................................................................................................3
2.2. Work Breakdown Structure:.......................................................................................................4
3. Understanding the response to various tasks:....................................................................................9
3.1. Stakeholder analysis:..................................................................................................................9
3.2. Communication Matrix:............................................................................................................10
3.3. Risk analysis matrix:.................................................................................................................10
3.4. Time scheduling:......................................................................................................................12
4. Project deployments:.......................................................................................................................15
5. Project signoff, project review and recommendations:...................................................................15
5.1. Project signoff letter:................................................................................................................15
5.2. Project review:..........................................................................................................................16
5.3. Recommendations:...................................................................................................................16
6. References:......................................................................................................................................18
3PROJECT MANAGEMENT
1. Introduction:
SNHU or “Southern New Hampshire University” is a nonsectarian, coeducational, nonprofit
and private university at United States. It has been best known for its various online initiates. This
has made it one of the fastest-growing universities of the nation.
The study intends to develop a project planning document on the basis of overall parameters
of the projects. Here the networking area of the university is chosen. Moreover, it is helpful to
establish the proper project managements and quality environments needed to finish the SNHU
project.
The following report has included project constraints, project requirements, communications,
project stakeholders, responsibility matrix and risk management plans.
2. Project constraints and project requirements:
2.1. Project scopes:
At SNHU the network services are to be provided. This must be done through an open source
system. A computer vulnerability program of inspection should be deployed on various wired data
jacks at various sectors of the campus including the grand library of the University. However, before
the end users can link to the network through any computer, this should be registered to an ID
(Pathan, 2016). Then it must pass to the endpoint checking to be permitted in the network. It must be
reminded that the networks that never have the operations like network, security and services react to
acceptable usage violations and operational incidents through disabling the wired ports under the
scenario of wireless clients.
1. Introduction:
SNHU or “Southern New Hampshire University” is a nonsectarian, coeducational, nonprofit
and private university at United States. It has been best known for its various online initiates. This
has made it one of the fastest-growing universities of the nation.
The study intends to develop a project planning document on the basis of overall parameters
of the projects. Here the networking area of the university is chosen. Moreover, it is helpful to
establish the proper project managements and quality environments needed to finish the SNHU
project.
The following report has included project constraints, project requirements, communications,
project stakeholders, responsibility matrix and risk management plans.
2. Project constraints and project requirements:
2.1. Project scopes:
At SNHU the network services are to be provided. This must be done through an open source
system. A computer vulnerability program of inspection should be deployed on various wired data
jacks at various sectors of the campus including the grand library of the University. However, before
the end users can link to the network through any computer, this should be registered to an ID
(Pathan, 2016). Then it must pass to the endpoint checking to be permitted in the network. It must be
reminded that the networks that never have the operations like network, security and services react to
acceptable usage violations and operational incidents through disabling the wired ports under the
scenario of wireless clients.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
4PROJECT MANAGEMENT
The present network implementation at SNHU University can never be expended to
encompass the extra wired ports neither over the campus nor to wireless network of the campus
preventing NUIT from identifying latest mobile device technologies.
Further, the scope of the project includes the replacing of life technology under Network
Access Control solutions over the campus networks. This supports centralized out-solution-of-band
architecture which scalable in nature (Loo, Mauri & Ortiz, 2016). This must also have high-
availability. It has been improving he customer service through delivering clear instructions
regarding self-remediation of various hosts from end-users. Moreover, it has been supporting
administrative quarantine of hosts for various security complaints.
2.2. Work Breakdown Structure:
Extensive research on this project has been helpful in positioning the security issues and
network architectures within the campus network of SNHU University. The first step includes the
deployment of network architecture within the campus networks. Then the security issues within the
campus network are to be found (White, Fisch & Pooch, 2017). Next the cost effective secure
campus network is to be implemented. This comprises of various steps. They are creating VLANs or
Virtual LANs for securities, implementing firewall for external and internal securities, implementing
virtual private networks or VPNs for branch campus.
The present network implementation at SNHU University can never be expended to
encompass the extra wired ports neither over the campus nor to wireless network of the campus
preventing NUIT from identifying latest mobile device technologies.
Further, the scope of the project includes the replacing of life technology under Network
Access Control solutions over the campus networks. This supports centralized out-solution-of-band
architecture which scalable in nature (Loo, Mauri & Ortiz, 2016). This must also have high-
availability. It has been improving he customer service through delivering clear instructions
regarding self-remediation of various hosts from end-users. Moreover, it has been supporting
administrative quarantine of hosts for various security complaints.
2.2. Work Breakdown Structure:
Extensive research on this project has been helpful in positioning the security issues and
network architectures within the campus network of SNHU University. The first step includes the
deployment of network architecture within the campus networks. Then the security issues within the
campus network are to be found (White, Fisch & Pooch, 2017). Next the cost effective secure
campus network is to be implemented. This comprises of various steps. They are creating VLANs or
Virtual LANs for securities, implementing firewall for external and internal securities, implementing
virtual private networks or VPNs for branch campus.
5PROJECT MANAGEMENT
Apart from this different estimations are demonstrated below.
Time estimation The estimation of time has included assumptions where uncertainties
have existed in the values. Here, the time estimations has been actual
estimated of various parameters of statistical distributions. At many
cases, the various uncertainties inherent to the activities must be high.
Moreover, it has included different uncertainties in various ways. This
must lead to the usage of stochastic networks (Kahler, 2015).
Cost estimation The budget of the current project is fiscal and program document. It reflects
the costs needed to do various activities of the project. Here, the budget is
determined the dollar expression of the project proposed and is intended to
be reasonable. This is tied to the work plan and objectives of the projects.
Further, the budget must not be created till the plans, priorities and policies
of SNHU University get established. Instead of various goals stated clearly
and aims, here the economic projections are unable to be made (Kizza,
2017). This must be substituted through the budgeting planning. Budget
approval should be denoted as the commitment from the part of the
governing body and administrations to conduct policies, respect priorities
and support plans that are been translated to dollars around the budget. The
budgeting is the process through which SNHU University can translate the
objectives and goals of projects to needed resources for accomplishing
objectives and goals. However, budgeting can never be regarded as the hit-
or-miss method. Instead, it has been involving various considerations and
several factors. SNHU University must use computer-aided tolls regarding
cost controlling and cost estimations. This is done prior the construction
Apart from this different estimations are demonstrated below.
Time estimation The estimation of time has included assumptions where uncertainties
have existed in the values. Here, the time estimations has been actual
estimated of various parameters of statistical distributions. At many
cases, the various uncertainties inherent to the activities must be high.
Moreover, it has included different uncertainties in various ways. This
must lead to the usage of stochastic networks (Kahler, 2015).
Cost estimation The budget of the current project is fiscal and program document. It reflects
the costs needed to do various activities of the project. Here, the budget is
determined the dollar expression of the project proposed and is intended to
be reasonable. This is tied to the work plan and objectives of the projects.
Further, the budget must not be created till the plans, priorities and policies
of SNHU University get established. Instead of various goals stated clearly
and aims, here the economic projections are unable to be made (Kizza,
2017). This must be substituted through the budgeting planning. Budget
approval should be denoted as the commitment from the part of the
governing body and administrations to conduct policies, respect priorities
and support plans that are been translated to dollars around the budget. The
budgeting is the process through which SNHU University can translate the
objectives and goals of projects to needed resources for accomplishing
objectives and goals. However, budgeting can never be regarded as the hit-
or-miss method. Instead, it has been involving various considerations and
several factors. SNHU University must use computer-aided tolls regarding
cost controlling and cost estimations. This is done prior the construction
6PROJECT MANAGEMENT
starts. Here, the controlling of costs must be different from the university
that develops the cost estimations. Further different software have been
available regarding cost control and cost estimation, the project must design
a system that must incorporate cost control processes and cost estimations
(Yang et al., 2015). This kind of integrations has been enabling transfer of
cost estimation data in automatic manner to various cost control methods.
Thus, the complete integration about the project’s cost status can be
accessed at any point of time. SAD or System Analysis and Design
approaches are used through relational database management systems that
are utilized for developing the model of integrations. SNHU University
requires finding out the kinds of cost elements, equipments, materials and
labors that are need to do the cost for every elements. While performing
planning of the budgets, various queries are to be answered. First of all the
staff time is needed to finish the projects. Then the consultants needed for
the current projects are needed to be determined. Next, the travels needed to
undertake every activity is to be done. Next the supplies required to be done
by the project is to be done (Ahson & Ilyas, 2017). Various costs to be
incurred to finish the project activities are to be determined. As the
resources needed to conduct the present project is found out, nest the
collecting and researching the cost estimations of the resources are to be
determined. Here effective documentation is vital to keep the process under
flow. This is needed while penning down the justification of the budget.
Here, many of them are involved within the project. However, the
requirements and formats of the budget have been differing among various
starts. Here, the controlling of costs must be different from the university
that develops the cost estimations. Further different software have been
available regarding cost control and cost estimation, the project must design
a system that must incorporate cost control processes and cost estimations
(Yang et al., 2015). This kind of integrations has been enabling transfer of
cost estimation data in automatic manner to various cost control methods.
Thus, the complete integration about the project’s cost status can be
accessed at any point of time. SAD or System Analysis and Design
approaches are used through relational database management systems that
are utilized for developing the model of integrations. SNHU University
requires finding out the kinds of cost elements, equipments, materials and
labors that are need to do the cost for every elements. While performing
planning of the budgets, various queries are to be answered. First of all the
staff time is needed to finish the projects. Then the consultants needed for
the current projects are needed to be determined. Next, the travels needed to
undertake every activity is to be done. Next the supplies required to be done
by the project is to be done (Ahson & Ilyas, 2017). Various costs to be
incurred to finish the project activities are to be determined. As the
resources needed to conduct the present project is found out, nest the
collecting and researching the cost estimations of the resources are to be
determined. Here effective documentation is vital to keep the process under
flow. This is needed while penning down the justification of the budget.
Here, many of them are involved within the project. However, the
requirements and formats of the budget have been differing among various
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
7PROJECT MANAGEMENT
agencies of findings. There are various standards for developing the federal
budgets (Ren et al., 2015). Besides there are various indirect costs that is
incurred by SNHU University for various joint or common aims that must
not be specifically or readily determined with any specific grant project or
additional institutional activities. As the indirect expenses are charged,
SNHU University should be providing a copy of the present negotiated
indirect expense rate agreements from cognizant agencies. This present
copy is been defined as the one encompassing the project period or a
specific element of the project period (Knapp & Langill, 2014). Thus, a new
indirect cost rate agreement is needed as one submitted with grants exceeds
the deadline as the project moves on. Moreover, the finance department of
the organization is able to provide data regarding how the rate can be
applied and the costs that are paid with indirect funds. Moreover, the budget
is the economic expression of the working scope of the SNHU University’s
network implementation project. It has been vital that every cost is related
to various tasks needed to meet those project objectives.
Quality estimation In the current project one of the vital factors to find out the expenditure has
been the quality of services that are provided. Here, various methods
utilized to deliver the service are to be provided (Kitsos, 2016). Thus,
instead of basing that budget over the previous expenditures, SNHU
University must look at different alternative paths to provide services that
should be the element of the process of budgeting.
Role of stakeholders The stakeholders have been strongly influencing success of projects.
Hence, understanding their roles is vital for project implementations and
agencies of findings. There are various standards for developing the federal
budgets (Ren et al., 2015). Besides there are various indirect costs that is
incurred by SNHU University for various joint or common aims that must
not be specifically or readily determined with any specific grant project or
additional institutional activities. As the indirect expenses are charged,
SNHU University should be providing a copy of the present negotiated
indirect expense rate agreements from cognizant agencies. This present
copy is been defined as the one encompassing the project period or a
specific element of the project period (Knapp & Langill, 2014). Thus, a new
indirect cost rate agreement is needed as one submitted with grants exceeds
the deadline as the project moves on. Moreover, the finance department of
the organization is able to provide data regarding how the rate can be
applied and the costs that are paid with indirect funds. Moreover, the budget
is the economic expression of the working scope of the SNHU University’s
network implementation project. It has been vital that every cost is related
to various tasks needed to meet those project objectives.
Quality estimation In the current project one of the vital factors to find out the expenditure has
been the quality of services that are provided. Here, various methods
utilized to deliver the service are to be provided (Kitsos, 2016). Thus,
instead of basing that budget over the previous expenditures, SNHU
University must look at different alternative paths to provide services that
should be the element of the process of budgeting.
Role of stakeholders The stakeholders have been strongly influencing success of projects.
Hence, understanding their roles is vital for project implementations and
8PROJECT MANAGEMENT
managements. It is the green retrofit projects and is more complex than new
projects.
Functional
requirements
In the current project the network must send emails as any particular
condition is met.
Non functional
requirement
The e-mails must be sent with latency having more than 12 hours from
those activities.
managements. It is the green retrofit projects and is more complex than new
projects.
Functional
requirements
In the current project the network must send emails as any particular
condition is met.
Non functional
requirement
The e-mails must be sent with latency having more than 12 hours from
those activities.
9PROJECT MANAGEMENT
3. Understanding the response to various tasks:
3.1. Stakeholder analysis:
Figure 1: Stakeholder Analysis at Southern New Hampshire University
(Source: Created by Author)
3. Understanding the response to various tasks:
3.1. Stakeholder analysis:
Figure 1: Stakeholder Analysis at Southern New Hampshire University
(Source: Created by Author)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
10PROJECT MANAGEMENT
Species:
Matrix of species
composition
Environmental
variables:
Matrix of
environmental variables
Special Traits:
Matrix of species traits
3.2. Communication Matrix:
Figure 2: “Communication Matrix for Southern New Hampshire University”
(Source: Created by Author)
3.3. Risk analysis matrix:
Network component Description Risk level
ATM switches Central network
device
High
Network routers Distribution network
devices
High
Firewall Access network High
Species:
Matrix of species
composition
Environmental
variables:
Matrix of
environmental variables
Special Traits:
Matrix of species traits
3.2. Communication Matrix:
Figure 2: “Communication Matrix for Southern New Hampshire University”
(Source: Created by Author)
3.3. Risk analysis matrix:
Network component Description Risk level
ATM switches Central network
device
High
Network routers Distribution network
devices
High
Firewall Access network High
11PROJECT MANAGEMENT
device
ISDN or dial-up
servers
Access network
devices
Medium
Closet switches Access network
devices
Medium
device
ISDN or dial-up
servers
Access network
devices
Medium
Closet switches Access network
devices
Medium
12PROJECT MANAGEMENT
3.4. Time scheduling:
Task Name Duratio
n
Start Finish Predecessors
Implementing network architectures at
Southern New Hampshire University
Campus
103 days Wed
5/16/18
Sun
10/7/18
Security Issues at the campus network 92 days Mon
10/8/18
Fri
2/15/19
1
Mitigating the known attacks 2 days Mon
2/18/19
Tue
2/19/19
2
Implementing cost effective secure
campus network design
192 days Wed
2/20/19
Fri
11/22/19
3
Implementing firewall for external and
internal security
110 days Mon
11/25/19
Fri
4/24/20
4
Deploying Virtual Private Network: Use
for branch campus
100 days Mon
4/27/20
Fri
9/11/20
5
3.4. Time scheduling:
Task Name Duratio
n
Start Finish Predecessors
Implementing network architectures at
Southern New Hampshire University
Campus
103 days Wed
5/16/18
Sun
10/7/18
Security Issues at the campus network 92 days Mon
10/8/18
Fri
2/15/19
1
Mitigating the known attacks 2 days Mon
2/18/19
Tue
2/19/19
2
Implementing cost effective secure
campus network design
192 days Wed
2/20/19
Fri
11/22/19
3
Implementing firewall for external and
internal security
110 days Mon
11/25/19
Fri
4/24/20
4
Deploying Virtual Private Network: Use
for branch campus
100 days Mon
4/27/20
Fri
9/11/20
5
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
13PROJECT MANAGEMENT
Figure 3: “Gantt Chart for time scheduling of Network Infrastructure at Southern New
Hampshire University”
(Source: Created by Author)
Figure 3: “Gantt Chart for time scheduling of Network Infrastructure at Southern New
Hampshire University”
(Source: Created by Author)
14PROJECT MANAGEMENT
Figure 4: “Network Diagram for Southern New Hampshire University”
(Source: Created by Author)
Figure 4: “Network Diagram for Southern New Hampshire University”
(Source: Created by Author)
15PROJECT MANAGEMENT
4. Project deployments:
Securing the huge network is a challenge if IT managers. There are lots of similarities
between securing outsides networks and universities. However, there have been improvements of
challenges and issues. SNHU University has been paying more attentions towards improving
learning experiences of students (Guo et al., 2014). Here, the architects of the campus have been able
to achieve this as the IT managers are able to hold on basic principles that are addressed in the
system architecture. This network infrastructure design is a vital part of various IT organizations
currently. A vital consideration for network design has been creating efficiency to support future
expansion in secured, scalable and reliable way. This needs the network designers to define the
unique situations of clients, especially in data architecture, application and technology.
5. Project signoff, project review and recommendations:
5.1. Project signoff letter:
This letter certifies that all the delivers under the project (Southern New Hampshire
University) is delivered. This is done according to the agreement. Here, interim approvals for the
deliverables are signed on ______________. This has been serving as the affirmation that the final
and latest deliverables under this project agreement is conveyed.
[Signature]
______________________ (Signature of Customer)
4. Project deployments:
Securing the huge network is a challenge if IT managers. There are lots of similarities
between securing outsides networks and universities. However, there have been improvements of
challenges and issues. SNHU University has been paying more attentions towards improving
learning experiences of students (Guo et al., 2014). Here, the architects of the campus have been able
to achieve this as the IT managers are able to hold on basic principles that are addressed in the
system architecture. This network infrastructure design is a vital part of various IT organizations
currently. A vital consideration for network design has been creating efficiency to support future
expansion in secured, scalable and reliable way. This needs the network designers to define the
unique situations of clients, especially in data architecture, application and technology.
5. Project signoff, project review and recommendations:
5.1. Project signoff letter:
This letter certifies that all the delivers under the project (Southern New Hampshire
University) is delivered. This is done according to the agreement. Here, interim approvals for the
deliverables are signed on ______________. This has been serving as the affirmation that the final
and latest deliverables under this project agreement is conveyed.
[Signature]
______________________ (Signature of Customer)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
16PROJECT MANAGEMENT
Date___________________
5.2. Project review:
The security is an important problem to deploy and design the network of SNHU network.
The project has shown that the network architecture and security has been vital here. As any
hierarchical network is followed, the network would become scalable and the security would rise.
This is easy to maintain and the project has demonstrated a compact cost-effective secured campus
worked design on the working environment. It has also needed security, scalability and various other
aspects. The campus network has been facing challenges in addressing core issues of security that is
governed through network architectures. The secured network has been protecting institutions from
various security attacks related to the network. The proposed network infrastructure has been reliable
with the adaptable infrastructure. It has also analyzed the review of the effective practices to mitigate
the best known attacks and various recommendations regarding how to secure attacks in occurring
again.
5.3. Recommendations:
Southern New Hampshire University has been assuring the technical abilities suited for
network applications included to the networks deployed within initiative to Internet.
Supplying strategic leaderships for Inter-related programs under the university and agencies
that have been coordinating with the federal agencies.
Developing organizational structure assuring the issues with network technology is
determined and addressed effectively and promptly.
Exploring cross-cutting problems.
Convening private and public bodies in examining and identifying problems related to
healthcare and Internet.
Date___________________
5.2. Project review:
The security is an important problem to deploy and design the network of SNHU network.
The project has shown that the network architecture and security has been vital here. As any
hierarchical network is followed, the network would become scalable and the security would rise.
This is easy to maintain and the project has demonstrated a compact cost-effective secured campus
worked design on the working environment. It has also needed security, scalability and various other
aspects. The campus network has been facing challenges in addressing core issues of security that is
governed through network architectures. The secured network has been protecting institutions from
various security attacks related to the network. The proposed network infrastructure has been reliable
with the adaptable infrastructure. It has also analyzed the review of the effective practices to mitigate
the best known attacks and various recommendations regarding how to secure attacks in occurring
again.
5.3. Recommendations:
Southern New Hampshire University has been assuring the technical abilities suited for
network applications included to the networks deployed within initiative to Internet.
Supplying strategic leaderships for Inter-related programs under the university and agencies
that have been coordinating with the federal agencies.
Developing organizational structure assuring the issues with network technology is
determined and addressed effectively and promptly.
Exploring cross-cutting problems.
Convening private and public bodies in examining and identifying problems related to
healthcare and Internet.
17PROJECT MANAGEMENT
Improving audit capabilities where additional tasks are required to create tools for reviewing
various logs of audits. The tools must automatically recognize potential violations of
confidentialities. They must draw external databases like referrals and scheduling calendars
for differentiating between illegitimate and legitimate access.
Improving audit capabilities where additional tasks are required to create tools for reviewing
various logs of audits. The tools must automatically recognize potential violations of
confidentialities. They must draw external databases like referrals and scheduling calendars
for differentiating between illegitimate and legitimate access.
18PROJECT MANAGEMENT
6. References:
Ahson, S. A., & Ilyas, M. (2017). RFID handbook: applications, technology, security, and privacy.
CRC press.
Almorsy, M., Grundy, J., & Müller, I. (2016). An analysis of the cloud computing security
problem. arXiv preprint arXiv:1609.01107.
Borgohain, T., Kumar, U., & Sanyal, S. (2015). Survey of security and privacy issues of Internet of
Things. arXiv preprint arXiv:1501.02211.
Guo, P., Wang, J., Geng, X. H., Kim, C. S., & Kim, J. U. (2014). A variable threshold-value
authentication architecture for wireless mesh networks. 網網網網網網網網, 15(6), 929-935.
Kahler, M. (Ed.). (2015). Networked politics: agency, power, and governance. Cornell University
Press.
Kitsos, P. (Ed.). (2016). Security in RFID and sensor networks. CRC Press.
Kizza, J. M. (2017). Guide to computer network security. Springer.
Knapp, E. D., & Langill, J. T. (2014). Industrial Network Security: Securing critical infrastructure
networks for smart grid, SCADA, and other Industrial Control Systems. Syngress.
Loo, J., Mauri, J. L., & Ortiz, J. H. (Eds.). (2016). Mobile ad hoc networks: current status and future
trends. CRC Press.
Pathan, A. S. K. (Ed.). (2016). Security of self-organizing networks: MANET, WSN, WMN,
VANET. CRC press.
6. References:
Ahson, S. A., & Ilyas, M. (2017). RFID handbook: applications, technology, security, and privacy.
CRC press.
Almorsy, M., Grundy, J., & Müller, I. (2016). An analysis of the cloud computing security
problem. arXiv preprint arXiv:1609.01107.
Borgohain, T., Kumar, U., & Sanyal, S. (2015). Survey of security and privacy issues of Internet of
Things. arXiv preprint arXiv:1501.02211.
Guo, P., Wang, J., Geng, X. H., Kim, C. S., & Kim, J. U. (2014). A variable threshold-value
authentication architecture for wireless mesh networks. 網網網網網網網網, 15(6), 929-935.
Kahler, M. (Ed.). (2015). Networked politics: agency, power, and governance. Cornell University
Press.
Kitsos, P. (Ed.). (2016). Security in RFID and sensor networks. CRC Press.
Kizza, J. M. (2017). Guide to computer network security. Springer.
Knapp, E. D., & Langill, J. T. (2014). Industrial Network Security: Securing critical infrastructure
networks for smart grid, SCADA, and other Industrial Control Systems. Syngress.
Loo, J., Mauri, J. L., & Ortiz, J. H. (Eds.). (2016). Mobile ad hoc networks: current status and future
trends. CRC Press.
Pathan, A. S. K. (Ed.). (2016). Security of self-organizing networks: MANET, WSN, WMN,
VANET. CRC press.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
19PROJECT MANAGEMENT
Ren, Y. J., Shen, J., Wang, J., Han, J., & Lee, S. Y. (2015). Mutual verifiable provable data auditing
in public cloud storage. 網網網網網網網網, 16(2), 317-323.
Sandberg, H., Amin, S., & Johansson, K. H. (2015). Cyberphysical security in networked control
systems: An introduction to the issue. IEEE Control Systems, 35(1), 20-23.
Sicari, S., Rizzardi, A., Grieco, L. A., & Coen-Porisini, A. (2015). Security, privacy and trust in
Internet of Things: The road ahead. Computer networks, 76, 146-164.
White, G. B., Fisch, E. A., & Pooch, U. W. (2017). Computer system and network security. CRC
press.
Yang, N., Wang, L., Geraci, G., Elkashlan, M., Yuan, J., & Di Renzo, M. (2015). Safeguarding 5G
wireless communication networks using physical layer security. IEEE Communications
Magazine, 53(4), 20-27.
Yuan, C., Sun, X., & Lv, R. (2016). Fingerprint liveness detection based on multi-scale LPQ and
PCA. China Communications, 13(7), 60-65.
Zhang, Y., Zheng, J., & Chen, H. H. (Eds.). (2016). Cognitive radio networks: architectures,
protocols, and standards. CRC press.
Zhao, N., Yu, F. R., Li, M., Yan, Q., & Leung, V. C. (2016). Physical layer security issues in
interference-alignment-based wireless networks. IEEE Communications Magazine, 54(8),
162-168.
Ren, Y. J., Shen, J., Wang, J., Han, J., & Lee, S. Y. (2015). Mutual verifiable provable data auditing
in public cloud storage. 網網網網網網網網, 16(2), 317-323.
Sandberg, H., Amin, S., & Johansson, K. H. (2015). Cyberphysical security in networked control
systems: An introduction to the issue. IEEE Control Systems, 35(1), 20-23.
Sicari, S., Rizzardi, A., Grieco, L. A., & Coen-Porisini, A. (2015). Security, privacy and trust in
Internet of Things: The road ahead. Computer networks, 76, 146-164.
White, G. B., Fisch, E. A., & Pooch, U. W. (2017). Computer system and network security. CRC
press.
Yang, N., Wang, L., Geraci, G., Elkashlan, M., Yuan, J., & Di Renzo, M. (2015). Safeguarding 5G
wireless communication networks using physical layer security. IEEE Communications
Magazine, 53(4), 20-27.
Yuan, C., Sun, X., & Lv, R. (2016). Fingerprint liveness detection based on multi-scale LPQ and
PCA. China Communications, 13(7), 60-65.
Zhang, Y., Zheng, J., & Chen, H. H. (Eds.). (2016). Cognitive radio networks: architectures,
protocols, and standards. CRC press.
Zhao, N., Yu, F. R., Li, M., Yan, Q., & Leung, V. C. (2016). Physical layer security issues in
interference-alignment-based wireless networks. IEEE Communications Magazine, 54(8),
162-168.
1 out of 20
Related Documents
Your All-in-One AI-Powered Toolkit for Academic Success.
+13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024 | Zucol Services PVT LTD | All rights reserved.