Software Testing for Project Management System

Verified

Added on  2023/05/30

|10
|642
|220
AI Summary
This article describes the items to be tested and not tested for a project management software, along with a chart for software testing. It covers system features, external interface requirements, and other non-functional requirements.
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT MANAGEMENT
PROJECT MANAGEMENT
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1
PROJECT MANAGEMENT
1.2. DESCRIBE ALSO ITEMS TO BE TESTED / NOT TESTED BOTH
Items that will be tested are:
1. System Features and Functional Requirements
ï‚· Functional Requirements
2. External Interface Requirements
3. Other Non-functional Requirements
ï‚· Performance requirements
ï‚· Safety & Security requirement
Items that will not be tested are:
As each of the features are important to evaluate the software in terms of it applicability
as an effective project management software, all the requirements have been considered
for the testing.
1.3. CHART FOR THE SOFTWARE TESTING:
Here the testing is divided into 3 different test category which will evaluate
different features in each category:
Category 1: System Features and Functional Requirements
Item to Test Test
Description
Test
Date
Responsibilit
y
System
login
Here things that
will be
evaluated are
2/12/201
8
System
designer
Document Page
2
PROJECT MANAGEMENT
ease of login
and level of
authentication
needed of
Project
creation
How easily new
projects are
created with the
software
3/12/201
8
System
designer
Project
collaboratio
n
How effectively
the features like
team
organizations,
communication
, project
synchronization
is working
4/12/201
8
System
designer
Project
planning
Here features
like stakeholder
identifications,
stakeholders
meeting and
goal
prioritization
5/12/201
8
Team leader
and manager
Document Page
3
PROJECT MANAGEMENT
will be tested
Resource
planning
Features like
resource view,
cost planning
for resource will
be tested to
identify the
effectiveness as
well as issues
with the features
6/12/201
8
Team leader
and manager
Project
tracking
Features mile
stone creation,
milestone
tracking and
Earned Value
Analysis will be
tested to
identify scope
of improvement
Team leader
and manager
Project
reporting
Here the thing
that will be
tested is how
effectively the
software helps
8/12/201
8
Team leader
and manager
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4
PROJECT MANAGEMENT
in project
reporting with
assistance in
creating report
like Project
status report and
Board/Executiv
e Reports
Category 2: External Interface Requirements
Item to Test Test
Description
Test Date Responsibility
External
Interface
Requirements
How well the
system
performs
across
different
platforms like
windows,
MAC OS
9/12/2018 User interface
designer
Document Page
5
PROJECT MANAGEMENT
android,
Chrome OS
Category 3: Other Non-functional Requirements
Item to Test Test
Description
Test Date Responsibility
Performance
requirements
1. Here it has
been tested if
the system
support 2500
users at a
time as this
is the
requirement
for the
software
2. What is the
time taken
by the
system to
process an
information?
Ideal and
preferred
time is 0.5
10/12/2018 System
architect
Document Page
6
PROJECT MANAGEMENT
sec
3. How easily
system create
a report as
soon as the
task is
executed by
the customer
4. How
effective the
notification
system
works when
any
information
is saved by
the system
Safety &
Security
requirement
What is the
level of
security and
how well
traffic is
encrypted with
11/12/2018 System
architect
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7
PROJECT MANAGEMENT
HTTP
Test summary chart:
Test id Test objective Things need further evaluation
TC_MI_01 Evaluation of
System
Features and
Functional
Requirements
Things that was as per the
requirement was project
collaboration, project creation,
project planning. However
improvement is required in system
login in terms of security.
Improvement is also needed in
project tracking and reporting in
terms of speed and complexity.
TC_MI_02 Evaluation of
External
Interface
Requirements
Performance is effective on
windows OS, and MAC OS in
terms of ram management but the
software need optimization on
Chrome OS
TC_MI_03 Evaluation of
Performance
requirements
Performed well during testing as
the preferred requirements were
met properly
TC_MI_04 Evaluation of
Safety &
Authentication is not that effective
as the system has issues in terms
Document Page
8
PROJECT MANAGEMENT
Security
requirement
of integrating HTTP for
encryption.
Document Page
9
PROJECT MANAGEMENT
chevron_up_icon
1 out of 10
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]