CW1 Project
Management
Transport for London
1
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Executive summary
It is highlighted within given report is that project management is playing most important
part within an organisational in order to achieve their project objective and goals. It is refer to the
concept that helps in using a particular knowledge and tools and skills so that they could achieve
or accomplish the objectives and goals. Within this report, it is discussed that project
management tool such as agile technique and waterfall in order to achieve their goals. Also, the
stakeholder analysis is been disused and risk analysis and work break down structure.
2
Document Page
Table of Contents
Executive summary..........................................................................................................................2
Introduction......................................................................................................................................4
Task 1 ..............................................................................................................................................4
Project management methodologies ..........................................................................................4
Task 2 ..............................................................................................................................................5
Network diagram.........................................................................................................................5
Gantt chart...................................................................................................................................7
Task 3...............................................................................................................................................8
Stakeholder analysis....................................................................................................................8
Task 4 ..............................................................................................................................................9
Work break down structure ........................................................................................................9
Task 5 ..............................................................................................................................................9
Risk analysis ...............................................................................................................................9
Task 6 ............................................................................................................................................11
Conclusion ....................................................................................................................................11
References......................................................................................................................................12
Book and journals.....................................................................................................................12
3
Document Page
Introduction
Project managements is the process of using a particular knowledge tools and techniques
and skills that helps in delivering value to the individuals. It is refers to the process in which
team led is needed at a time of work processes in order to achieve their goals and objectives of
project. As it is seen that very project is different from each other and it requires different
activities and task in order to complete this project (Brunet, 2021). If a goal of project is
accomplished then it may results in reaching in a good conclusion. This report is explaining
project management of transport for London. It is also known as Transport for London Plc. This
port consist of operational working which has to be taken into consideration in order to make 800
new houses in Acton.
Task 1
Project management methodologies
For completing this goal of project, it is to focus on various project management
methodologies which helps in using by a company. There are two types of methodologies such
which is used by Tfl to accomplish their goals (Rihar, Žužek, and Kušar, 2021). These
methodologies are discussed below :
Waterfall technique : It is a traditional methodology that is used in project management.
In relation with waterfall techniques, there are some of the phases and techniques that are used in
sequenced manner. It is important for project in every stage to complete prior to the project when
next level begins. This steps are used by Transport London plc at a time of using waterfall
methodology. This methodology is having probability of mistakes while mapping out in the
beginning itself.
Agile technique : This is a another methodology used by Transport for London plc. This
technique is introduced at a time of dissatisfactions which arise from traditional method project.
This agile technology is collaborative, quick and it driven the data changes (Yi, and MacDonell,
2021). This project management is involving the smaller phases that helps in facilitating frequent
testing.
4
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Task 2
Network diagram
Network diagram is a concept of graphical representation of a projects which is
connected with the help of arrows and boxes so that it helps in describing several activities
involved in the project. The boxes within network diagram represents the description of several
activities and task used in the project. On the other hand, arrows is standing for relationship
among the activities of a project. This network diagram is mapping out in the structure of
network which is having symbols and lines which is regarded as the accurate way to share their
layout (Li, Luo, and Cao, 2021). This visual representation helps the audience in understanding
better the activities and connection with the items.
5
Document Page
It is analysed from the above diagram that best path for the completion of the project is
tends to achieve the organisational aims and objectives. Mangers of transport for London plc,
have a clear vision in accomplishment of the project goals and objectives. The short time in
which project can be completed is 1, 2, 4, 5, 9, 10, 21 and 22. the lowest time is 116 days.
6
Document Page
Gantt chart
7
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Task 3
Stakeholder analysis
The stakeholder analysis is refers to the process in which assessment of system ad
changes is done. In this information is useful for assessing the parties which are more interested
and which are not more interested (Jagtap, 2021). Systematic approach is a process of collecting
a qualitative information and determining the people who are interested in the organisation. This
consist of internal and external stakeholders.
Internal stakeholders are employees, owners, managers, It departments etc. on the other
hand external stakeholders are those who are living outside the business organisation. These are
customers, suppliers and event persons. The stakeholders analysis is consisting of four stages.
These are mentioned below :
High power low interest : The transport for London plc is is having some of the
stakeholders who are having high power and low interest. These are the managers and
8
Document Page
committee members and customers of the project who is not having that much interest in
the organisation task and activities performed (Mackintosh, 2021).
Low power and high interest: This is the next quadrants of stakeholders who posses less
power and having high interest in the business project. These are organisers, suppliers,
trainer etc.
High power and high interest : This is the next quadrant which used for Transport for
London plc. In this, there are some of the stakeholders who are having high interest and
high power within project functions these are Executive, owner and SME etc.
Low power and low interest: This is the last quadrant in which some of the people are
having lower powers and lower interest within project function of the company. These
stakeholders are help desk and system admin etc.
Task 4
Work break down structure
The work break down structure is a refers to the project management which delivers
oriented breakdown structure which helps in dividing the tasks into smaller segments
(McDermott, Antony, and Douglas, 2021). It helps in working with a team and managing all the
tasks and activities effectively. WBS of Transport for London plc is mentioned below :
Task 5
Risk analysis
This is refers to the concept in which potential issues and challenges are analysed in
relation with the negative impacts if they get from the project execution. This is like a
contingency plan which helps in mitigating risks and avoiding them that is being faced by
business of Transport for London plc (Neumann, Bogdanov, and Baumann, 2021). This is
discussed below :
9
Document Page
No. Risk Effect Possibility Mitigation
1 Happening of quality Low High There is a use of good quality of
machinery and technologies in
order to get high quality of work.
2 Alteration in weather High Moderate Estimation the expectation and
good preparation method.
3 Security and safety risk Low Moderate Vision of bolted place to work and
helps employees in being secure
4 Lower HR High High Use of effective HR practises
5 Technological change
risk
Low Moderate Research of market is done
6 Bad catering at worksite Moderate Low Catering is done for high quality
7 Coordination not done High Low New techniques of coordination is
used
8 Lack of space Low Moderate Resource allocation is done
9 Issues abstraction to
society
High Low Social objectives and goals are to
be completed
10 Self-esteem risks and
issues
High Low Providing fair working environment
in the operational firm.
11 Deficiency of parking
space
Low Low Parking facilities are provided at
ground floor
12 Failure of finance in
project
Low High Efficient budget is made
13 Project conflicts
between workers
Moderate High Effective supervision is done
14 Low moral among
employees
Moderate Low Morale will be increased through
providing motivation techniques
10
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
and rewards to employees
15 Government
powerfulness
Low Low Market research
16 Deficit of resources High Moderate Proper allocation of resource are
done
17 Worker safety and
security
High Low Also, the disaster management
training and development
programmes are provided.
18 Act of God Low Moderate -
19 Unproductive time
management
Low High Techniques of time management is
made
20 Market uncertainty Moderate Low Operational flexibility and market
research will be done.
Task 6
Particulars Expectations Acceptance Quality Controlling
Advertisement High Sales enhanced
by 20%
Usage of
technology
Training and
developing
Methodological
analysis
High Enhanced in the
productiveness by
8%.
Agile and
Waterfall
methodology are
used
Pursuing rule of
methodology
Risk
classification
High Productivity of
risk can be
enhanced by 4%.
Risk is register Effectual risk
management
method
Public
presentation
High Increasing in
turnover by 10%
WBS and Gantt
chart is used
Oversight
method.
11
Document Page
Conclusion
It is been concluded from the above task that project management is playing important
role in achieving of project aim and objectives. It helps in discussing various project
managements techniques such as agile technique and waterfall technique so to achieve
objectives. Further, stakeholder analysis is been discussed within this report which provides a
details about stakeholders who is having high interest and high power within project.
References
Book and journals
Brunet, M., 2021. Incheon Bridge, South Korea: the actualization of a landmark envisioned a
century ago. In Megaproject Leaders. Edward Elgar Publishing.
Buckley, B.M. and Berger, F.M., 2021. The trial site. In Innovation in Clinical Trial
Methodologies (pp. 113-120). Academic Press.
Jagtap, S., 2021. Frugal-IDeM: An Integrated Methodology for Designing Frugal Innovations in
Low-Resource Settings. In Design for Tomorrow—Volume 2 (pp. 41-51). Springer,
Singapore.
Li, D., Luo, Z. and Cao, B., 2021. Blockchain-based federated learning methodologies in smart
environments. Cluster Computing, pp.1-15.
Mackintosh, C., 2021. Introduction to qualitative research methodologies.
McDermott, O., Antony, J. and Douglas, J., 2021. Exploring the use of operational excellence
methodologies in the era of COVID-19: perspectives from leading academics and
practitioners. The TQM Journal.
Neumann, M., Bogdanov, Y., Lier, M. and Baumann, L., 2021, January. The Sars-Cov-2
pandemic and agile methodologies in software development: A multiple case study in
germany. In International Conference on Lean and Agile Software Development (pp.
40-58). Springer, Cham.
Rihar, L., Žužek, T. and Kušar, J., 2021. How to successfully introduce concurrent engineering
into new product development?. Concurrent Engineering, 29(2), pp.87-101.
Stock, G.N., Tsai, J.C.A., Jiang, J.J. and Klein, G., 2021. Coping with uncertainty: Knowledge
sharing in new product development projects. International Journal of Project
Management, 39(1), pp.59-70.
Yi, H.H.W. and MacDonell, S.G., 2021. Towards an Understanding of Why and How ICT
Projects Are Initiated: Analysis via Repertory Grid. arXiv preprint arXiv:2103.10570.
12
chevron_up_icon