This report document highlights the analysis of project firm's stakeholders, identification of risks and considerations of WBS, Gantt chart and network diagram for Transport for London project. It also recommends market research, digital technologies and participative decision making processes for effective project management.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management - Transport for London - Project Brief
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Executive Summary The scope, management, and overall success criteria of a project are all included in the project start document. This section contains fundamental project information such as scope, context, team, cooperation, and management. It is critical to oversee the completion of all project activities within the given time period for project management.
Introduction Project Management is an effective technique to mark better standards while working in a project industry. The provided techniques aids towards ensuring effective use of project resources and also ensures about better working environment in the organisational firm. In the given report document, operational working atTransport for London is being taken into consideration. In the following report document, analysis of project firm's stakeholders, identification of risks and considerations of WBS, Gantt chart and network diagram is being highlighted. Main Body Task 1 Methodologies Project methodology defines a critical path to convey progress of the project industry in the most concise and effective manner. Such methodologies are dedicated to derive maximum advantages or output from respective resources being invested in the project. In the given project i.e.Transport for London, undertake road projects to create safer, greener and more attractive streets, as well as improve the entire bus network across London. Key methodology which could be focused on are listed below;Agile: The given methodology is considered to be the best suited approach when being engaged in self-organised and cross-functional teams. In the given context, as Transport for London is taking considerations to develop streets and plan development by concerning greenery in region of London. Therefore, reflecting to social prospective of the firm in which organisation will be exposed to multi- cultural aspects the given methodology will be best suited. Waterfall: Another methodology which states about its effective operations towards promoting efficiency of work in manufacturing and construction industries. The given methodology focuses on continuous working in the project industry. In its evaluation if the worker
leaves in middle of the project task arrangements are being made to replace the individual considering effectiveness of work being produced remains same. Task 2 Gantt chart and network diagram
Task 3 Stakeholders analysis Stakeholders’ analysis is a critical component and first step in stakeholder management. It is a fundamental method that successful people use to gain support from others. Managing stakeholders plays a vital role in providing more information to projects, allowing them to fulfil tasks in a more thorough manner. Stakeholder management is utilised to create long-term initiatives and plays a vital part in achieving more effective results. With the identification of various requirements, it is critical to examine how all three processes are engaged among company management, resulting in the identification, prioritisation, and, finally, comprehension of stakeholders. Like a result, a greater number of people are involved in the company's process to finish work with important information in order to handle tasks effectively.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
High power and high interest: It has been shown that by including these personnel, management is able to perform their tasks with more efficiency. In basic terms, those who are at this stage in Transport for London are at the top of the food chain or in positions of leadership. The people who are mapped in this stage are the investors. This stage is used to keep a careful eye on all work.High power and low interest: Customers, in the eyes of Transport for London, are those persons who have the authority to decide on a project. However, because employees are less engaged in business operations, it is critical for organisations to maintain employee satisfaction. Transport for London also recognises that their message is rarely repeated since it has a lower effect. Individuals complete this stage by meeting the needs of stakeholders.Low power and high-interest: Approximately the majority of those involved in organisational tasks. To help Transport for London, the management has defined a wide category that may be used to handle tasks in a well-planned manner. With the involvement of all elements, project management takes on a new dimension. This is used by Transport for London management to make educated decisions. Low power and less interested: Since the low output and negative interest model is not successful and helpful for retention over a longer length of time, management linked to all those variables that are included in the Transport for London operations, functions, and management systems must be utilised to produce high-interest. As a result, there is a lot of rivalry in the retail business, which creates
problems. As a result, the last category of stakeholder model includes suppliers, transporters, and many others. They are just utilised to keep track of the operating functions.
Task 4 WBS Main activities Budget ApprovalMusicAdvertisingDevelop an Advertisement Plan Train Production Crew Performance Director Approval Department approval Hire Orchestra Manager’s concern Hire publicity Director Use of digital techniques Marketing tools Hire set designer Set designed and buit Cast rehersel Advertisement media Cocern of marketing manager Performanace management techniques Trainingand development
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Task 5 Risk assesment Risk CategoryLikeliho od of the risk occurrin g Risk proximitySeverit y Rating based on impact and likeliho od Owner Person who will manage the risk Mitigatin g action Action PlanProgress on action The campaign's goal isn't clear.MediumHighHighProject Sponsor The campaign should deliver and assure thatthe brand has a favourabl e Thepopularity ofacampaign canonlybe improvedifall typesof financialrisks are detected in a shortperiodof time. Innovative ideas are used in the campaign.
influence onthe market. Asa result, corporate organisati onsmay successful lyattain their aims and objectives . Theprojectdesignanddeliverable definition are both lacking. LowHighHighProject Sponsor The campaign' s scope is determine dby comprehe ndingthe concept behindit. Asa Document assumptions relatedtothe campaignand associatedrisk arehighand cannotbe includedinthe scopebecause theymay Campaigns must be able to demonstrateoriginalityin their work.
result, the campaign hasa greater impact. obstructthe campaign's progress. The timetable for the project is not well defined or understood. LowMediumMediumProject manager Campaign sshould be carried out according toaset timetable, resulting inthe developm entof business products insidea company. Tomakea campaignmore effective, forthcoming tasksmustbe accomplished, andthe organization's proceduremust be enhanced. Workshops scheduled No influence over the priorities of the employees MediumMediumMediumProject manager Campaign saidin the Informthe projectsponsor andenlistthe With more effective parts, a campaign allows for a more effective product launch.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
provision of sponsorsh ip,which allows groupsto promote. It leads to attracting clients within the given time frame. This makesit feasible to launcha product withina settime frame. assistanceofa backup resource. (DalPont,, 2020). Delayscausedbyconsultantsor contractors MediumHighHighProject manager Managers should be Creatingeye- catching banners Campaignsshouldbe handledproperly,which
encourage dto implemen t innovativ e approache s in order forthe company tomeet itsgoals and objectives . andsnappy phrases. necessitates the creation of a communication plan. Errors in estimation or schedulingMediumHighHighProject manager Raisethe issue with the project sponsor andthe project board. Raisea Breakingdown tworiskcosts andestimating thecampaign's unfavourable aspectsthrough cost tracking and forecasting. Workshops scheduled.
change request fora budgetor schedule adjustmen t.Pull downthe backup plan. Breakdown in communication leads to ambiguity and uncertainty. MediumMediumMediumProject manager Createa communi cation strategy that includes the frequency , aim, and target audience foreach message. Identify An organization's leadership should be able to describethe areasinwhich aidisenhanced asaresultof acquiring additional sponsors via the campaign. Thecommunicationplan aidsinthecampaign's dissemination.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
stakehold ersearly onand make sure they're taken into account in the communi cation strategy. Audience s must be reached through the appropriat e route. Stakeholder action delays projectLowHighHighProject manager Determin ewhich stakehold ershave themost impactas Notifythe proper authoritiesso thatthe campaigncan combine product Stakeholder analysis aids in the decision-making process for camping investments.
a result of the engageme ntplan. Members ofthe campaign should schedule meetings atregular intervals. Thisaids in maintaini ng campaign discipline. andbrand marketing. Task 6 ParticularsQuality expectationAcceptance criteriaQuality specificationControlling techniques MethodologyKPIHigh qualityProject operationMonitoring
StakeholdersBenchmarkingHigh qualityEffective relationPersonal relations WBSKPIHigh qualityWork breakdownTrack of activities Gantt chartBenchmarkingHigh qualityProject stagesProject background Risk AnalysisKPIHigh qualityRisk registerRegister Conclusion and recommendations From the above analysis of given report document it can be concluded that, project management plays a crucial role in developing better standards of project work being produced in the project firm. Taking considerations of stakeholder analysis, risk assessment, preparation of WBS and network diagram can prove to effective techniques to develop an effective goal path towards attainment of desired project goals and objectives. Being engaged in project operationsTransport for London, is being recommended to take considerations of several aspects which will ensure efficiency of the project firm. Market research should be done on a regular intervals. Taking considerations of digital technologies in project operations could be helpful technique in reducing complexities of tasks. Effective decision-making can be ensured through evaluation of risk assessment by participative decision making processes in the project industry.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
References Books and Journals Jacoby, D.S. and Gupta, A.R., 2021.Reinventing the Energy Value Chain: Supply Chain Roadmaps for Digital Oilfields through Hydrogen Fuel Cells. PennWell Books, LLC. Lenhart, S. and Araújo, K., 2021. Microgrid decision-making by public power utilities in the United States: A critical assessment of adoption and technological profiles.Renewable and Sustainable Energy Reviews,139, p.110692. Lobina, E., 2019. UK: Strong and Weak Lock-in of Water Governance Outcomes in England.Facing the Challenges of Water Governance, pp.155-188. Ozaki, R., 2018. Follow the price signal: People’s willingness to shift household practices in a dynamic time-of-use tariff trial in the United Kingdom.Energy research & social science,46, pp.10-18. Rensman, J.W. and Kraayeveld, G., 2020, August. PWHT Exemptions for Carbon Steel in B31. 3: An EPC Contractor’s Perspective. InPressure Vessels and Piping Conference(Vol. 83860, p. V006T06A063). American Society of Mechanical Engineers. Thayer, P., 2017. Enabling the Fourth Industrial Revolution (4IR) and the role of NDE and monitoring.Insight-Non-Destructive Testing and Condition Monitoring,59(9), pp.469-472. Waseem, M., Sajjad, I.A., Haroon, S.S., Amin, S., Farooq, H., Martirano, L. and Napoli, R., 2020. Electrical demand and its flexibility in different energy sectors.Electric Power Components and Systems,48(12-13), pp.1339-1361.