Project Management Transport for London Project brief
Verified
Added on  2023/06/17
|15
|2040
|253
AI Summary
This report explains the process of project management for Transport for London, including business case, network diagram, stakeholder analysis, work breakdown structure, risk analysis, and quality expectations.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
Project Management Transport for London project brief
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Executive summary: Project management is the process of managing and organising activities of event in efficient manner for attaining determined goals and objectives. In this report transport of London is taken thatisinvolvedinconstructinggreener,saferandsustainroads.Inthisreportvarious measurement tools and work break-down structure is explained.
Contents Executive summary:........................................................................................................................2 INTRODUCTION...........................................................................................................................4 TASK 1............................................................................................................................................4 Business Case..............................................................................................................................4 TASK 2............................................................................................................................................5 Developing network diagram......................................................................................................5 TASK 3............................................................................................................................................8 Stakeholder analysis for the project.............................................................................................8 TASK 4............................................................................................................................................9 Developing numbered breakdown structure and organisational structure..................................9 TASK 5..........................................................................................................................................11 Risk analysis..............................................................................................................................11 TASK 6..........................................................................................................................................13 Quality expectations, quality specifications, acceptance criteria and measures to be put for controlling the event..................................................................................................................13 CONCLUSION..............................................................................................................................13
INTRODUCTION Project management is defined as the procedure that enables an individual to lead as well as manage various activities and task on time with efficiency in order to achieve determined target of projects. It is very important for project managers to have suitable skills and capabilities with the objective of managing teams and resources in efficient manner(Horning, 2018). In this report various stages or task are included that are necessary for project manager to complete project with efficiency.Transport for London is the construction organisation which objectives is to constructroadsinLondonwithouthavinganynegativeimpactonnaturalenvironment. Organisation concentrates on develop greener, safer as well as effective roads. In this report work break down structure, possible risks faced by Transport of London in the process of managingtheirproject.Furthermore,networkdiagram,stakeholderanalysisandquality expectations are explained in this report. MAIN BODY TASK 1 Business Case Executive summary Project management is considered as the complex process that is related to utilise specific knowledge, skills, tools as well as techniques in order to deliver something valuable to people. It is responsible for leading and guiding team to work in efficient manner to attain determined goals and objectives. This project report undertakes road project of transportation for London which is safer, sustainable and greener that will enhance bus network across the London(Joseph and Marnewick,2018). Sustainability and eco-friendly are important aspects that are considered by project manager to complete project task properly. Reasons There are some reasons for that the project is undertake. These reasons are mentioned below: ï‚·To develop streets in London which are attractive for the citizens and visitors as well as prosper the beauty of city. ï‚·Main objective of project is to improve bus network across the London. ï‚·To enhance sustainability through developing greener and safer roads for travellers. ï‚·Project aim is to reduce the level of inconvenience of travelling in current road .
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Expected benefits The project is beneficial through reducing fuel consumption that harm environment. Enhance greenery on streets that foster healthy and safe breath to people. Beneficial for preventing road accidents as well as misconducts. Enhance visitors and travellers to London that enhances exchange rate of country. Expected drawbacks For ensuring success of project, it is essential to enhance financial aid to construct aesthetic and safer road. Time scales Project time: 1 month 15 days Project start: Project starts on 27th September 2021. Project ends: 12 November 2021. Tolerance: +- 4 weeks First review of project activities are scheduled after 2-4 months. Estimated cost £ 30,000 Estimated cost of yearly maintenance is £ 5000. Change budget 30% of cost are £7000 will be available Risks Maintenance cost of road are higher than expectations. Debatesfromstakeholdersandotherbrandcanbethereasonofreplacementof transportation for London. TASK 2 Developing network diagram Network diagram defined as the graphical representation of specific project and it contains series of connected arrows as well as boxes in order to describe interrelationship between various activities that are involved in project(Lauren, 2018). It makes easy to understand all activities of event that are performed by project manager. In network diagram data and starting and completion time durations are represented. It enables project manager to sort out different activities of event in efficient and effective manner. It provides guidance and direction to project manner to attain determined targets of project. Network diagram of Transport for London is explained below:
From the above network diagram, it is evaluated that blue line is the shortest path and time frame through that organisation attain determined goals and objectives that are related to constructing roads. Diagram depict minimum 116 days to complete the construction work of roads.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
TASK 3 Stakeholder analysis for the project Stakeholder analysis is defined as the process of evaluating a system as well as potential change to it as they are related to the relevant and interested parties. Basically, it is the systematic process of gathering as and analysing quantitative information in order to determine that whose interest should be taken into consideration in the process of developing and implementing project policies and programme(Moradi, Mousavi and Vahdani, 2017). It enables project manager to understand power and interest level of different stakeholders. Stakeholders are the parties that related to business activities and either getting affected or affect business operations, they play important role in motivating employees for their innovative ideas to attain determinedgoalsofproject.Somestakeholdersofrespectiveorganisationareinvestors, audience, Town Hall Committee and few others. High power and high interest- These stakeholders possess high power and high interest level because they are closely related to the project activities. Investors are the stakeholder who provides funds for completing project activities on time with efficiency. Investors involvement is high in projects and they have high power because investment is the essential resource for running project activities properly.
Low power and low interest-Audience are the stakeholders who have no interest in activities and task of project on the same time they have low power in to control project. Organisations ensure that these stakeholders are agree on the plans that are developed by project managers and support their execution as well. High power and low interest-Town hall committee people have low interest as well as low power because their hall areas are used by the organisation to celebrate event and complete it in efficient manner. Low power and high interest-Organisers as well as participants are the stakeholders that are grouped in this section who possess low power and high interest in project activities. Because of having least power they are not able to change anything regarding project(Müller, Drouin and Sankaran, 2019). TASK 4 Developing numbered breakdown structure and organisational structure Work breakdown structure is the project management tool and system in which whole work is breaking down in various smaller components. It enables project manager to organise team efforts and work in manageable sections. Organisations adopts work break-down structure to divide whole work in easier task so that they can performed in most efficient manner. project manager pay focus on each component of task and perform them it systematic way to attain determined goals and objectives properly.
Organisational structure is defined as the system that provides guideline to perform certain activities in proper way to achieve determined goal and objectives efficiently. These activities are related to roles. Responsibilities and rules(Obradović, 2018). It is determined as the way that shows how information flows between various department of organisation. it is related to analyse activities and resources that are required to complete project on time with having great efficiency. In effective organisational structure each and every team member have clear sense of understanding their job roles and responsibilities to complete defined functions on time.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
TASK 5 Risk analysis No . RiskEffectPossibilityMitigation 1Resistance among employees and conflicts highLowTheorganisationimplementsimprovised conflictmanagementandchange management tools and techniques for the purpose of avoiding risk as well as foster harmony among organisational employees and stakeholders. 2Risk of financial losshighlowOrganisationexecuteseffectivebudget planningwhichisimportantfinancial
planning to mitigating financial losses. It helpsbusinesstoallocateitsfinancial resourcesatrightplacetoenhances performance of projects as well as control cash flows regarding projects. 3Unproductive working environment of TFL highHighProjects managers should develop effective policies.Scheduleandplansofproject activitiesthatmotivateemployeesto perform defined functions with efficiency (Wren, 2018).Managers review employee performanceofregularthatensures optimality of overall project. 4Climatic changeshighHighSpecific location is selected for organising eventthatreducestheriskrelatedto climate.As climate change impacts on efficiency of event so managers forecast climate to mitigate the risk.
TASK 6 Quality expectations, quality specifications, acceptance criteria and measures to be put for controlling the event Quality expectations are defined as the aspects that are customers are expecting from business products and services. In order to attain success in competitive business environment it is necessary for business satisfy needs and demands of customers through provide quality products at affordable prices. It enables organisation to retain loyal customers with business for long period and enhance organisational sales(Rumeser, and Emsley, 2019). With the respect of given case of organising eventit is important to meet all expectations of stakeholders and audience they are fund provider to the event. It is the responsibility of organizer to ensure that their halls and venues are properly cleaned and managed to provide quality experience to audience. Event managers monitor all activities of events and take quick as well as efficient decisions that enable to solve problems properly. CONCLUSION As per the above report, it can be concluded that managing and organising all project related activities is tough task, so project managers consider various aspects to lead all activities in right direction and attain defined goals and objectives. There are various stakeholders are included in project, it is very important to satisfy needs and demands of these stakeholders to run activities of event in right direction.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
REFERENCES Books and Journals Horning,T.M.,2018.Successfulprojectmanagement(Doctoraldissertation,Walden University). Joseph,N. andMarnewick,C., 2018.Investinginprojectmanagementcertification:Do organisationsgettheirmoney’sworth?.InformationTechnologyand Management,19(1), pp.51-74. Lauren, B., 2018.Communicating project management: A participatory rhetoric for development teams. Routledge. Moradi, N., Mousavi, S.M. and Vahdani, B., 2017. An earned value model with risk analysis for projectmanagementunderuncertainconditions.JournalofIntelligent&Fuzzy Systems,32(1), pp.97-113. Müller, R., Drouin, N. and Sankaran, S., 2019.Organizational project management: Theory and implementation. Edward Elgar Publishing. Obradović, V., 2018. Contemporary trends in the public sector project management.European Project Management Journal,8(2), pp.52-56. Rumeser, D. and Emsley, M., 2019. Lessons learned from implementing project management games.International Journal of Serious Games,6(1), pp.71-92. Wren,A.,2018.TheprojectmanagementA–Z:Acompendiumofprojectmanagement techniques and how to use them. Routledge.