This report is based on Transport for London in which it construct some land with an intent to build approximately 800 new homes. This assignment will contain initiation, the network diagram, stakeholder analysis, a work breakdown structure and risk analysis that help to enhance the productivity of organization
tabler-icon-diamond-filled.svg

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Project Management
Transport for London
Project Brief
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Contents
INTRODUCTION .............................................................................................................................3
TASK 1..............................................................................................................................................3
Methodologies................................................................................................................................3
TASK 2..............................................................................................................................................4
Develop a network diagram...........................................................................................................4
...........................................................................................................................................................6
TASK 3..............................................................................................................................................6
Stakeholder analysis.......................................................................................................................6
TASK 4 ...........................................................................................................................................8
TASK 5..............................................................................................................................................8
Risk analysis...................................................................................................................................8
TASK 6............................................................................................................................................10
CONCLUSION ...............................................................................................................................10
REFERENCES.................................................................................................................................11
Document Page
INTRODUCTION
Project management is an activity of serving function that need to be done when
overseeing the organizational performance. It include utilization of the certain techniques,
knowledge and skills. Project development practices are considered as exploring software that
intensify the business process, building construction, relief process and many more (Crawford,
2021). In every sector, it is essential to understand the project by analyzing surroundings and also
put effort in order to bring something innovative or new that could assist in rising the
organizational activities. This report is based on Transport for London in which it construct some
land with an intent to build approximately 800 new homes. This assignment will contain initiation,
the network diagram, stakeholder analysis, a work breakdown structure and risk analysis that help
to enhance the productivity of organization
TASK 1
Methodologies
In a project plan, activities are documented and integrated so that these can be used by
people when they practices to achieve their organizational goals. Main purpose of this project to
construct around 800 homes with a good structure and also organize the event successfully as it
will support the business to enhance its organizational reputation. In relation to TFL, different
methodologies can be used by respective firm. These methodologies are discussed here,
Waterfall- It is analyzed that people exploit different methodology or framework to
complete their project including manufacturing, construction and engineering. These methodology
help them by granted certain benefits at the end of project completion (Delisle, 2019). It consist
various stages including requirement, design implementation, verification and maintenance. In
context of respective firm,
in the phase of requirement, in order to design the product, it analyze product need when making
homes in which the software architecture is being exploited and oversees all the activities. In
second phase of the verification, products and other raw material are verified in order to perform
each function successfully. At last, in the phase of maintenance, it is exploited in order to maintain
all function and the project in effective way. With the help of this, profitability and productivity
can be enhanced by following all given stages and software effectively.
Document Page
SCRUM- when constructing any project, this methodology is utilized so that software can
be created and value served to client's . it is exploited when work together after creating a group
or team and handling their work accordingly (Galli, 2018). There are three main principle such as
transparency, adaption and inspection which are very useful to complete the activities efficiently.
In transparency, TFL, catch the input and output as well as the development process course. At the
stage of inspection, they mainly focus on getting review or feedback based on certain projects. At
last, in adaption, they bring change sin given project and adopt them effectively. It will help them
to build the business by keeping their performance on top.
TASK 2
Develop a network diagram.
A network diagram is that graphic content which include aggregation of series of the
attached arrows and boxes with the intent to define an inter relationship between practices
entangled with project (Koke and Moehler, 2019). It is essential for people who overseeing
project and develop network diagram through handling the network documentation. Arrow in this
diagram, show a relationship among different practices, while boxes of nodes represent
explanation of the activities. It is significant for Transport for London to start or end activities.
Current project of Transport for London is shown in this network diagram which is given below:
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
Document Page
With the help of this table, the diagram is being prepared:
Early Start Activity Number Early finish
Slack
time
ACTIVITY NAME
Late Start Duration Late Finish
This critical path shows that to complete this project some activities are discussed within the brief
which consume more time to be finished. Accordingly, evaluation, more time is over one week to
complete the project. In context of TFL, more time will be taken during this task 1, 2, 4, 5, 9, 10,
21 and 22. this project will take 116 day in order to complete successfully.
TASK 3
Stakeholder analysis
This analysis depict a techniques used by the project manager in order to understand the
stakeholder and also provide an orientation so that the task can be achieved easily. In this process
quantitative data are collected and analysed when performing a task or project that help in the
development of organisational performance (Ordoñez and et. al., 2019). In relation to TFL, its
conduct the stakeholder analyses effectively which state that which stakeholder perceives a high
interest and power. In context of the respective company, this analysis is given below:
Document Page
High power high interest-It depict those stakeholder that contain a high interest with high
power to follow the regulation accordingly. In relation to TFL, it include government and
the town hall committee as they develop the rules and regulation so that they project
completed smoothly.
High power and low interest- In this category, organiser and participant run the entire
task as they have power to make essential changes in given project plan. In this amount of
the remuneration is fixed.
Low power and high interest- It include the the investors of TFL as they are the people
with high interest and low power.
Low power and low interest- This category include the customer and employees as
workers perform to satisfy the customer's demand and then get remuneration. In relation to
TFL, this company has lose its customer as they are not able to satisfy its customer.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
TASK 4
Work break down structure
It is a very significant framework that is used by individual who has numerous activities
that he need to complete the given task or project (Rumeser and Emsley, 2018). It help people by
dividing big task into small parts. It also help in making business activities and performance in
job's aspects. In relation to TFL, their project is divide into many areas which are mentioned
below:
TASK 5
Risk analysis
No
.
Risk Effect Possibility Mitigation
1 Failure of power Devalued High Manage quality of raw material
by to control risk.
2 Alteration in High Average Make plan by considering
Document Page
upwind weather condition of last year.
3 Safety and
security
Devalued Moderate Follow the safety regulation
4 Lacking human
resources
High High Select an appropriate HR to
arrange resources properly.
5 Innovative
technology
Devalued Average Administration of good market
investigation will aid in change
the tools and other outfit.
6 Wrong catering
in the site
High Devalued Expert and psychological
feature workforce plays the key
function to finish task.
7 Low level of
coordination
High Low A good coordination is
essential to end the task.
8 Less area Devalued High Faithful governance of
resources and assets will be
healthful to bound the risk.
9 Social issues. High Low Boost CSR is outstanding to
limit such endangerment.
10 Self-esteem High Low To make affirmative working
situation while motivating to
provide feedback on the task.
11 Lacking of the
parking location
Devalued Devalued To build finespun parking
place.
12 A financial loss Devalued Devalued Efforts a to plan a right budget
by proper management of
finance (Toosi, Ghaaderi and
Shokrani, 2021).
13 Arguments in
projects
High Devalued Provide right instruction to
limit issues.
14 Low morale Average Devalued Work force's morale can be
Document Page
increased.
15 Government
intervention
Devalued Devalued Follow the government laws
legally.
16 Inadequacy of
resources
High Average Use site to collect essential
information
17 Worker safety High Devalued Maintain an equality among
workers.
18 Act of God Low High -
19 Inefficacious
time
establishment
Devalued High Exploit resources as per the
plan
20 Market
uncertainty
High Devalued Examine marketing to mange
activities.
TASK 6
Particulars Quality
expectation
Acceptance criteria Quality specification Controlling
techniques
Promotion Top-quality People rise by
approximately 25%
Consideration of latest
creature and e-
commerce marketing.
Education and
establishment
Methodolo
gical
analysis
Top-quality Fruitfulness will hike
by approximately
15%.
Waterfall and SCRUM Principles of
methodological
analysis
Risk sorting Top-quality Resolving conflicts
of structure about
70%
Risk register Correct
administration of
risk
Carrying
into action
Top-quality Improving turnover
rate by
approximately 7%.
WBS and Gantt chart Exercise of
carrying into
action analysis
tabler-icon-diamond-filled.svg

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
tool.
CONCLUSION
From the above report it is analysed that the project management consist of several
activities as it include several activities such as organising, guiding, planning and controlling, in
this WBS is also used so that the project of TFL can be completed successfully. It help the
business to perform well and complete the task efficiently.
Document Page
REFERENCES
Books and Journals
Crawford, J.K., 2021. Project management maturity model. Auerbach Publications.
Delisle, J., 2019. Uncovering temporal underpinnings of project management standards.
International journal of project management, 37(8), pp.968-978.
Galli, B.J., 2018. The future of economic decision making in project management. IEEE
Transactions on Engineering Management, 67(2), pp.396-413.
Koke, B. and Moehler, R.C., 2019. Earned Green Value management for project management: A
systematic review. Journal of Cleaner Production, 230, pp.180-197.
Ordoñez, R.E.C. and et. al., 2019. A study of the critical chain project management method
applied to a multiproject system. Project Management Journal, 50(3), pp.322-334.
Rumeser, D. and Emsley, M., 2018. A systematic review of project management serious games:
Identifying gaps, trends, and directions for future research. The Journal of Modern Project
Management, 6(1).
Toosi, H., Ghaaderi, M.A. and Shokrani, Z., 2021. Comparative study of academic research on
project management in Iran and the World with text mining approach and TF–IDF
method. Engineering, Construction and Architectural Management.
Document Page
chevron_up_icon
1 out of 13
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]