Running Head: PROJECT MANAGEMENT
1
Project Management
[Author]
[Institution]
EXECUTIVE SUMMARY

The project is for upgrading 3G to 4G in Kathmandu for improving the data quality and
large area coverage. In context to this, the present file has included project scope and
determination of the resources. Along with this, the study has added quality planning and risk
management plan for offering high quality and error free project to the client. For analyzing the
stakeholder, project has involved stakeholder analysis properly. In the end, deployment plan has
included within the project for effective implementation process.
Table of Contents

EXECUTIVE SUMMARY.............................................................................................................2
INTRODUCTION...........................................................................................................................4
Determination of project scope....................................................................................................4
Estimation of time for project......................................................................................................5
Determination of resources needs for project..............................................................................8
Gantt chart and Network Diagram...............................................................................................9
Estimation of cost for project......................................................................................................9
Quality planning for project.......................................................................................................10
Stakeholder analysis..................................................................................................................11
Communication Plan.................................................................................................................12
Risk Management Plan..............................................................................................................13
Project Deployment Plan...........................................................................................................15
Recommendations......................................................................................................................16
CONCLUSION..............................................................................................................................17
REFERENCES..............................................................................................................................19

Table of Figures
Figure 1: Gantt chart......................................................................................................................10
Figure 2: Network Diagram...........................................................................................................10
List of Table
Table 1: Cost Estimation.................................................................................................................9

INTRODUCTION
Technology in the field of mobile and related applications is growing fast with time. It
was one of the major jumps in the field of technology when the wireless networks transformed
from analog to the digital. Wireless telephone technology i.e. mobile telecommunication includes
list of generations which are 1G, 2G, 3G and 4G. Each generation is believed to be faster, more
secure and more reliable than the previous one. 3G is offering faster data, speed and at least
200KB per seconds for multimedia use. The 3G was long time standard for the wireless
transmissions until 4G does not released. After the release of 4G, people are upgrading their
services for getting much faster speed and services. With respect to this, the present project plan
is based on the Mobile 3G to 4G Upgrade in Kathmandu. In context to this, the file includes
project scope, time and cost estimation, quality planning, risk assessment and implementation
(Kerzner & Kerzner, 2017).
Determination of project scope
In 2G, there was facility of making calls and sending text messages. Later, the 3G
released with the features of web browsing, email, video downloading, picture sharing and many
more. The 3G network was capable enough to handle approximate 2 megabits per second.
Individuals around the world were highly satisfied with the third generation network. Now, the
technological world has brought new 4G in the market with higher speed and more features. The
speed and standards of 4g is about 100 Megabits per second and up to 1 Gigabits per second. 4G
is pure data connection as it possesses end to end internet protocol connection. In the present
time, Kathmandu is facing issues due to availability of 2G and 3G network. Due to the absence
of skilled and necessary resources, the city is unable to upgrade its network from 2G and 3G to
4G. With respect to this, the people are facing network issues due to which they are unable to
call and access internet. On the other hand, irregular topography of Kathmandu is another reason
behind the usage of 2G and 3G. Thus, the aim of the present project plan is to upgrade the
technology from 3G to 4G in Kathmandu (Fleming & Koppelman, 2016).
Aim: To upgrade mobile network from 3G to 4G in Kathmandu
Objectives:

The objectives of the present project plan are as follows:
To implement 4g network in the environment of Kathmandu
To provide large area network coverage
To provide affordable services to the people
Estimation of time for project
Project schedule is one of the important tool by which project manager can easily
estimate the total required time for completing the project. Project schedule for the current
project is as follows:
WB
S Task Name Durati
on Start Finish Predecess
ors
Resource
Names Cost
1
Mobile
network
project from
3G to 4G in
Kathmandu
136
days
Mon
5/28/1
8
Mon
12/3/1
8
$1,500,000.
00
1.1
Project
Initiation
and
conception
25
days
Mon
5/28/1
8
Fri
6/29/1
8
$20,000.00
1.1.
1
Project
Charter
10
days
Mon
5/28/1
8
Fri
6/8/18 Project Manager $8,000.00
1.1.
2
Project
initiation
15
days
Mon
6/11/1
8
Fri
6/29/1
8
3 Project Manager $12,000.00
1.2
Project
definition
and
planning
47
days
Mon
7/2/18
Tue
9/4/18 $27,840.00
1.2. Scope 10 Mon Fri 3,4 Project Manager $8,000.00

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Evaluation of LTE/LTE-A Network Security
|9
|2427
|132

Big Data Analytics in 5G - Doc
|12
|3324
|70

Implementation of 5G
|16
|2535
|75

Evaluation of 5G Network and the Security Issues 2022
|13
|3931
|28

5G Cellular Network and Security Challenges
|13
|5988
|211

Project on Mobile Phones and Material Engineering
|16
|4653
|31