Project Management: Website Development for Restaurant

Verified

Added on  2022/08/12

|4
|468
|18
Project
AI Summary
This project management assignment focuses on the development of a website for a local restaurant. The assignment outlines the steps involved in the project, including defining the project scope, listing project tasks, preparing the information architecture, estimating costs and timelines, obtaining client approval, and finally starting the work. The assignment emphasizes the importance of wireframes and the use of online tools for developing the website's interface. The provided solution details the processes involved in bringing the business online, from project definition to the creation of the website's structure and functionalities. The assignment highlights key aspects of project management such as setting up the project, planning the information architecture, and managing the budget.
Document Page
Running head: PROJECT MANAGEMENT
PROJECT MANAGEMENT
Name of the Student
Name of the University
Author Note
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
1PROJECT MANAGEMENT
Discussions
A local restaurant would like to put the business online and i am in the charge of this
project.
A scope of a project is a part of the planning of project that includes deciding and
documenting a list of the particular goals of project, functionalities, deliverables, tasks and
the cost (Hasan, 2018).
The following steps can develop the scope of the web-based project:
Defining of the project: the project must be defined that is the creative brief of the project
should be defined
Tasks of project: After the creative brief has been done, the scope of work must be listed
and the following areas should be listed. Setup of the project, architecture of information,
project launching and the tasks after launching.
Preparation of the information architecture: The information architecture should be done
after the setup is done and the launch tasks are made ready. The structure of the website is
to be done (Koritsas, 2016). The wireframes of the websites are to e developed in order to
see the look of the websites
Figuring the cost of the items and the time required: The cost of developing the website
must be figured and also the time required in order to complete the project and the client
should be communicated with the budget and the time required to give the project to the
client
Getting the approval of client: the client approval must be taken before the project is
started either is a paper or digitally signed by both the parties.
Start the work: The work must be started as the scope of the work is done and finish the
project within the budget and the timeline.
Document Page
2PROJECT MANAGEMENT
The online business interfaces are easy to develop using the softwares those are available
online that is the wireframe of the website and the functionalities of the website (Liang,
Wang & Zhang, 2017). The approach of the project is that the wireframe is to be developed
and after that, the website is to be developed.
Document Page
3PROJECT MANAGEMENT
References
Hasan, J. (2018). Designing and Developing E-Commerce Website with Magento.
Koritsas, S. (2016). Launch of new resource on ASID website. Intellectual Disability
Australasia, 37(4), 7.
Liang, R., Wang, J., & Zhang, H. (2017). Evaluation of e-commerce websites: An integrated
approach under a single-valued trapezoidal neutrosophic environment. Knowledge-
Based Systems, 135, 44-59.
chevron_up_icon
1 out of 4
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]