1PROJECT MANAGEMENT Quality Management Plan A quality management plan is essential in a project in order to keep check on the quality of the outcomes gathered from the project. In most of the projects, the quality of outcomes is extremely important as they define the success of the project. During the planning phase of the project, certain quality standards are to be set that must be followed throughout the course of the project. In this particular project of St. Dismas hospital, the quality standards should be set for construction materials, building structure, design, interior development and others. Quality management plan can be considered as a mini project within the main project and similar to the project, the quality management plan also requires appointment of various stakeholders who will monitor, supervise and control the quality of the project specifically. Some of the main aspects of the quality management plan for this project are as follows. Monitoring and Control The project manager has the duty of project monitoring and control but he will also appoint a quality analyst in order to monitor the quality of the project. The quality analyst will review the quality of the project in terms of construction materials, building design and quality, quality of interior development like plumbing and electrical wirings and others. The quality will also be determined using performance measures as follows. Schedule Performance Index (SPI)0.62 Cost Performance Index (CPI)0.79
2PROJECT MANAGEMENT Control Thresholds The control thresholds for the St. Dismas project are between 0.9 to 0.8. However, it is seen that the cost performance index is almost 0.8 and hence requires minor attention. On the other hand, the schedule performance index is very low (0.62) and hence, it requires immediate attention for better usage of schedule. Cost Reporting The earned value metrics and other cost details are entered below. W B S Activity1- Au g- 99 15- Au g 29/ 10/ 199 9 4/1 1/1 999 9/11 /199 9 14/ 11/ 199 9 21/1 1/19 99 28/ 11/ 199 9 5/1 2/1 99 9 13/ 12/ 199 9 22/ 12/ 199 9 PV% Co mp lete EV 1Planningof Project Quality $ 10, 00 0 $ 15, 000 $ 25, 00 0 10 0% $ 25, 00 0 1. 1 Analyzing Project Quality Requirement s $ 5,0 00 10 0% $ - 1. 2 Setting Quality Standards $ 20, 000 10 0% $ -