Construction Project Analysis: Assignment 3, [University Name]

Verified

Added on  2021/06/17

|18
|3304
|86
Homework Assignment
AI Summary
This assignment analyzes various aspects of high-rise construction projects. It begins by exploring methods to shorten construction duration, including floor cycle times and the impact of learning curve theory on activity time estimation. The assignment then delves into crane selection, detailing the types and capacities of tower, crawler, and mobile cranes suitable for the project. Furthermore, it examines the concept of long lead items and their impact on project timelines, proposing strategies to mitigate potential delays. The assignment also includes calculations for concrete works production duration, considering buffer time for disruptions. Finally, it touches upon the challenges of working at high heights, a critical aspect of such projects. The document is a comprehensive analysis of construction project management challenges and solutions.
chevron_up_icon
1 out of 18
circle_padding
hide_on_mobile
zoom_out_icon
Loading PDF…
[object Object]