AKM Developments Limited Construction Checklist

Verified

Added on  2023/04/08

|7
|763
|168
AI Summary
This document is a construction checklist for AKM Developments Limited. It includes various aspects of construction projects such as risk assessment, evacuation plans, safety committee, sheds, protection & hoardings, plant & equipment. The checklist also provides audit notes and a bibliography for further reference.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Project Mgmt.
First Name Last Name
Institution

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
AKM Developments Limited construction checklist
Part 1.
To be filled by the assessment officer.
Strathfield apartments
Representative of the developer
Name of the contractor
Name of the project
Stage No.
Location of the project
Date of audit
Name of the assessment officer (AO)
Signature of the assessment officer
Definition of audit results
Classification of results Definition of results Criteria for recording audit
results
Observation This defines little deviations
from the defined
specifications and requires no
rectification and is suggested
for future work.
Mark either yes/ No based on
the findings and note key
details of the markings made
in the comment section and in
the audit assessment report.
Minor non-compliance This refers to considerable
deviations from required
specifications such that the
quality of the product is
affected. This necessitates
rectification.
Mark either yes/ No based on
the findings and note key
details of the markings made
in the comment section and in
the audit assessment report
Major noncompliance This implies deviations from
required Acts, regulations and
standard specifications to
Mark either yes/ No based on
the findings and note key
details of the markings made
Document Page
AKM Developments Limited construction checklist
such a level that product
quality, safety of the
contractor, the environment,
AKEM developments ltd
and /or general public is
compromised. This requires
urgent rectification
procedures initiated.
in the comment section and in
the audit assessment report
Any checklist items flagged by the assessment officer constitutes major non-conformance when
not approved by the officer in charge of the assessment. This should be interpreted as urgent and
critical.
Item Audit query Cat no. Compliance
audit
Results/
comments
Ye
s
No N/A
2. a. Risk assessment plans
Risk management plan available?
Proper guideline on risks
management applicable?
Risks management plan accessible?
a. Evacuation plans
Emergency evacuation plans
available?
Sufficient facilities and spaces
available for evacuation operations?
b. Emergency response plans
Emergency medical contacts
available and accessible on site?
First aid requirements and
specification complied with?
c. Inductions
Document Page
AKM Developments Limited construction checklist
Employees induction training
active?
Is the induction training regular?
How frequent?
d. safety committee (established, chair elected, frequency, minutes)
Is there a safety committee on site?
Are there elected leaders and clear
statements of their role/?
Is the frequency of the committee
sittings satisfactory?
Are there any minutes on previous
meetings?
3. sheds
a. Types
Is there a specific type of shed(s)
are used on site?
If any, does it conform with the
design specifications?
b. Inclusions
Any inclusions on site?
If yes, is it efficient? specify
4. Protection & hoardings
a. Fencing Is fencing safe
and adequate?
b. Overhead Are there
overheads on
site? Details?
c. Temp elec. Any temp
Elec, within
the site?
Details please

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
AKM Developments Limited construction checklist
d. lighting Is there
reliable
sufficient
lightning on
site?
e. demolition Demolition
works
conducted as
required?
f. asbestos are asbestos
material
applicable on
site?
g. excavation
s
Any
excavation
works on site?
Details please
h. scaffolding Scaffolding
works
conducted as
per the
guidelines?
i. falsework Is falsework
safely applied
and adequate?
j. general Is the site’s
general
provisions
adequate?
5. Plant & equipment
Is there any plant equipment used
Document Page
AKM Developments Limited construction checklist
on site?
Are there operation and safety
manuals on their operation?
Are plant and equipment operators
qualified?
Are there safety precautions and
protective gears by personnel?
Note: ‘general’ implies site provisions and facilities such as handrails, landings,
penetrations, ladders, EPT, PPE, Oxy, welding, lasers, power tools, material storage, fibers,
hazardous materials, fall protection, hearing protection, confined spaces, compressed air.
Audit Notes
Enter any additional details relevant for the audit here.
Course of action/.
No. Action Task Target date Signature upon
completion
Bibliography
Document Page
AKM Developments Limited construction checklist
Auditing Within the Construction Industry. (2018). Audit and Accounting Guide, 147-148. doi:
10.1002/9781119557630.ch7
Construction Projects. (2017). Quality Management in Construction Projects, 169-215.
doi:10.1201/9781315098425-4
Internal audit: Inspection procedures and practices for multifamily projects during construction.
(2010). Washington, D.C.: U.S. Dept. of Housing and Urban Development, Office of
Inspector General, Office of Audit.
New York City Department of Cultural Affairs, New York City Department of Design and
Construction: Management of capital projects for cultural institutions. (2012). Albany,
NY: The Division.
Quality Tools for Construction Projects. (2013). Quality Tools for Managing Construction
Projects Industrial Innovation, 91-179. doi:10.1201/b14754-4
State Education Department, oversight of school district construction projects. (2014). Albany,
NY: The Division.
Towey, D. (2013). Cost management of construction projects. The Atrium, Southern Gate,
Chichester, West Sussex, UK: Wiley Blackwell, John Wiley & Sons.
Yang, J. (2017). Audit Oversight. Environmental Management in Mega Construction Projects,
289-306. doi:10.1007/978-981-10-3605-7_24
1 out of 7
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]