Ask a question from expert

Ask now

Project on Building a Hydraulic Floor Crane

7 Pages1664 Words875 Views
   

Added on  2020-05-16

Project on Building a Hydraulic Floor Crane

   Added on 2020-05-16

BookmarkShareRelated Documents
CAREER EPISODE 2CE 2.1 Project InformationName of the project: Building a Hydraulic Floor CraneLocation of the project: [please fill name of the place where the project was conducted]Project Duration: From [please fill] to [please fill]Organization: [please fill]Role and Designation during the time: Project Team MemberCE 2.2 Project BackgroundCE 2.2.1 Characteristics of the projectThis project was about fabricating a hydraulic floor crane. Hydraulic crane can be usedfor lifting heavy materials and objects. The failure of the contemporary floor jib cranes is due tothe static loads that are left on the cranes for a long time. In this project, I designed a mobilehydraulic crane that has a special feature for overcoming the challenge of failure because ofstatic loads. This project was undertaken to develop a hydraulic crane that has the capability tolock the loads at various levels. I assisted my team members to design a crane that could bear aload of 1000 kg. The main materials that were used for carrying out this project were angulariron, sheet metals, nuts, bolts and metal rollers. CE 2.2.2 Objectives developed for the projectThe main objectives of this project were:
Project on Building a Hydraulic Floor Crane_1
To gain practical knowledge and experience in the field of mechanicalengineering that deals with material handling To get an insight into the principle of hydraulicTo design and build a floor crane based on the hydraulic principleCE 2.2.3 My Area of workBeing a project team member, I had to work under the supervision of the project teamleader. My main area of work was to study various components of the hydraulic crane such asthe hydraulic tank, hydraulic cylinder, hydraulic hoses, truck and hydraulic relief valves. I had toensure proper execution of the fabrication processes such as assembling marking out, drawing,welding and filling. I had to coordinate and sequence the processes in an appropriate manner forgetting the desired outcome. The entire process of technical documentation was included in myarea of work.
Project on Building a Hydraulic Floor Crane_2
Project SupervisorProject Team LeaderTeam Member (ME)Team Member Team Member Team Member CE 2.2.4 Project GroupFigure 1: People involved in the projectCE 2.2.5 My responsibilities throughout the projectI was given the responsibility to research about the components and write a report basedon the findings. Being a mechanical engineer, my main responsibility was to design a floor cranebased on the principle of hydraulic. I had to prepare a PowerPoint presentation after thecompletion of the project. I was responsible for getting a thorough understanding of the workingprinciple of hydraulic systems. I had to ensure proper synchronization of the various processesinvolved in the fabrication of the mobile hydraulic crane. I was responsible for carrying out theentire project layout and project plan. I had to properly schedule the project activities forachieving the project objectives.
Project on Building a Hydraulic Floor Crane_3

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Design and Development of Hydraulic Jack Project
|7
|1653
|109

Development of Hydraulic Rod Bending
|7
|1670
|121

Semi-Automatic Drain for Sewage Water Treatment of Floating Materials - Career Episode 2
|9
|1617
|59

Application of Hydraulic Hybrid System
|8
|1736
|178

Design and Fabrication of Drilling Machine Assignment
|7
|1690
|136

Designing of Water Lifting Device without Fuel
|10
|1525
|384