logo

Project Placement and Design Implementation

   

Added on  2023-04-20

20 Pages4669 Words448 Views
FinanceLeadership ManagementProfessional DevelopmentMaterials Science and Engineering
 | 
 | 
 | 
Running head: PROJECT PLACEMENT AND DESIGN IMPLEMENTATION
Project Placement and design Implementation
(Monet Holiday Park)
Name of the student:
Name of the university:
Author Note
Project Placement and Design Implementation_1

1PROJECT PLACEMENT AND DESIGN IMPLEMENTATION
Executive summary
The Monet Holiday Park comprises of the house and garden that is located at Giverny. To understand
its project implementation and design process, various trans-disciplinary models and theories are
demonstrated, underpinning to the analysis. Apart from this, various project phases have been taking
place to implement with the analysis of its efficiency. For resolving the issues that are work bases,
different skills are developed during the project and these are demonstrated in the study. At last,
various activities are considered and analyzed and evaluated in this report.
Project Placement and Design Implementation_2

2PROJECT PLACEMENT AND DESIGN IMPLEMENTATION
Table of Contents
Introduction:..........................................................................................................................................3
1. Brief background and context of current project:..............................................................................3
2. Various trans-disciplinary approaches underpinning the analysis:...................................................4
3. Analyzing the various project phases with implementation and preparation and evaluation of
efficiencies:............................................................................................................................................6
4. Skills developed to resolve the issues that are work-based:..............................................................8
5. Different actions to be taken and not taken:......................................................................................9
6. Learning from the project:...............................................................................................................12
Conclusions:........................................................................................................................................14
References:..........................................................................................................................................16
Project Placement and Design Implementation_3

3PROJECT PLACEMENT AND DESIGN IMPLEMENTATION
Introduction:
The holiday park and resorts are designed and created for people moving for the holiday. This
can include different kinds of the theatre, takeaway, swimming pools, restaurants, bar, amusements,
activities and accommodations.
The Monet Holiday Park includes the Monet’s garden and house situated at Giverny. It is a
little village located external to Vernon. It is about one hour drive from the city of Paris. In this
report, the project placement and design implementation of the Monet Holiday Park is demonstrated.
Here, various trans-disciplinary theories and models are discussed that underpin to the
analysis. Moreover, different project phases from preparing to deployment are presented along with
an evaluation of effectiveness. To resolve the work based problems, various skills that are developed
through the process is evaluated. Lastly, different actions taken and not taken are assessed and
analyzed in this study.
1. Brief background and context of current project:
The project design and implementation are helpful to understand the scopes in developing
skills for decision making. This is also helpful to integrate the communication and problem solving
with knowledge and skills that are generated in various units under the program to finish the realistic
project.
To understand how projects are designed and implemented there are two parts of the garden.
In the first place, there is the place of entry to enter through ticker gift or office shop. This is the
cottage-style garden known as Clos Normand. This oils present in front of the house of Monet. Here,
Project Placement and Design Implementation_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project Planning and Design Implementation for Monet Holiday Park and Resort
|55
|9074
|282

Cesim Simulation: Analyzing Theories and Effective Evaluation for Project Phases
|14
|3776
|483

Monet Holiday Park Case Study
|18
|3682
|80

Project Design and Implementation - Monet Holiday Park
|18
|4256
|234

Placement Design and Implementation Assignment
|16
|5369
|69

Placement Design and Implementation - Professional Research and Communication
|14
|3973
|202