Project Placement Design and Implementation

13 Pages4885 Words46 Views
   

Added on  2021-02-20

Project Placement Design and Implementation

   Added on 2021-02-20

ShareRelated Documents
LOGISTICS ANDOPERATIONS FOR OILAND GAS SPRING 2019
Project Placement Design and Implementation_1
TABLE OF CONTENTSTABLE OF CONTENTS................................................................................................................2INTRODUCTION...........................................................................................................................1MAIN BODY..................................................................................................................................1Analysis the trans-disciplinary model / theories to analyse of logistics and operations in termsof oil and gas Spring....................................................................................................................1Understand the project phases of oil and gas spring in terms of logistics or operations.............2Skills developed to solve work based problems..........................................................................4(5) Analysis of actions take to handle situation...........................................................................5(6) Portfolio evidence..................................................................................................................7CONCLUSION................................................................................................................................8REFERENCES..............................................................................................................................10
Project Placement Design and Implementation_2
INTRODUCTIONProject placement design and implementation is one of the most important part of aproject. It helps in planning, designing and implementation of a project. This Project placementdesign and implementation assignment provided an opportunity of developing various skillsrequired to solve work based problem. This assignment will lay emphasis on building a projectportfolio using various kinds of methodologies and activities, identification and articulation ofdevelopment of all the work related skills that can be used in any kind of project, background ofthe topic “Logistics and Operations for Oil and Gas Spring 2019”, effectiveness of planning andpreparation of undertaking prior project implementation. This assignment will help inunderstanding work based actions that can be taken to solve any kind of problem, appropriatetheories that can be used to explain one's learning and different ways it can be used to analysecomplete information in a better manner. This project will also focus on European springs andPressing Ltd organization which deals and works in Oil industry. This project will help inunderstand the issue that is being faced by the company, ways that problem was identified andsolved. MAIN BODYBackground of the being discussed and analysedThe present report is based on logistic and operation for oil and gas spring 2019.Henceforth, European springs and Pressing Ltd backed an effective tool that crucially used in Oilindustry. Gas spring is the kind of spring that is similar to the mechanical spring that relied onthe elastic deformation that uses the compressed the gas that is covered within the enclosedcylinder. Therefore, it sealed by the siding piston to pneumatically store potentially energy.Thus, issue that has been identifies is relate with “High temperature that were developing at thetime of drilling and that turn into affecting the properties of compression springs (Zavala-Araizaand et.al., 2015). At that time, It was analysed that compressor springs was high affected by thetemperature that was present on the sea land. After identifying this issue, the enterprise givenchallenging assignment of developing the special tool that can able to reduce the load at the timewhen drill bit came into contact with hard rocks. In order to cope up with the issues, the team hasbeen formed that is constantly striving to improve the profitability of the drilling and operation.This leads to reduce the daily operations cost by streamlining and shortening service service1
Project Placement Design and Implementation_3
contract with the drillers. Moreover, European springs and Pressing Ltd must have use digitaltechnology of the future to undertake the potential and vast improvements in the well drillingperformance within enterprise. Thus, entity is based on the technical adaption and to bringinnovation that can lead to the increasingly enhancing the firm operations by the use of advancedpredictive analytics, increment in design and by bringing more effective monitoring and real timesupport in order to have better operational decision making. In addition to this, this can be statedthat the enhancement in designing, prototyping and deliberating the radical solutions that work asto employs the number of the measures that bring corrective actions towards having durable andheavy compression springs that can compensate for the pressures. Therefore, the main aim behind this is that by providing the safe and reliable energyinfrastructure has become the foundation source of the business enterprise. Hence, operating thepipelines safely and reliably has become the highest priority. In order to deal with this needs theentity must have efficient and well designed supply chain management so it can support thebusiness and aids to gain competitive advantage to the enterprise. Logistic plays the crucial rolein order to ensure safe, timely and cost effective deliver services. Herein, efficient solution needsto be given at the time for the collaborative partners. This is very crucial for Europeans springsthat solutions to functionality issues must be design and it should have use of highest qualityservices. Henceforth, high quality design, effective operational activities and improved processof manufacture aids to bing better functions. Furthermore, European springs and Pressing Ltdwill take various initiatives for deploying unconventional drilling on the commercial scalethrough extensive standardization and the boarder adoption of slim-hole drilling (Zavala-Araizaand et.al., 2015). Thereafter, the main focus was on to bring development in the material and thiscan provide effective support in high temperature. This can done with the better R&D. Thesedefined in following manner as are- To have increment in operational safety and maintain well integrity.To have better Improvement within the drilling profitability.To have the use of better technical advancement so that there can be well productivity.To undertake steps that can Develop and modify frontier architectures altered to extremeenvironments.2
Project Placement Design and Implementation_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
(Doc) Self-Directed Learning
|21
|4310
|84

POG303 - Strategic Management
|13
|3462
|50

Logistics and Operations for oil and gas spring 2019 Assignment
|16
|5780
|43

Software Selection for BHP Group Ltd
|12
|2751
|91

Industrial Placement Portfolio
|14
|3974
|286

Personal Development for Leaders in MSc Procurement and Supply Chain Management
|25
|8473
|284