Renovation of Head Office of Superior Implements Discussion 2022

   

Added on  2022-10-10

14 Pages1278 Words16 Views
Leadership ManagementProfessional Development
 | 
 | 
 | 
Project Plan
for xxxx project
Prepared by:__________________________________
Date: _________________________
Renovation of Head Office of Superior Implements Discussion 2022_1

Table of Contents
PROJECT SCOPE.................................................................................................. 2
PROJECT DETAILS............................................................................................ 2
PROJECT DELIVERABLES.................................................................................. 2
ASSUMPTIONS................................................................................................. 2
CONSTRAINTS................................................................................................. 2
EXCLUSIONS.................................................................................................... 2
INCLUSIONS.................................................................................................... 2
TIME MANAGEMENT............................................................................................ 3
WORK BREAKDOWN STRUCTURE....................................................................3
GANTT CHART................................................................................................. 3
COST MANAGEMENT........................................................................................... 4
HUMAN RESOURCE MANAGEMENT.....................................................................5
COMMUNICATION MANAGEMENT PLAN..............................................................7
CHANGE MANAGEMENT PROCESS...................................................................7
RECORDS MANAGEMENT................................................................................. 7
RISK MANAGEMENT PLAN................................................................................... 8
RISK ASSESSMENT MATRIX............................................................................. 9
Authorised by:.................................................................................................. 10
Position or Title Date approved: / /20.........................................................10
BSBPMG522_AT2_Task2.2_ProjectPlan 1 | P a g e
Renovation of Head Office of Superior Implements Discussion 2022_2

PROJECT SCOPE
PROJECT DETAILS
Project Name Renovation of Head Office of Superior Implements (SIM
Co.)
Purpose The primary purpose of the project work would be based on bringing in
improvements with the help of renovation phase. The renovation within
the kitchen and bathroom would help in improving the situation of the
office.
Project Objectives The objectives of the project includes:
1. Bringing in changes within the new office structure
2. Implementing new facilities within the office
3. Renovation changes would be made within a certain period of time.
Relationship to
Organisational Objectives
The project objectives that would be in relation to the organisational
objectives would be as:
1. To improve the working conditions of the office
2. To improve the work culture of the office and employees
3. Implementation of new facilities within the office
PROJECT DELIVERABLES
Specific Change within the structure of the organisation based on bringing renovation
changes within the specific sectors of the organisation.
Measurable – Feedback would be gathered from the employees based on measuring
the success of the organisation.
Achievable – The renovation changes within the organisation would be achieved
BSBPMG522_AT2_Task2.2_ProjectPlan 2 | P a g e
Renovation of Head Office of Superior Implements Discussion 2022_3

Realistic – Every small changes within the organisation would be made as soon as
possible. They would also be achieved in within the project plan.
Timely – The specific requirement within the project would be measured in a timely
basis as per the plan described.
ASSUMPTIONS
The works of renovation within the kitchen would be completed within the deadline
The budget would be perfect for the project
CONSTRAINTS
Unavailability of resources would lead to stop of work over the project
Lack of employees during the renovation phase would lead to completion of
project after the deadlines.
EXCLUSIONS
The entire flooring would not be covered during the renovation phase
Furniture would not be renovated within the project.
INCLUSIONS
The project would incur the best contractor to decide over the project plan
The bathroom and kitchen would be renovated by including the most important
requirements that had been defined previously.
TIME MANAGEMENT
WORK BREAKDOWN STRUCTURE
BSBPMG522_AT2_Task2.2_ProjectPlan 3 | P a g e
New Software Project
1.3 Testing Phase1.2 Programming Phase1.1 Design Phase
1.1.1 First Design Phase 1.1.2 Second Design
Phase
1.1.1.2 Design Task #2
1.1.1.1 Design Task #1 1.1.2.1 Design Task
#3
1.1.2.2 Design Task
#4
1.2.1 Programming
Task #1
1.2.2 Programming
Task #2
1.3.3 Testing Task
#3
1.3.2 Testing Task
#2
1.3.1 Testing Task
#1
Renovation of Head Office of Superior Implements Discussion 2022_4

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Renovation of Head Office of Superior Implements (SIM Co.)
|12
|1935
|162

Renovation of Head Office of Superior Implements (SIM Co.)
|6
|1543
|261

Renovation of Head Office of Superior Implements (SIM Co.)
|6
|1978
|263

Project on Renovating a Kitchen Setup
|9
|2109
|264

Kitchen Renovation Project Terms of Reference
|28
|3784
|74

TASK 2.3. STATUS REPORT. Project Status Summary. Percen
|3
|448
|92