Project Planning and Design Implementation for Monet Holiday Park and Resort
VerifiedAdded on  2023/04/23
|55
|9074
|282
AI Summary
This report discusses the project planning and design implementation for Monet Holiday Park and Resort. It covers different trans-disciplinary approaches, project phase analysis and implementation, and developed skills for resolving issues. The report also provides an overview of the different actions taken and not taken.
Contribute Materials
Your contribution can guide someone’s learning journey. Share your
documents today.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/81bdac29-c54d-4a99-b3d4-07e630d87e15-page-1.webp)
Running head: PROJECT PLANNING AND DESIGN IMPLEMENTATION
Project planning and Design Implementation
[Name of the Student]
[Name of the University]
[Author note]
Project planning and Design Implementation
[Name of the Student]
[Name of the University]
[Author note]
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/01441682-682b-4e53-967f-95971590566e-page-2.webp)
1PROJECT PLANNING AND DESIGN IMPLEMENTATION
Table of Contents
Introduction:....................................................................................................................................4
Project background and context:.....................................................................................................4
Different Trans-disciplinary approaches:........................................................................................6
Project phase analysis and implementation, preparation and evaluation of the efficiencies:..........7
Developed skills for Resolving of the issues:..................................................................................9
Leaderships:.................................................................................................................................9
Communication:..........................................................................................................................9
Planning skills:...........................................................................................................................10
Time management:....................................................................................................................10
Adaptability:..............................................................................................................................10
Solving of problems:..................................................................................................................10
Organization:.............................................................................................................................11
Actions to be taken and not to be taken:....................................................................................11
Creation of register:...................................................................................................................11
Lodging the problems:...............................................................................................................11
Activity assigning:.....................................................................................................................11
Monitoring:................................................................................................................................12
Non-involvement of the corporate issues:.................................................................................12
Improper management of the team issues:................................................................................12
Table of Contents
Introduction:....................................................................................................................................4
Project background and context:.....................................................................................................4
Different Trans-disciplinary approaches:........................................................................................6
Project phase analysis and implementation, preparation and evaluation of the efficiencies:..........7
Developed skills for Resolving of the issues:..................................................................................9
Leaderships:.................................................................................................................................9
Communication:..........................................................................................................................9
Planning skills:...........................................................................................................................10
Time management:....................................................................................................................10
Adaptability:..............................................................................................................................10
Solving of problems:..................................................................................................................10
Organization:.............................................................................................................................11
Actions to be taken and not to be taken:....................................................................................11
Creation of register:...................................................................................................................11
Lodging the problems:...............................................................................................................11
Activity assigning:.....................................................................................................................11
Monitoring:................................................................................................................................12
Non-involvement of the corporate issues:.................................................................................12
Improper management of the team issues:................................................................................12
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/edce48d1-e041-40c9-8c17-c48fa8d558b2-page-3.webp)
2PROJECT PLANNING AND DESIGN IMPLEMENTATION
Assurance related to low risk:....................................................................................................12
Issues related to communication:...............................................................................................12
Project learning:.............................................................................................................................13
Conclusion:....................................................................................................................................13
References:....................................................................................................................................14
Appendix:......................................................................................................................................16
Formal Minutes of Group Meetings..............................................................................................16
Formal Minutes of Group Meetings..............................................................................................18
Formal Minutes of Group Meetings..............................................................................................20
Formal Minutes of Group Meetings..............................................................................................22
Formal Minutes of Group Meetings..............................................................................................23
Formal Minutes of Group Meetings..............................................................................................24
Formal Minutes of Group Meetings..............................................................................................26
Formal Minutes of Group Meetings..............................................................................................27
Formal Minutes of Group Meetings..............................................................................................28
Weekly Learning Log....................................................................................................................30
Weekly Learning Log....................................................................................................................31
Weekly Learning Log....................................................................................................................33
Weekly Learning Log....................................................................................................................34
Weekly Learning Log....................................................................................................................35
Assurance related to low risk:....................................................................................................12
Issues related to communication:...............................................................................................12
Project learning:.............................................................................................................................13
Conclusion:....................................................................................................................................13
References:....................................................................................................................................14
Appendix:......................................................................................................................................16
Formal Minutes of Group Meetings..............................................................................................16
Formal Minutes of Group Meetings..............................................................................................18
Formal Minutes of Group Meetings..............................................................................................20
Formal Minutes of Group Meetings..............................................................................................22
Formal Minutes of Group Meetings..............................................................................................23
Formal Minutes of Group Meetings..............................................................................................24
Formal Minutes of Group Meetings..............................................................................................26
Formal Minutes of Group Meetings..............................................................................................27
Formal Minutes of Group Meetings..............................................................................................28
Weekly Learning Log....................................................................................................................30
Weekly Learning Log....................................................................................................................31
Weekly Learning Log....................................................................................................................33
Weekly Learning Log....................................................................................................................34
Weekly Learning Log....................................................................................................................35
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/91d77278-1cca-422b-bad4-6e25107a8f0c-page-4.webp)
3PROJECT PLANNING AND DESIGN IMPLEMENTATION
Critical Incident Log Sheet............................................................................................................37
Critical Incident Log Sheet............................................................................................................37
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/d1e66681-a964-4bb0-b85e-d6f0994e1d7e-page-5.webp)
4PROJECT PLANNING AND DESIGN IMPLEMENTATION
Introduction:
Monet Holiday Park and resort is one of the famous holiday destination and this can
include the various type of entertainment spots such as theaters, swimming pools, takeaways,
restaurants, amusement parks, bars, activities and accommodations. Besides this the Monet
Holiday park is also seen to be associated with including other sites such as the Monet Garden
and house which is situated in Giverny, this a small village located external to Vernon. This
location is situated near the main city of Paris and generally requires one hour to reach the
destination from the city. The entire project has been associated with demonstrating the project
placement and the implementation of the design of the Monet Holiday Park.
The report is also associated with demonstrating the different trans-disciplinary theories
and models which have been discussed so as to under-pin the entire analysis. In addition to this
the report has also presented the different phases of the project which ranges from the process of
preparing to the deployment along with involving the effectiveness evaluation. Besides all this,
in order to resolve all the problems different kind of skills which have been developed by means
of the evaluating the different processes. Lastly the report also provides a brief overview of the
different actions which are taken and which would not be taken along with the analysis and
assessing of the actions.
Project background and context:
Designing and implementation of the project is seen to be very helpful in understanding
the scopes related to the development of skills so as to have an effective decision making. The
implementation is also very helpful in the process of integrating the communication along with
being helpful in solving of the different kind of problems by making use of the knowledge and
Introduction:
Monet Holiday Park and resort is one of the famous holiday destination and this can
include the various type of entertainment spots such as theaters, swimming pools, takeaways,
restaurants, amusement parks, bars, activities and accommodations. Besides this the Monet
Holiday park is also seen to be associated with including other sites such as the Monet Garden
and house which is situated in Giverny, this a small village located external to Vernon. This
location is situated near the main city of Paris and generally requires one hour to reach the
destination from the city. The entire project has been associated with demonstrating the project
placement and the implementation of the design of the Monet Holiday Park.
The report is also associated with demonstrating the different trans-disciplinary theories
and models which have been discussed so as to under-pin the entire analysis. In addition to this
the report has also presented the different phases of the project which ranges from the process of
preparing to the deployment along with involving the effectiveness evaluation. Besides all this,
in order to resolve all the problems different kind of skills which have been developed by means
of the evaluating the different processes. Lastly the report also provides a brief overview of the
different actions which are taken and which would not be taken along with the analysis and
assessing of the actions.
Project background and context:
Designing and implementation of the project is seen to be very helpful in understanding
the scopes related to the development of skills so as to have an effective decision making. The
implementation is also very helpful in the process of integrating the communication along with
being helpful in solving of the different kind of problems by making use of the knowledge and
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/a5cf9707-03cb-4b14-bc4c-0bdf2181de57-page-6.webp)
5PROJECT PLANNING AND DESIGN IMPLEMENTATION
the skills which are seen to be generated in the different units under the program so as to finish
the realistic projects.
For the purpose of understanding the ways of designing the project it has been divided
into two parts so as to be implemented. The part of the project of the project is associated with
dealing with the place of entry where people would be capable of entering by means of the ticker
gift or the office shop (Heagney 2016). Besides this the garden which Monet Park is having is a
cottage style garden which is also known as the Clos Normand and this in turn is associated with
oil presentation of the house of Monet and the gardens are seen to be bursting with the summer
colors. Different kind of flowers are present in the garden which include the roses, salvias,
foxgloves and many more are some of the beautiful flowers which are presenting the full bloom
of the park.
The Monet park house is consisting of a pretty as well as a two-story building which is
printed in pink color and is trimmed by making use of different green colored shutters. The
sitting room is painted in blue and the dining room is painted yellow whereas the kitchen wall as
the consisting of tiles consisting of Rouen which is not the taste of everyone. The entire project
has been discussed along with the disciplined program and the project management practice of
the Monet holiday park by having an overall appreciation of the purposes and the nature of the
project (Schwalbe 2015). under the concept of development there is also a need of examining the
practices along with the principles of the project appraisal techniques and the preparations,
designs as well as the planning’s which are needs to be examined. In addition to all this there is
also an essential need of evaluating the methods and the theories of the skills related to the
management of the programs and the project management and this concentrates upon the hard as
well as upon the soft skills related to the successful implementation of the project.
the skills which are seen to be generated in the different units under the program so as to finish
the realistic projects.
For the purpose of understanding the ways of designing the project it has been divided
into two parts so as to be implemented. The part of the project of the project is associated with
dealing with the place of entry where people would be capable of entering by means of the ticker
gift or the office shop (Heagney 2016). Besides this the garden which Monet Park is having is a
cottage style garden which is also known as the Clos Normand and this in turn is associated with
oil presentation of the house of Monet and the gardens are seen to be bursting with the summer
colors. Different kind of flowers are present in the garden which include the roses, salvias,
foxgloves and many more are some of the beautiful flowers which are presenting the full bloom
of the park.
The Monet park house is consisting of a pretty as well as a two-story building which is
printed in pink color and is trimmed by making use of different green colored shutters. The
sitting room is painted in blue and the dining room is painted yellow whereas the kitchen wall as
the consisting of tiles consisting of Rouen which is not the taste of everyone. The entire project
has been discussed along with the disciplined program and the project management practice of
the Monet holiday park by having an overall appreciation of the purposes and the nature of the
project (Schwalbe 2015). under the concept of development there is also a need of examining the
practices along with the principles of the project appraisal techniques and the preparations,
designs as well as the planning’s which are needs to be examined. In addition to all this there is
also an essential need of evaluating the methods and the theories of the skills related to the
management of the programs and the project management and this concentrates upon the hard as
well as upon the soft skills related to the successful implementation of the project.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/aa9c131d-c369-48db-bba9-9bd53b0845ea-page-7.webp)
6PROJECT PLANNING AND DESIGN IMPLEMENTATION
Different Trans-disciplinary approaches:
The Socio-technical system theory is seen to be consisting of multiple systems which are
generally required for the purpose of adopting so as to fetch the organization. The model is
generally represented by means of the hexagon. This is seen to be existing at the heart of
thinking. Different interacting sub-systems are responsible for making the socio-technical system
of Monet Holiday park. This is the way in which it is possible for the project to become capable
of implementation of the individuals who are having the capability of working so as to achieve
the goals so as to have a smart process by making use of the intelligent technologies. For this
reason they would become capable of operating under the physical infrastructure along with
sharing the particular cultural norms as well as the assumptions.
The theory related to the social-technique is associated with consisting of the central idea
which is associated with helping in understanding the performance and the design of the Monet
Holiday parks system. This can be developed as technical as well as social elements can be put
together which can be treated an interdependent part of the entire system which is very
complicated (Kerzner and Kerzner 2017). However in this case any of the change program that
the organization is having might fail. The reason behind this is that they are mainly seen to be
focused highly upon one of the aspect of the system which commonly includes the technology.
This in turn might be leading to failure in the process of examining along with helping in
knowing the interdependencies which are very complicated and have been presented. But still
there exists few individuals who are having the capability of analyzing each and every aspect of
the interdependency which are related to the intricate systems which has been working. This is
seen to be very much true for the organizational system that the Monet Holiday Park is having.
In addition to this the entire development along with understanding the needs of the inputs acts
Different Trans-disciplinary approaches:
The Socio-technical system theory is seen to be consisting of multiple systems which are
generally required for the purpose of adopting so as to fetch the organization. The model is
generally represented by means of the hexagon. This is seen to be existing at the heart of
thinking. Different interacting sub-systems are responsible for making the socio-technical system
of Monet Holiday park. This is the way in which it is possible for the project to become capable
of implementation of the individuals who are having the capability of working so as to achieve
the goals so as to have a smart process by making use of the intelligent technologies. For this
reason they would become capable of operating under the physical infrastructure along with
sharing the particular cultural norms as well as the assumptions.
The theory related to the social-technique is associated with consisting of the central idea
which is associated with helping in understanding the performance and the design of the Monet
Holiday parks system. This can be developed as technical as well as social elements can be put
together which can be treated an interdependent part of the entire system which is very
complicated (Kerzner and Kerzner 2017). However in this case any of the change program that
the organization is having might fail. The reason behind this is that they are mainly seen to be
focused highly upon one of the aspect of the system which commonly includes the technology.
This in turn might be leading to failure in the process of examining along with helping in
knowing the interdependencies which are very complicated and have been presented. But still
there exists few individuals who are having the capability of analyzing each and every aspect of
the interdependency which are related to the intricate systems which has been working. This is
seen to be very much true for the organizational system that the Monet Holiday Park is having.
In addition to this the entire development along with understanding the needs of the inputs acts
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/2f6f98fb-dfe0-4a2e-8d0d-5bc234b89dfe-page-8.webp)
7PROJECT PLANNING AND DESIGN IMPLEMENTATION
as the primary stakeholder. This in turn is also associated involving those who are having the
capability of working under different required parts of the system (Larson and Gray 2017). The
present case of the project design and implementation along with the user participation is seen to
pre-requisite for the systematic analysis and the changes. So the users can be defined widely as
the one who are associated with involving all the primary stakeholder. There exists numerous
benefits of using the socio-technical theory approach and the major advantages have been listed
below:
ï‚· Increased scope of development in a successful way
ï‚· The analysis would be done in a more comprehensive way related to the ways of
development of the systems.
ï‚· Helping in understanding the overall system practically along with the evaluation of the
ways by which the overall system is seen to be working
ï‚· Providing of dependable as well as valid information which are helpful in the
development of an agreement.
ï‚· Engagement in a strong manner.
Project phase analysis and implementation, preparation and evaluation of the efficiencies:
Numerous procedures as well as definitions exists related to the providing of a clear
definition for the different type of activities. There also exists the approval of the administration
which is provided by the different competent authorities in different steps included in the process
of the project deployment process. These are generally needed for the purpose of successful
running of the project program in the Monet Holiday Park. In addition to this the streamlined
processes would also be capable of declining the different uncertainties existing in the different
steps of getting approval for the project and for the development as well (Fleming and
as the primary stakeholder. This in turn is also associated involving those who are having the
capability of working under different required parts of the system (Larson and Gray 2017). The
present case of the project design and implementation along with the user participation is seen to
pre-requisite for the systematic analysis and the changes. So the users can be defined widely as
the one who are associated with involving all the primary stakeholder. There exists numerous
benefits of using the socio-technical theory approach and the major advantages have been listed
below:
ï‚· Increased scope of development in a successful way
ï‚· The analysis would be done in a more comprehensive way related to the ways of
development of the systems.
ï‚· Helping in understanding the overall system practically along with the evaluation of the
ways by which the overall system is seen to be working
ï‚· Providing of dependable as well as valid information which are helpful in the
development of an agreement.
ï‚· Engagement in a strong manner.
Project phase analysis and implementation, preparation and evaluation of the efficiencies:
Numerous procedures as well as definitions exists related to the providing of a clear
definition for the different type of activities. There also exists the approval of the administration
which is provided by the different competent authorities in different steps included in the process
of the project deployment process. These are generally needed for the purpose of successful
running of the project program in the Monet Holiday Park. In addition to this the streamlined
processes would also be capable of declining the different uncertainties existing in the different
steps of getting approval for the project and for the development as well (Fleming and
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/82c76d03-0079-4919-bcd4-1f86ae79865a-page-9.webp)
8PROJECT PLANNING AND DESIGN IMPLEMENTATION
Koppelman 2016). This is seen to be very much useful in the process of decreasing the cost
related to the transaction of the project.
In addition to the different details related to the tasks at different steps of the project
implementation and the developments have been discussed. This is firstly associated with
including the project identification. This is associated with including the in-house arrangements
which are seen to have a preparatory nature. This is followed by the conceptual structure of the
project. in addition there also exists the intelligence due intelligence which is mainly associated
with including the in-house capacities, additional departments, government policies and the
regulatory and the legal frameworks (Heagney 2016). The strategy related to the project
deployment is also there along with setting of the entire project committees. Besides all this there
is a need of getting an approval of the government along with the appointment of the transaction
advisors.
The due diligence and the development of the project also needs to be considered and this
would be associated with involving the plans related to finance, the preliminary finance plans
and the government approvals along with the independent credit ratings whenever they are
required (Walker 2015). This is followed by the essential terms of the contracts as well as the
outputs and the service specifications along with the support of the government and the business
models which are also involved. This mainly includes the feasibility of the project, the analysis
of the risks, value for money and the financing.
Thirdly there exists the implementation of the arrangement bands of the processes
included in the pre-procurement (Harrison and Lock 2017). This is associated with including the
criteria for bidding of the evaluation and the committees which is particularly associated with
involving the issues such as the promotion of the investment, acquisition of land, foreign
Koppelman 2016). This is seen to be very much useful in the process of decreasing the cost
related to the transaction of the project.
In addition to the different details related to the tasks at different steps of the project
implementation and the developments have been discussed. This is firstly associated with
including the project identification. This is associated with including the in-house arrangements
which are seen to have a preparatory nature. This is followed by the conceptual structure of the
project. in addition there also exists the intelligence due intelligence which is mainly associated
with including the in-house capacities, additional departments, government policies and the
regulatory and the legal frameworks (Heagney 2016). The strategy related to the project
deployment is also there along with setting of the entire project committees. Besides all this there
is a need of getting an approval of the government along with the appointment of the transaction
advisors.
The due diligence and the development of the project also needs to be considered and this
would be associated with involving the plans related to finance, the preliminary finance plans
and the government approvals along with the independent credit ratings whenever they are
required (Walker 2015). This is followed by the essential terms of the contracts as well as the
outputs and the service specifications along with the support of the government and the business
models which are also involved. This mainly includes the feasibility of the project, the analysis
of the risks, value for money and the financing.
Thirdly there exists the implementation of the arrangement bands of the processes
included in the pre-procurement (Harrison and Lock 2017). This is associated with including the
criteria for bidding of the evaluation and the committees which is particularly associated with
involving the issues such as the promotion of the investment, acquisition of land, foreign
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/7a77a837-4ecf-4dd2-ac08-a194b7ff59b4-page-10.webp)
9PROJECT PLANNING AND DESIGN IMPLEMENTATION
exchange for the Monet Holiday Park (Kerzner 2018). In addition to this there is also the drafts
for the contracts, documents related to bidding and the deployment arrangements.
Followed by this is the procurement which is associated with including the pre-
qualification that the bidders are having along with the market sounding (Turner 2016). There is
also a requirement of the RPF such as the finalization of the outputs and the specifications of the
service which is including the final tender along with the selection and the evaluation of the bids.
Lastly exists the contract management and the awards and this is associated with
involving the awards related to the contract along with the signing of the contracts and the final
closure. In addition to all this there exists the management of the delivery, management of
relationship and the compliances of the contract (Verzuh 2015). Followed by this is the
management of the relationship and the renegotiations which are required and finally comes the
resolution for the dispute and for that reason the dispute resolution team works and certain
processes are established for this.
Developed skills for Resolving of the issues:
There exists different kind of skills which have been developed and is associated with
including the following:
Leaderships:
This is helpful in the process of managing and leading the teams and for doing so
different activities have been learnt.
Communication:
Making of strong communications have been learnt along with being understood and the
huge amount of connection acts as the main crux of the relationship (Binder 2016). So it can be
exchange for the Monet Holiday Park (Kerzner 2018). In addition to this there is also the drafts
for the contracts, documents related to bidding and the deployment arrangements.
Followed by this is the procurement which is associated with including the pre-
qualification that the bidders are having along with the market sounding (Turner 2016). There is
also a requirement of the RPF such as the finalization of the outputs and the specifications of the
service which is including the final tender along with the selection and the evaluation of the bids.
Lastly exists the contract management and the awards and this is associated with
involving the awards related to the contract along with the signing of the contracts and the final
closure. In addition to all this there exists the management of the delivery, management of
relationship and the compliances of the contract (Verzuh 2015). Followed by this is the
management of the relationship and the renegotiations which are required and finally comes the
resolution for the dispute and for that reason the dispute resolution team works and certain
processes are established for this.
Developed skills for Resolving of the issues:
There exists different kind of skills which have been developed and is associated with
including the following:
Leaderships:
This is helpful in the process of managing and leading the teams and for doing so
different activities have been learnt.
Communication:
Making of strong communications have been learnt along with being understood and the
huge amount of connection acts as the main crux of the relationship (Binder 2016). So it can be
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/b2b7dd0a-f28c-473d-8832-0a78fd3923ed-page-11.webp)
10PROJECT PLANNING AND DESIGN IMPLEMENTATION
stated that the efficiency of the interaction is having an impact upon the project team as well as
upon the clients and stakeholders.
Planning skills:
This is the central skill which includes the capability related to organizing of the tasks
properly and this is one of the most essential part which the project manager should have.
However this is very complicated. But the process of providing the serious attention to the
schedule is also understood (Kerzner 2019). Planning helps in organization of the activities so as
to have accurate results and this is one of the essential part of the project manager’s job.
Complication is very high and so requires high attention.
Time management:
This is associated with including the determination and the ways of communicating the
ways by which the peoples are associated with usage of time for the different work (Milosevic
and Martinelli 2016). This is equally vital as this helps in managing the time.
Adaptability:
This generally refers to the ability of adopting the latest technologies as well as the
standards rapidly so as to eliminate any kind of future risks. The capability related to adaptation
of the works and the changes within the team is seen to very helpful in the process of learning
the ways of overcoming the different kind of issues.
Solving of problems:
The risks are searched throughout the entire project along with searching for the ways of
mitigating the risks which are determined.
stated that the efficiency of the interaction is having an impact upon the project team as well as
upon the clients and stakeholders.
Planning skills:
This is the central skill which includes the capability related to organizing of the tasks
properly and this is one of the most essential part which the project manager should have.
However this is very complicated. But the process of providing the serious attention to the
schedule is also understood (Kerzner 2019). Planning helps in organization of the activities so as
to have accurate results and this is one of the essential part of the project manager’s job.
Complication is very high and so requires high attention.
Time management:
This is associated with including the determination and the ways of communicating the
ways by which the peoples are associated with usage of time for the different work (Milosevic
and Martinelli 2016). This is equally vital as this helps in managing the time.
Adaptability:
This generally refers to the ability of adopting the latest technologies as well as the
standards rapidly so as to eliminate any kind of future risks. The capability related to adaptation
of the works and the changes within the team is seen to very helpful in the process of learning
the ways of overcoming the different kind of issues.
Solving of problems:
The risks are searched throughout the entire project along with searching for the ways of
mitigating the risks which are determined.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/bb8fb808-8bb5-4e21-9c4c-abe3d0190363-page-12.webp)
11PROJECT PLANNING AND DESIGN IMPLEMENTATION
Organization:
Starting from the task prioritization and conceptualization of the projects it is possible to
avoid any kind of confusions, in addition to this the elements in the organization process has also
been included in each and every step for envision (Lock 2017). This is present in the entire
project life cycle so as to the rising issues.
Actions to be taken and not to be taken:
In order to design the and implement the entire project of the Monet Holiday Park
different activities have been considered along with activities which have not been considered
and this includes the following:
Creation of register:
This is where it is possible for anyone to register the project and the registering of the
project should be consisting of multiple sub-projects, along with the timesheets, products and
other information (Kerzner 2017). This is seen to be very useful in the process of utilizing the
project register so as to control the cost or revenue.
Lodging the problems:
This is associated with including the documentation aspects of the project and is
associated with including the ongoing along with the shutdown issues.
Activity assigning:
This is included in the scheduling phase which is associated with including a distinct start
and end point and distribution of the tasks so as to complete the entire project.
Organization:
Starting from the task prioritization and conceptualization of the projects it is possible to
avoid any kind of confusions, in addition to this the elements in the organization process has also
been included in each and every step for envision (Lock 2017). This is present in the entire
project life cycle so as to the rising issues.
Actions to be taken and not to be taken:
In order to design the and implement the entire project of the Monet Holiday Park
different activities have been considered along with activities which have not been considered
and this includes the following:
Creation of register:
This is where it is possible for anyone to register the project and the registering of the
project should be consisting of multiple sub-projects, along with the timesheets, products and
other information (Kerzner 2017). This is seen to be very useful in the process of utilizing the
project register so as to control the cost or revenue.
Lodging the problems:
This is associated with including the documentation aspects of the project and is
associated with including the ongoing along with the shutdown issues.
Activity assigning:
This is included in the scheduling phase which is associated with including a distinct start
and end point and distribution of the tasks so as to complete the entire project.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/211b62c9-a70e-4ad3-9337-910fe0e24de7-page-13.webp)
12PROJECT PLANNING AND DESIGN IMPLEMENTATION
Monitoring:
This involves the tracking of the entire project as well as the team members so as to
control the different aspects of the project and is involving the controlling of the different project
elements (Sears et al. 2015).
Non-involvement of the corporate issues:
The failure of the project might occur because of the organizational issues. This is
associated with defining the risks which have still not been encountered or something which has
already occurred.
Improper management of the team issues:
This might be occurring because of the lack of trust or due to poor change management.
Some of the other reasons include the lack of long term thinking and low transparency along
with the non-sharing of the data with the tension (Nicholas and Steyn 2017).
Assurance related to low risk:
Associated with including the different aspects where the first one is the market risk
followed by the longevity risk, concentration risk, inflation risk, reinvestment risk, horizon risk
and lastly the credit risk.
Issues related to communication:
This is associated with including the reviewing of the states which are consistent for the
team along with the arranging of meetings in a regular way which is followed by eth discussion
and summary for calling the inputs (Heldman 2018).
Monitoring:
This involves the tracking of the entire project as well as the team members so as to
control the different aspects of the project and is involving the controlling of the different project
elements (Sears et al. 2015).
Non-involvement of the corporate issues:
The failure of the project might occur because of the organizational issues. This is
associated with defining the risks which have still not been encountered or something which has
already occurred.
Improper management of the team issues:
This might be occurring because of the lack of trust or due to poor change management.
Some of the other reasons include the lack of long term thinking and low transparency along
with the non-sharing of the data with the tension (Nicholas and Steyn 2017).
Assurance related to low risk:
Associated with including the different aspects where the first one is the market risk
followed by the longevity risk, concentration risk, inflation risk, reinvestment risk, horizon risk
and lastly the credit risk.
Issues related to communication:
This is associated with including the reviewing of the states which are consistent for the
team along with the arranging of meetings in a regular way which is followed by eth discussion
and summary for calling the inputs (Heldman 2018).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/ca8c8f4d-93fb-4b6b-8ce3-ac22a858904d-page-14.webp)
13PROJECT PLANNING AND DESIGN IMPLEMENTATION
Project learning:
One of the most important asset of the project for the Monet Holiday Park is the human
resources. The entire study would be helping in the learning of various kind of motivation so as
to stay in the lead. Along with this the different strategies related to marketing, finance and many
more would also be understood from this study. In addition to all this the primary aspect of the
project is also understandable which mainly includes the quality assurances, product
development and analysis, capacity planning. The ways of competing and developing the
competing advantages have also been presented clearly. Various kind of business practices are
associated with indicating the differences which is seen to be existing between the failure and
success is also presented so as to be understood.
Conclusion:
The entire study helps in considering the sustainability of the strategy related to the
project deployment. This is done for the purpose of gaining the outcomes on the ground. This
mainly takes place along with the expectation of the targeted group. In addition to this the
implementation of the progress is essentially to be reviewed against the indicators along with the
targets which are defined in the final outcome of the framework along with the planning for
doing the work yearly. Besides this the Monet Holiday Park should also be associated with
considering the changes taking place in cases which are foreseen in the process of designing.
This is mainly aimed at the determination of the constraints as well as issues.
Project learning:
One of the most important asset of the project for the Monet Holiday Park is the human
resources. The entire study would be helping in the learning of various kind of motivation so as
to stay in the lead. Along with this the different strategies related to marketing, finance and many
more would also be understood from this study. In addition to all this the primary aspect of the
project is also understandable which mainly includes the quality assurances, product
development and analysis, capacity planning. The ways of competing and developing the
competing advantages have also been presented clearly. Various kind of business practices are
associated with indicating the differences which is seen to be existing between the failure and
success is also presented so as to be understood.
Conclusion:
The entire study helps in considering the sustainability of the strategy related to the
project deployment. This is done for the purpose of gaining the outcomes on the ground. This
mainly takes place along with the expectation of the targeted group. In addition to this the
implementation of the progress is essentially to be reviewed against the indicators along with the
targets which are defined in the final outcome of the framework along with the planning for
doing the work yearly. Besides this the Monet Holiday Park should also be associated with
considering the changes taking place in cases which are foreseen in the process of designing.
This is mainly aimed at the determination of the constraints as well as issues.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/8ffb3f69-d35b-44b4-9f59-9281ea415c0c-page-15.webp)
14PROJECT PLANNING AND DESIGN IMPLEMENTATION
References:
Binder, J., 2016. Global project management: communication, collaboration and management
across borders. Routledge.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Heagney, J., 2016. Fundamentals of project management. Amacom.
Heldman, K., 2018. Project management jumpstart. John Wiley & Sons.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
Kerzner, H., 2019. Using the project management maturity model: strategic planning for project
management. Wiley.
Larson, E.W. and Gray, C.F., 2017. Project management: The managerial process. McGraw-Hill
Education.
Lock, D., 2017. The essentials of project management. Routledge.
References:
Binder, J., 2016. Global project management: communication, collaboration and management
across borders. Routledge.
Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management.
Project Management Institute.
Harrison, F. and Lock, D., 2017. Advanced project management: a structured approach.
Routledge.
Heagney, J., 2016. Fundamentals of project management. Amacom.
Heldman, K., 2018. Project management jumpstart. John Wiley & Sons.
Kerzner, H. and Kerzner, H.R., 2017. Project management: a systems approach to planning,
scheduling, and controlling. John Wiley & Sons.
Kerzner, H., 2017. Project management metrics, KPIs, and dashboards: a guide to measuring
and monitoring project performance. John Wiley & Sons.
Kerzner, H., 2018. Project management best practices: Achieving global excellence. John Wiley
& Sons.
Kerzner, H., 2019. Using the project management maturity model: strategic planning for project
management. Wiley.
Larson, E.W. and Gray, C.F., 2017. Project management: The managerial process. McGraw-Hill
Education.
Lock, D., 2017. The essentials of project management. Routledge.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/c2991d69-4395-4f30-9c7a-b49a6705a8db-page-16.webp)
15PROJECT PLANNING AND DESIGN IMPLEMENTATION
Milosevic, D.Z. and Martinelli, R.J., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Routledge.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015. Construction
project management. John Wiley & Sons.
Turner, R., 2016. Gower handbook of project management. Routledge.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Milosevic, D.Z. and Martinelli, R.J., 2016. Project management toolbox: tools and techniques
for the practicing project manager. John Wiley & Sons.
Nicholas, J.M. and Steyn, H., 2017. Project management for engineering, business and
technology. Routledge.
Schwalbe, K., 2015. Information technology project management. Cengage Learning.
Sears, S.K., Sears, G.A., Clough, R.H., Rounds, J.L. and Segner, R.O., 2015. Construction
project management. John Wiley & Sons.
Turner, R., 2016. Gower handbook of project management. Routledge.
Verzuh, E., 2015. The fast forward MBA in project management. John Wiley & Sons.
Walker, A., 2015. Project management in construction. John Wiley & Sons.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/61b106ce-b894-4c3d-9208-e5296007d3c4-page-17.webp)
16PROJECT PLANNING AND DESIGN IMPLEMENTATION
Appendix:
TASK1
Learning Contract Level 5 Project
Section 1: Student and course details
Name:
Tutor:
Project/Placement name:
DESIGN AND IMPLEMENTATION
SPRING 2019/ PPDI5039
Section 2: Focus
Aim/Problem Statement
The platform is to gain Industries experience in areal business work related world
or skills learnt through classroom experience. For example: Time management, soft
skills working in a group, problem solving, decision-making, communication skills,
leadership skills, team skills, research skills, marketing, skills and budgeting skills.
Learning contract is generally associated with referring to the process of drawing
up of the students in the consultation with the instructor so as to specify how and what
Appendix:
TASK1
Learning Contract Level 5 Project
Section 1: Student and course details
Name:
Tutor:
Project/Placement name:
DESIGN AND IMPLEMENTATION
SPRING 2019/ PPDI5039
Section 2: Focus
Aim/Problem Statement
The platform is to gain Industries experience in areal business work related world
or skills learnt through classroom experience. For example: Time management, soft
skills working in a group, problem solving, decision-making, communication skills,
leadership skills, team skills, research skills, marketing, skills and budgeting skills.
Learning contract is generally associated with referring to the process of drawing
up of the students in the consultation with the instructor so as to specify how and what
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/d6f0acea-f8fb-49a5-b11f-794678f258ce-page-18.webp)
17PROJECT PLANNING AND DESIGN IMPLEMENTATION
the student would be learning (Wang et al.2019). The main aim of the learning contract is
associated with including providing encouragements to the individual learning by means
of the providing educational experience training to the students objectives.
This case study would be needing the completion of the new business setup
along with the management of the entire business (Drachsler and Greller 2016). Despite of
having the leadership qualities along with the good communication skills and the skills
related to effective time management, the learning contract prepared by me would be
associated with enhancing the other skills as well.
The objectives specified in the learning contract is only achievable if I would be
associated with using the different kind of theories along with the weekly logs and the
other information which are vital for the purpose of measuring the success and for
achieving the main aims.
Learning Outcomes
As a result of this project I am able:
1. Build a portfolio of evidence using a range of methodologies and activities (log
books; critical incident diaries; employer or supervisor feedback).
2. Identify and articulate the development of work related skills mapped to evidence
drawn from either the project or placement.
3. Demonstrate knowledge and understanding of the background and context
relative to the chosen project or placement opportunity.
the student would be learning (Wang et al.2019). The main aim of the learning contract is
associated with including providing encouragements to the individual learning by means
of the providing educational experience training to the students objectives.
This case study would be needing the completion of the new business setup
along with the management of the entire business (Drachsler and Greller 2016). Despite of
having the leadership qualities along with the good communication skills and the skills
related to effective time management, the learning contract prepared by me would be
associated with enhancing the other skills as well.
The objectives specified in the learning contract is only achievable if I would be
associated with using the different kind of theories along with the weekly logs and the
other information which are vital for the purpose of measuring the success and for
achieving the main aims.
Learning Outcomes
As a result of this project I am able:
1. Build a portfolio of evidence using a range of methodologies and activities (log
books; critical incident diaries; employer or supervisor feedback).
2. Identify and articulate the development of work related skills mapped to evidence
drawn from either the project or placement.
3. Demonstrate knowledge and understanding of the background and context
relative to the chosen project or placement opportunity.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/e92140a3-99cf-475d-b020-40cb5eae5a86-page-19.webp)
18PROJECT PLANNING AND DESIGN IMPLEMENTATION
4. Evaluate the effectiveness of preparation and planning undertaken prior to the
placement or project implementation.
Section 3: Justification
The skills which I need to poses would be acting as a very important factor
for the project some of the skills which I necessarily need to have are listed
below:
Communication skills: There is a need of having good communication for the
purpose of conducting the project successfully and for the purpose of delivering and
receiving the information in quick and accurate manner.
Leadership skills: The leadership skills which I am having would not only be
helping me in showing the good interpersonal skills which I am having but would also be
helping in showing the fact that I am having the ability of co-ordinating, motivating and
shaping the entire team (Cunningham, 2017).
4. Evaluate the effectiveness of preparation and planning undertaken prior to the
placement or project implementation.
Section 3: Justification
The skills which I need to poses would be acting as a very important factor
for the project some of the skills which I necessarily need to have are listed
below:
Communication skills: There is a need of having good communication for the
purpose of conducting the project successfully and for the purpose of delivering and
receiving the information in quick and accurate manner.
Leadership skills: The leadership skills which I am having would not only be
helping me in showing the good interpersonal skills which I am having but would also be
helping in showing the fact that I am having the ability of co-ordinating, motivating and
shaping the entire team (Cunningham, 2017).
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/c9aa1e4a-26cb-4de3-a3d7-94f06bdd4565-page-20.webp)
19PROJECT PLANNING AND DESIGN IMPLEMENTATION
Decision making skill: The ability which I am having so as to take quick decisions
and it is essentially to be made sure that this decision is also good with respect to the
limited time so as to execute the entire project.
Time management skills: The time management skill would be helping me in
accomplishment of the entire project in much shorter time period.
Section 4: Methods
I have chosen the Project manager role for the project Monet Holiday Park
because my future goal is to be employed as a project manager. In addition I will gain
the knowledge of the role of a Project manager. The project will enhance my
professional development example: communication, identifying being perceptive-
ethically, documenting agenda and minutes and evidence of the project report thru
classroom experience. Students have been allocated into groups after we done the
online assessment the lecture advice the students to complete. There is a 3 hours
lecture and tutorial in the university. Then there a unsupervised meeting with the group.
We arranged the time that we will have group meetings to discuss the Monet Holiday
Park Project. We also use social media Whats up to communicate with each other.
I have been associated with choosing the case study as the basic pathway and
the reasons have been listed below due to which I have been associated with choosing
the case study.
ï‚· This helps me in the reconstruction of the existing scenario or the history of the
analysis
Decision making skill: The ability which I am having so as to take quick decisions
and it is essentially to be made sure that this decision is also good with respect to the
limited time so as to execute the entire project.
Time management skills: The time management skill would be helping me in
accomplishment of the entire project in much shorter time period.
Section 4: Methods
I have chosen the Project manager role for the project Monet Holiday Park
because my future goal is to be employed as a project manager. In addition I will gain
the knowledge of the role of a Project manager. The project will enhance my
professional development example: communication, identifying being perceptive-
ethically, documenting agenda and minutes and evidence of the project report thru
classroom experience. Students have been allocated into groups after we done the
online assessment the lecture advice the students to complete. There is a 3 hours
lecture and tutorial in the university. Then there a unsupervised meeting with the group.
We arranged the time that we will have group meetings to discuss the Monet Holiday
Park Project. We also use social media Whats up to communicate with each other.
I have been associated with choosing the case study as the basic pathway and
the reasons have been listed below due to which I have been associated with choosing
the case study.
ï‚· This helps me in the reconstruction of the existing scenario or the history of the
analysis
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/9efc3789-9f92-4b2a-b044-109be12c00bb-page-21.webp)
20PROJECT PLANNING AND DESIGN IMPLEMENTATION
ï‚· This is associated with helping me in allowing to conduct the investigation upon the
subject or the topic in a detailed manner.
ï‚· This in turn is associated with helping me in gaining of detailed information which in
turn would be associated with helping me in conducting a more detailed research.
ï‚· The case study is associated with providing a detailed insight of the future studies.
Section 5: Timetable
Reminder copy and paste timetable Here:
Task
Mode
Task Name
Duratio
n
Start
Finis
h
Predecesso
rs
Manuall
y Scheduled
Performing
Project Requests
55
days
Sat
2/2/19
Thu
4/18/19
Auto
Scheduled
Project
Initiation
5
days
Mon
2/4/19
Fri
2/8/19
Auto
Scheduled
Project
Launch
10
days
Mon
2/11/19
Fri
2/22/19
2
Auto
Scheduled
Determining
the Objectives
10
days
Mon
2/25/19
Fri
3/8/19
3
Auto
Scheduled
Going for
Quality Deliverables
8
days
Mon
3/11/19
Wed
3/20/19
4
Auto Making the 12 Thu Fri 5
ï‚· This is associated with helping me in allowing to conduct the investigation upon the
subject or the topic in a detailed manner.
ï‚· This in turn is associated with helping me in gaining of detailed information which in
turn would be associated with helping me in conducting a more detailed research.
ï‚· The case study is associated with providing a detailed insight of the future studies.
Section 5: Timetable
Reminder copy and paste timetable Here:
Task
Mode
Task Name
Duratio
n
Start
Finis
h
Predecesso
rs
Manuall
y Scheduled
Performing
Project Requests
55
days
Sat
2/2/19
Thu
4/18/19
Auto
Scheduled
Project
Initiation
5
days
Mon
2/4/19
Fri
2/8/19
Auto
Scheduled
Project
Launch
10
days
Mon
2/11/19
Fri
2/22/19
2
Auto
Scheduled
Determining
the Objectives
10
days
Mon
2/25/19
Fri
3/8/19
3
Auto
Scheduled
Going for
Quality Deliverables
8
days
Mon
3/11/19
Wed
3/20/19
4
Auto Making the 12 Thu Fri 5
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/fb4c60a6-17fd-4ece-a323-2c77b872f88b-page-22.webp)
21PROJECT PLANNING AND DESIGN IMPLEMENTATION
Scheduled performances days 3/21/19 4/5/19
Auto
Scheduled
Project
Performance
4
days
Mon
4/8/19
Thu
4/11/19
6
Auto
Scheduled
Project
Closing
1
day?
Fri
4/12/19
Fri
4/12/19
7
Section 6: Evidence of accomplishment
By the end of this project I will produce a portfolio containing:
Evidence of accomplishment by the signature of the lecture, learning log, incident
report log, screenshot of communication (Notes), government website,, meaning of
project management, how we talk about the team put into groups and bringing the
learning contract for signing.
Scheduled performances days 3/21/19 4/5/19
Auto
Scheduled
Project
Performance
4
days
Mon
4/8/19
Thu
4/11/19
6
Auto
Scheduled
Project
Closing
1
day?
Fri
4/12/19
Fri
4/12/19
7
Section 6: Evidence of accomplishment
By the end of this project I will produce a portfolio containing:
Evidence of accomplishment by the signature of the lecture, learning log, incident
report log, screenshot of communication (Notes), government website,, meaning of
project management, how we talk about the team put into groups and bringing the
learning contract for signing.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/9dda0ddf-d92b-4252-8835-2632148ce87b-page-23.webp)
22PROJECT PLANNING AND DESIGN IMPLEMENTATION
The learning contract and associated appendices
Project report
Supporting evidence (log books, critical incident diaries, and employer and/or
Tutor feedback)
Section 7: References
Cunningham, I., 2017. The wisdom of strategic learning: The self managed learning solution.
Routledge.
Smith, A., 2016. Experiential learning. Edward Elgar Publishing Limited.
Zhang, C., Bai, X. and Gu, F.F., 2018. Contract learning in the aftermath of exchange disruptions:
An empirical study of renewing interfirm relationships. Industrial Marketing Management, 71, pp.215-226.
The learning contract and associated appendices
Project report
Supporting evidence (log books, critical incident diaries, and employer and/or
Tutor feedback)
Section 7: References
Cunningham, I., 2017. The wisdom of strategic learning: The self managed learning solution.
Routledge.
Smith, A., 2016. Experiential learning. Edward Elgar Publishing Limited.
Zhang, C., Bai, X. and Gu, F.F., 2018. Contract learning in the aftermath of exchange disruptions:
An empirical study of renewing interfirm relationships. Industrial Marketing Management, 71, pp.215-226.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/a668d16e-af5c-4e56-a9fd-cbf95970a5b2-page-24.webp)
23PROJECT PLANNING AND DESIGN IMPLEMENTATION
Drachsler, H. and Greller, W., 2016, April. Privacy and analytics: it's a DELICATE issue a
checklist for trusted learning analytics. In Proceedings of the sixth international conference on learning
analytics & knowledge (pp. 89-98). ACM.
Wang, Y., Chen, Y., Wang, W. and Tang, Y., 2019. Differentiating two types of learning in
contract design: Evidence from the construction industry. Scandinavian Journal of Management, 35(1),
pp.1-11.
Vincent-Jones, P., 2017. Relational Contract and Social Learning in Hybrid
Organization. Changing Concepts of Contract: Essays in Honour of Ian Macneil, p.216.
Tian, Z., Zou, S., Warr, T., Wu, L. and Wang, J., 2018. Learning Multi-agent Implicit
Communication Through Actions: A Case Study in Contract Bridge, a Collaborative Imperfect-Information
Game. arXiv preprint arXiv:1810.04444.
Chudgar, A., 2015. Association between contract teachers and student learning in five
Francophone African countries. Comparative Education Review, 59(2), pp.261-288.
Drachsler, H. and Greller, W., 2016, April. Privacy and analytics: it's a DELICATE issue a
checklist for trusted learning analytics. In Proceedings of the sixth international conference on learning
analytics & knowledge (pp. 89-98). ACM.
Wang, Y., Chen, Y., Wang, W. and Tang, Y., 2019. Differentiating two types of learning in
contract design: Evidence from the construction industry. Scandinavian Journal of Management, 35(1),
pp.1-11.
Vincent-Jones, P., 2017. Relational Contract and Social Learning in Hybrid
Organization. Changing Concepts of Contract: Essays in Honour of Ian Macneil, p.216.
Tian, Z., Zou, S., Warr, T., Wu, L. and Wang, J., 2018. Learning Multi-agent Implicit
Communication Through Actions: A Case Study in Contract Bridge, a Collaborative Imperfect-Information
Game. arXiv preprint arXiv:1810.04444.
Chudgar, A., 2015. Association between contract teachers and student learning in five
Francophone African countries. Comparative Education Review, 59(2), pp.261-288.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/016ade9d-de71-4858-97d6-1a65c1edb066-page-25.webp)
24PROJECT PLANNING AND DESIGN IMPLEMENTATION
What is a Learning Contract/Agreement/Plan?
Ethics Review Form
Name: Sybil John Click here to enter text.
Tutor:
Project/Placement: PPDI
This checklist should be completed by the Student undertaking a
project/placement design and implementation Module which involves human
participants and must be discussed with the project/case study Tutor/supervisor and the
form must be verified and signed by the project/case study Tutor/supervisor.
This ethical form will identify if ethics approval needs is required to be submitted
to the Ethics Committee. For ethics policy you are required to read your programme
handbook and visit GSM London website for all the policies before completing the
Ethics Review Form. It is your responsibility as a learner on the project/case study to
exercise appropriate professional judgement on the Ethics Review Form and familiarise
yourself with GSM London Ethics policy.
Project/Placement Option:
Student name and ID:
E-mail address:
Programme:
Module:
Tutor/Supervisor name:
Tutor/ Supervisor E-mail address: Ye
s
No
1. Will the case study you are working involve sensitive
What is a Learning Contract/Agreement/Plan?
Ethics Review Form
Name: Sybil John Click here to enter text.
Tutor:
Project/Placement: PPDI
This checklist should be completed by the Student undertaking a
project/placement design and implementation Module which involves human
participants and must be discussed with the project/case study Tutor/supervisor and the
form must be verified and signed by the project/case study Tutor/supervisor.
This ethical form will identify if ethics approval needs is required to be submitted
to the Ethics Committee. For ethics policy you are required to read your programme
handbook and visit GSM London website for all the policies before completing the
Ethics Review Form. It is your responsibility as a learner on the project/case study to
exercise appropriate professional judgement on the Ethics Review Form and familiarise
yourself with GSM London Ethics policy.
Project/Placement Option:
Student name and ID:
E-mail address:
Programme:
Module:
Tutor/Supervisor name:
Tutor/ Supervisor E-mail address: Ye
s
No
1. Will the case study you are working involve sensitive
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/56f5f0d8-56df-433b-a504-a2f650b59445-page-26.webp)
25PROJECT PLANNING AND DESIGN IMPLEMENTATION
information?
3. Could the case study you are working induce
psychological stress or anxiety, or cause harm or negative
consequences, beyond the risks of everyday life to anyone?
4. If you are collecting information or data in this case
study, will anyone involved be unable to give informed
consent (e.g. people with learning disabilities?
5. Are you collecting information that do not give
participants the right to remain anonymous, or to have the
information they give not identifiable as theirs?
6. Will financial inducements (other than reasonable
expenses and compensation for time) be offered to
participants for collectin information?
7. Will deception be necessary during the case study to
access information or data?
8. Does the case study involve access to confidential
information?
10. Will the right to withdraw from providing information
or data from individuals withheld, or not made explicit?
If the answer to any of the above questions is yes, you have to apply for Ethics
approval from GSM London Research Ethics Committee. If the answer to the above
questions are no, you will still be required to have this Ethics Review Form reviewed
and signed by your Tutor/supervisor. You Tutor/supervisor will discuss the details of any
ethical implication and advise where appropriate. You will be required to keep the
signed copy of Ethical Review Form and submit it as appendices in your final
report/portfolio. It is your responsibility to follow the guidelines of the ethics policy,
programme and Module requirements. If you need any clarifications with regards to
ethics approval, you need to discuss with your Tutor/supervisor.
All materials submitted will be treated confidentially.
I have read and understood the above guidelines and procedures set in
GSM London ethics policy and procedures.
Signed: Tutor/Supervisor
Signed: Student
information?
3. Could the case study you are working induce
psychological stress or anxiety, or cause harm or negative
consequences, beyond the risks of everyday life to anyone?
4. If you are collecting information or data in this case
study, will anyone involved be unable to give informed
consent (e.g. people with learning disabilities?
5. Are you collecting information that do not give
participants the right to remain anonymous, or to have the
information they give not identifiable as theirs?
6. Will financial inducements (other than reasonable
expenses and compensation for time) be offered to
participants for collectin information?
7. Will deception be necessary during the case study to
access information or data?
8. Does the case study involve access to confidential
information?
10. Will the right to withdraw from providing information
or data from individuals withheld, or not made explicit?
If the answer to any of the above questions is yes, you have to apply for Ethics
approval from GSM London Research Ethics Committee. If the answer to the above
questions are no, you will still be required to have this Ethics Review Form reviewed
and signed by your Tutor/supervisor. You Tutor/supervisor will discuss the details of any
ethical implication and advise where appropriate. You will be required to keep the
signed copy of Ethical Review Form and submit it as appendices in your final
report/portfolio. It is your responsibility to follow the guidelines of the ethics policy,
programme and Module requirements. If you need any clarifications with regards to
ethics approval, you need to discuss with your Tutor/supervisor.
All materials submitted will be treated confidentially.
I have read and understood the above guidelines and procedures set in
GSM London ethics policy and procedures.
Signed: Tutor/Supervisor
Signed: Student
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/0bbd099c-f55e-4f52-862e-ab62505e7aad-page-27.webp)
26PROJECT PLANNING AND DESIGN IMPLEMENTATION
Date:
TASK2
Project Report Level 5 Project
1. Context/Background
Monet Holiday Park consists of a garden along with a house which is located in
Giverny. Giverny is a small village which is located Vernon which is almost at a distance
of one hour drive from Paris. Vernon lies just over Seine and is seen to be consisting of
different river cruise boats. This place is very nice for having a one day visit in Giverny
which also consists of small excursion in the river cruise which acts as one the huge
opportunity.
The Mont Holiday Park is one of the famous place and the business manager of
this park is in an essential need of considering the responsibilities which are important
so as to manage the different kind of activities of the administration department of the
park. The business manager is also expected to assist in the marketing program for the
park. In addition to all this the business is also having the intension of performing
Date:
TASK2
Project Report Level 5 Project
1. Context/Background
Monet Holiday Park consists of a garden along with a house which is located in
Giverny. Giverny is a small village which is located Vernon which is almost at a distance
of one hour drive from Paris. Vernon lies just over Seine and is seen to be consisting of
different river cruise boats. This place is very nice for having a one day visit in Giverny
which also consists of small excursion in the river cruise which acts as one the huge
opportunity.
The Mont Holiday Park is one of the famous place and the business manager of
this park is in an essential need of considering the responsibilities which are important
so as to manage the different kind of activities of the administration department of the
park. The business manager is also expected to assist in the marketing program for the
park. In addition to all this the business is also having the intension of performing
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/e6a69bb4-10b2-4471-8b9f-efcf1cd8f0a2-page-28.webp)
27PROJECT PLANNING AND DESIGN IMPLEMENTATION
different kind of analysis so as to look out for certain ways by which different costs can
be reduced.
The literature conducted below depicts different methods as well as theories. The
phases of the project has been discussed below in the later section.
2. Literature Review (models and theories)
Different socio-technical approaches are to be considered by the Monet Holiday
Park along with the social systems, technical systems and the environment. The reason
behind this is that the interacting between this needs to be balanced in a sustainable
way so as to make sure that the park is performing a smart way. The theory should
necessarily be associated with focusing upon the maximization of the effective impacts
which are seen to eb positive (Vincent-Jones 2017). Besides this the theory should also be
necessarily be associated with the minimization or total eradication of the effects which
are poor. In order to make sure that the monitoring of the impacts along with the
evaluation of the mechanism is being done an evaluation process needs to be setup.
This would be associated with the involvement of the different indicators for
preformation. The carefully implemented and desiged strategy would be helping in the
emergence of the park (Tian et al. 2018). All this needs to be documented so as to make
sure that they are contributing towards giving rise to the earning of the foreign
exchange. They should also be associated with the development of income along with
the employment and simulation of the domestic consumption. This in turn would be
associated with bringing of the cultural and the social development of the different
different kind of analysis so as to look out for certain ways by which different costs can
be reduced.
The literature conducted below depicts different methods as well as theories. The
phases of the project has been discussed below in the later section.
2. Literature Review (models and theories)
Different socio-technical approaches are to be considered by the Monet Holiday
Park along with the social systems, technical systems and the environment. The reason
behind this is that the interacting between this needs to be balanced in a sustainable
way so as to make sure that the park is performing a smart way. The theory should
necessarily be associated with focusing upon the maximization of the effective impacts
which are seen to eb positive (Vincent-Jones 2017). Besides this the theory should also be
necessarily be associated with the minimization or total eradication of the effects which
are poor. In order to make sure that the monitoring of the impacts along with the
evaluation of the mechanism is being done an evaluation process needs to be setup.
This would be associated with the involvement of the different indicators for
preformation. The carefully implemented and desiged strategy would be helping in the
emergence of the park (Tian et al. 2018). All this needs to be documented so as to make
sure that they are contributing towards giving rise to the earning of the foreign
exchange. They should also be associated with the development of income along with
the employment and simulation of the domestic consumption. This in turn would be
associated with bringing of the cultural and the social development of the different
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/7ef04448-b777-4603-ad10-5c1240b1dc79-page-29.webp)
28PROJECT PLANNING AND DESIGN IMPLEMENTATION
communities associated with hosting (Smith, 2016). Manson (2015) have been associated
with depicting the fact that the development along with the smaller nations are being
specialized so as to experience the tourism so as to have an increase growth in the
economy. Kossman (2016) in the current statistical and the financial method have been
associated with assuring the fact that the contribution made in the tourism for the nation
economies are being measurable in an easy and precise manner. This in turn would be
helping the indicators in analysing the effects that are to eb brought because of the
impacts upon the growth.
Managing the business system of the park would be easy by deploying the web
based property management system and the reason behind this is that this type of
system is very helpful in controlling the campsite present in any of the device which
consists of the online connection. According to Neal and Harpham(2017) it is always
essential to make a business model which would be flexible in nature. In addition to this
O’Donovan (2017) have been associated with arguing on the fact that the system
should necessarily be tailored so as to make it suitable for the business model of the
holiday park.
Karelse (2017) have been associated with explaining the fact that the usage of
the management tool is seen to very helpful in managing the check-outs as well as the
check-ins along with helping in cleaning of the schedules. This should necessarily be
associated with including the housekeeping records along with the unit ready lists
(Zhang, Bai and Gu 2018). Additionally there exists the channel master who must be linked
with the popular travel sites which would be helping in the network growth.
communities associated with hosting (Smith, 2016). Manson (2015) have been associated
with depicting the fact that the development along with the smaller nations are being
specialized so as to experience the tourism so as to have an increase growth in the
economy. Kossman (2016) in the current statistical and the financial method have been
associated with assuring the fact that the contribution made in the tourism for the nation
economies are being measurable in an easy and precise manner. This in turn would be
helping the indicators in analysing the effects that are to eb brought because of the
impacts upon the growth.
Managing the business system of the park would be easy by deploying the web
based property management system and the reason behind this is that this type of
system is very helpful in controlling the campsite present in any of the device which
consists of the online connection. According to Neal and Harpham(2017) it is always
essential to make a business model which would be flexible in nature. In addition to this
O’Donovan (2017) have been associated with arguing on the fact that the system
should necessarily be tailored so as to make it suitable for the business model of the
holiday park.
Karelse (2017) have been associated with explaining the fact that the usage of
the management tool is seen to very helpful in managing the check-outs as well as the
check-ins along with helping in cleaning of the schedules. This should necessarily be
associated with including the housekeeping records along with the unit ready lists
(Zhang, Bai and Gu 2018). Additionally there exists the channel master who must be linked
with the popular travel sites which would be helping in the network growth.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/7689132b-cf02-41e7-99c2-a218e9b586ce-page-30.webp)
29PROJECT PLANNING AND DESIGN IMPLEMENTATION
3. Project Phases
As discussed earlier the needs related to the quantity of planning along with the
activities is seen to be overwhelming and along with this there are different as well as
high amount of activities which needs to be completed within the specified time as well
as in a proper sequence (Chudgar 2015). By distinguishing the efforts related to managing
the project for the different phases can be provided along with the efforts related to the
structuring and simplification into manageable as well as in logical steps. The steps can
be classified into five phases and this mainly includes the following:
ï‚· Initiation of the project
ï‚· Planning of the project
ï‚· Execution of the project
ï‚· Controlling and monitoring of the project
ï‚· Closure of the project
3. Project Phases
As discussed earlier the needs related to the quantity of planning along with the
activities is seen to be overwhelming and along with this there are different as well as
high amount of activities which needs to be completed within the specified time as well
as in a proper sequence (Chudgar 2015). By distinguishing the efforts related to managing
the project for the different phases can be provided along with the efforts related to the
structuring and simplification into manageable as well as in logical steps. The steps can
be classified into five phases and this mainly includes the following:
ï‚· Initiation of the project
ï‚· Planning of the project
ï‚· Execution of the project
ï‚· Controlling and monitoring of the project
ï‚· Closure of the project
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/ff598101-70e5-4e7f-9978-c4d4e751374f-page-31.webp)
30PROJECT PLANNING AND DESIGN IMPLEMENTATION
4. Skills Developed
The different skills which I have developed because of the project has been listed
below:
ï‚· Skills related to management of finance
ï‚· Marketing related skills
ï‚· Negotiating skills along with the communication skills
ï‚· Leadership skills
ï‚· Project management skills
ï‚· Planning skills
ï‚· Skills related to time management and delegation
ï‚· Skills for solving the problems
ï‚· Networking skills
5. Your actions taken/not taken
The different kind of activities which are included have been listed below:
ï‚· Creation of the register
ï‚· Lodging of the problems
ï‚· Assigning of the activities to different individuals
ï‚· Monitoring of all the processes
ï‚· Analysing the effects
ï‚· Providing of approvals to different resolutions
ï‚· Closure in a proper way
4. Skills Developed
The different skills which I have developed because of the project has been listed
below:
ï‚· Skills related to management of finance
ï‚· Marketing related skills
ï‚· Negotiating skills along with the communication skills
ï‚· Leadership skills
ï‚· Project management skills
ï‚· Planning skills
ï‚· Skills related to time management and delegation
ï‚· Skills for solving the problems
ï‚· Networking skills
5. Your actions taken/not taken
The different kind of activities which are included have been listed below:
ï‚· Creation of the register
ï‚· Lodging of the problems
ï‚· Assigning of the activities to different individuals
ï‚· Monitoring of all the processes
ï‚· Analysing the effects
ï‚· Providing of approvals to different resolutions
ï‚· Closure in a proper way
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/525a5ee4-7ea1-483b-8d7b-856e04ceef93-page-32.webp)
31PROJECT PLANNING AND DESIGN IMPLEMENTATION
The different kind of which are not to be performed includes the following:
ï‚· Corporate issues are not be included.
ï‚· Avoidance of improper management of the problems or issue faced because of a
team member
ï‚· Issues related to communication
ï‚· Expectations are to be controlled
6. Project Learning
One of the most important asset of the project for the Monet Holiday Park is the
human resources. The entire study would be helping in the learning of various kind of
motivation so as to stay in the lead. Along with this the different strategies related to
marketing, finance and many more would also be understood from this study. In
addition to all this the primary aspect of the project is also understandable which mainly
includes the quality assurances, product development and analysis, capacity planning.
The ways of competing and developing the competing advantages have also been
presented clearly. Various kind of business practices are associated with indicating the
differences which is seen to be existing between the failure and success is also
presented so as to be understood.
The different kind of which are not to be performed includes the following:
ï‚· Corporate issues are not be included.
ï‚· Avoidance of improper management of the problems or issue faced because of a
team member
ï‚· Issues related to communication
ï‚· Expectations are to be controlled
6. Project Learning
One of the most important asset of the project for the Monet Holiday Park is the
human resources. The entire study would be helping in the learning of various kind of
motivation so as to stay in the lead. Along with this the different strategies related to
marketing, finance and many more would also be understood from this study. In
addition to all this the primary aspect of the project is also understandable which mainly
includes the quality assurances, product development and analysis, capacity planning.
The ways of competing and developing the competing advantages have also been
presented clearly. Various kind of business practices are associated with indicating the
differences which is seen to be existing between the failure and success is also
presented so as to be understood.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/52d352fa-cd67-4887-b8a4-d8d14b73df74-page-33.webp)
32PROJECT PLANNING AND DESIGN IMPLEMENTATION
Formal Minutes of Group Meetings
Group descriptor: Five Star Consultant.
Date & Time of
Meeting:
13/3/2019
Week 5
9am
Location: IHUB1
Group Members
present:
Enide, Georgette, Hayden, Trace, Sybil and
Rose.
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Practice of elevator pitch.
Human Resources Department
Agreed
Review of
Trading Situation
Contact the builders.
Awaiting quotation from 4 builders
Kevin K Nash Building Contractor.
1. J Rainey Building Contractor
2. Amaya Construction Ltd
3. TPC BUILDERS
4. Horizon Building Contractors
Agreed
Formal Minutes of Group Meetings
Group descriptor: Five Star Consultant.
Date & Time of
Meeting:
13/3/2019
Week 5
9am
Location: IHUB1
Group Members
present:
Enide, Georgette, Hayden, Trace, Sybil and
Rose.
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Practice of elevator pitch.
Human Resources Department
Agreed
Review of
Trading Situation
Contact the builders.
Awaiting quotation from 4 builders
Kevin K Nash Building Contractor.
1. J Rainey Building Contractor
2. Amaya Construction Ltd
3. TPC BUILDERS
4. Horizon Building Contractors
Agreed
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/8286625f-efc7-42d3-91d3-9696a616597d-page-34.webp)
33PROJECT PLANNING AND DESIGN IMPLEMENTATION
Strategies
that worked
The benefits of purchasing land on concession. Agreed
Challenges Builder quotation financial plan update
Ask the financial for update
Agreed
Proposed
Solutions
Human Resources Planning.
Hiring agency staff
Maintenance staff
Cleaning staff
Security staff
Reception staff
Kitchen/ Chief staff
Agreed
Decisions
Taken/Not taken
Department managers must I their elevator
pitch ready by 18/3/2019.
Agreed
Date of next
meeting
20/3/2019 Week 6 Agreed
Minute
taker
Sybil/Project Manager / Time keeper 120
minutes
Ending of meeting
Strategies
that worked
The benefits of purchasing land on concession. Agreed
Challenges Builder quotation financial plan update
Ask the financial for update
Agreed
Proposed
Solutions
Human Resources Planning.
Hiring agency staff
Maintenance staff
Cleaning staff
Security staff
Reception staff
Kitchen/ Chief staff
Agreed
Decisions
Taken/Not taken
Department managers must I their elevator
pitch ready by 18/3/2019.
Agreed
Date of next
meeting
20/3/2019 Week 6 Agreed
Minute
taker
Sybil/Project Manager / Time keeper 120
minutes
Ending of meeting
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/72a580ba-5e08-4071-861b-5a2d66494549-page-35.webp)
34PROJECT PLANNING AND DESIGN IMPLEMENTATION
Formal Minutes of Group Meetings
Group descriptor: FIVE STARS CONSULTANT
Date & Time of
Meeting:
20/3/2019 / Week 6.
10am
Location: IHUB1
Group Members
present:
Sybil, Trace, Hayden, Endie, Georgette and
Rose
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Elevator Pitch Practice Agreed
Review of
Trading Situation
Marketing Intelligence Analysis
Financial forecast
Agreed
Strategies
that worked
Five stars consultant Elevator Pitch Sybil,
georgette, Trace Endie, Hayden and Rose. All of Five
stars Consultant spoken individually about the role
and responsibilities in relations the Project Monet
Holiday Park.
Agreed
Challenges Competition Analysis Agreed
Formal Minutes of Group Meetings
Group descriptor: FIVE STARS CONSULTANT
Date & Time of
Meeting:
20/3/2019 / Week 6.
10am
Location: IHUB1
Group Members
present:
Sybil, Trace, Hayden, Endie, Georgette and
Rose
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Elevator Pitch Practice Agreed
Review of
Trading Situation
Marketing Intelligence Analysis
Financial forecast
Agreed
Strategies
that worked
Five stars consultant Elevator Pitch Sybil,
georgette, Trace Endie, Hayden and Rose. All of Five
stars Consultant spoken individually about the role
and responsibilities in relations the Project Monet
Holiday Park.
Agreed
Challenges Competition Analysis Agreed
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/1e6a4bd4-ba60-48fe-9a31-f30b162e6e0c-page-36.webp)
35PROJECT PLANNING AND DESIGN IMPLEMENTATION
Financial Analysis
Environmental Impact
PESTEL
PORTER’S FIVE FORCES
Risk Analysis
Stakeholders Analysis
Proposed
Solutions
Five Stars Consultant all agreed on recording
and video recording on Monday 25th,2019.
Agreed
Decisions
Taken
Focus on Grantt Chart
Review Incident report
Agreed
Date of next
meeting
27/3/2019 at 10am -12pm. Agreed
Minute
taker
Sybil: Project Manager / Time Keeper. 1 hour
34 mins.
Financial Analysis
Environmental Impact
PESTEL
PORTER’S FIVE FORCES
Risk Analysis
Stakeholders Analysis
Proposed
Solutions
Five Stars Consultant all agreed on recording
and video recording on Monday 25th,2019.
Agreed
Decisions
Taken
Focus on Grantt Chart
Review Incident report
Agreed
Date of next
meeting
27/3/2019 at 10am -12pm. Agreed
Minute
taker
Sybil: Project Manager / Time Keeper. 1 hour
34 mins.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/69fd773a-d472-4bf7-99a1-eda530babc6c-page-37.webp)
36PROJECT PLANNING AND DESIGN IMPLEMENTATION
Formal Minutes of Group Meetings
Group descriptor: Five Stars Consultancy
Date & Time of
Meeting:
20th February 2019 at 9am
Location: Ihub 1 library
Group Members
present:
Sybil, Enide, Hayden, Georgette, Trace
Rose.
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Project Planning
Available funds-
http://www.nationalresources.wales
Profit margin
Location and size of land for the development
of the project
Planning permission form.
Council planning permission consent.
Chair of Board Shareholders/Stakeholder
(Ben)- http://www.investopedia.com
Agreed
Formal Minutes of Group Meetings
Group descriptor: Five Stars Consultancy
Date & Time of
Meeting:
20th February 2019 at 9am
Location: Ihub 1 library
Group Members
present:
Sybil, Enide, Hayden, Georgette, Trace
Rose.
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Project Planning
Available funds-
http://www.nationalresources.wales
Profit margin
Location and size of land for the development
of the project
Planning permission form.
Council planning permission consent.
Chair of Board Shareholders/Stakeholder
(Ben)- http://www.investopedia.com
Agreed
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/e823440c-3b5c-4b56-88a9-80d2fde24328-page-38.webp)
37PROJECT PLANNING AND DESIGN IMPLEMENTATION
Flat structure organisation
Review of
Trading Situation
For the process of converting land to new
purpose by constructing buildings or making use of its
resources.
Trusted Trade Men. www.mybuilders.com
Agreed
Strategies
that worked
Government websites.
Future Planning.
Strategic Planning.
Organisation.
Decision making.
Teamwork.
Agreed
Challenges Brexit and it disadvantages- loss of funding In
wales through the main structural funding
programmes.
Agreed
Proposed
Solutions
Finding a sustainable land in wales for the
development of the Holiday Park.
Agreed
Decisions
Taken/Not taken
Decisions agreed. Agreed
Date of next
meeting
27/2/2019 Agreed
Minute
taker
Sybil: Project Manager / Time keeper 1 hour
20
Flat structure organisation
Review of
Trading Situation
For the process of converting land to new
purpose by constructing buildings or making use of its
resources.
Trusted Trade Men. www.mybuilders.com
Agreed
Strategies
that worked
Government websites.
Future Planning.
Strategic Planning.
Organisation.
Decision making.
Teamwork.
Agreed
Challenges Brexit and it disadvantages- loss of funding In
wales through the main structural funding
programmes.
Agreed
Proposed
Solutions
Finding a sustainable land in wales for the
development of the Holiday Park.
Agreed
Decisions
Taken/Not taken
Decisions agreed. Agreed
Date of next
meeting
27/2/2019 Agreed
Minute
taker
Sybil: Project Manager / Time keeper 1 hour
20
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/2e100de4-b604-4360-8399-adb06382c15c-page-39.webp)
38PROJECT PLANNING AND DESIGN IMPLEMENTATION
mins
Formal Minutes of Group Meetings
Group descriptor: Five Stars Consultant
Date & Time of
Meeting:
6/4/2019 / Week 8.
10am-12pm
Location: IHUB1
Group Members
present:
Hayden, Sybil, Rose, Endie, Georgette and
Trace
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
PPDI Review
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
mins
Formal Minutes of Group Meetings
Group descriptor: Five Stars Consultant
Date & Time of
Meeting:
6/4/2019 / Week 8.
10am-12pm
Location: IHUB1
Group Members
present:
Hayden, Sybil, Rose, Endie, Georgette and
Trace
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
PPDI Review
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/1ceeefad-23a2-4573-865a-09590047a97e-page-40.webp)
39PROJECT PLANNING AND DESIGN IMPLEMENTATION
Solutions
Decisions
Taken/Not taken
Date of next
meeting
13/4/2019
Minute
taker
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Solutions
Decisions
Taken/Not taken
Date of next
meeting
13/4/2019
Minute
taker
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/4833c10d-fd7b-4284-a8af-d7a74cf61569-page-41.webp)
40PROJECT PLANNING AND DESIGN IMPLEMENTATION
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Formal Minutes of Group Meetings
Group descriptor: Five Star Consultant
Date & Time of
Meeting:
22/3/2019/ Week 7
Location: IHub1
Group Members
present:
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Formal Minutes of Group Meetings
Group descriptor: Five Star Consultant
Date & Time of
Meeting:
22/3/2019/ Week 7
Location: IHub1
Group Members
present:
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/62e2ec42-4c8c-4485-a471-9684ffc7ebd1-page-42.webp)
41PROJECT PLANNING AND DESIGN IMPLEMENTATION
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Grantt Chart
Incident log
Review of
Trading Situation
To discuss Five Star consultant Elevator Pitch
Review before sending
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Sybil: Project Manager/Time keeper
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Grantt Chart
Incident log
Review of
Trading Situation
To discuss Five Star consultant Elevator Pitch
Review before sending
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Sybil: Project Manager/Time keeper
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/aac099b9-775b-40c3-8b36-b5d0032b6bb2-page-43.webp)
42PROJECT PLANNING AND DESIGN IMPLEMENTATION
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/2643a8ae-408f-4302-bb46-5e44d7515184-page-44.webp)
43PROJECT PLANNING AND DESIGN IMPLEMENTATION
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Review of
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Review of
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/706e207e-d6f6-4567-b601-a6e91179e4ee-page-45.webp)
44PROJECT PLANNING AND DESIGN IMPLEMENTATION
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Formal Minutes of Group Meetings
Group descriptor:
Date & Time of
Meeting:
Location:
Group Members
present:
Apologies for
Absence:
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/51d28324-7ae3-4943-b644-63033c1af543-page-46.webp)
45PROJECT PLANNING AND DESIGN IMPLEMENTATION
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Agenda
Items
Minutes & Actions agreed
Action
Purpose of
Meeting
Review of
Trading Situation
Strategies
that worked
Challenges
Proposed
Solutions
Decisions
Taken/Not taken
Date of next
meeting
Minute
taker
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/54121b29-4cd6-43ca-83b0-5b770895cfa3-page-47.webp)
46PROJECT PLANNING AND DESIGN IMPLEMENTATION
Weekly Learning Log
Name: sybil John Week 1
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER:1
DATES: 11/2/2019
Day/date: Mondays Nature of Work and Time: Everyday life/
time management skills
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Reflection
Reflecting on Action (Shon, 1987)
The understanding of events in life can
be good or bad. In relations to a good event
one reflects on feelings of satisfaction and
accomplishment. However, a bad event one
reflects on what had happened that could
possibly gone wrong. Then plan and try ones
best not to make the same mistakes. Some
people have to take time out or go to a quiet
place to reflect because of their busy life style
and other pressure in life.
Reflecting in Action
Reflecting can also happen in action
whilst multitasking in the workplace.
Weekly Learning Log
Name: sybil John Week 1
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER:1
DATES: 11/2/2019
Day/date: Mondays Nature of Work and Time: Everyday life/
time management skills
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Reflection
Reflecting on Action (Shon, 1987)
The understanding of events in life can
be good or bad. In relations to a good event
one reflects on feelings of satisfaction and
accomplishment. However, a bad event one
reflects on what had happened that could
possibly gone wrong. Then plan and try ones
best not to make the same mistakes. Some
people have to take time out or go to a quiet
place to reflect because of their busy life style
and other pressure in life.
Reflecting in Action
Reflecting can also happen in action
whilst multitasking in the workplace.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/bca90354-c80c-40fa-bd2b-345aef333f44-page-48.webp)
47PROJECT PLANNING AND DESIGN IMPLEMENTATION
Evaluation What happened- context
Thinking and feelings- Analyse
Consequences- Evaluate
Review Action Planning
Look back, forwards, and around to
learn.
Improving performance
Satisfaction and results
Weekly Learning Log
Name: Sybil Click here to enter text.
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER: 1
DATES: 11/2/2019
Day/date: Nature of Work and Time: PPDI
Activities What did I learn or gain from these
activities?
Evaluation What happened- context
Thinking and feelings- Analyse
Consequences- Evaluate
Review Action Planning
Look back, forwards, and around to
learn.
Improving performance
Satisfaction and results
Weekly Learning Log
Name: Sybil Click here to enter text.
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER: 1
DATES: 11/2/2019
Day/date: Nature of Work and Time: PPDI
Activities What did I learn or gain from these
activities?
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/f9497e6e-15d4-4e0c-8ccc-b47fbc570046-page-49.webp)
48PROJECT PLANNING AND DESIGN IMPLEMENTATION
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Week 1. On February
11, 2019. PPDI PERSONALITY
TEST.
Lecture class activities
This week I completed a Personality
test. I learnt that I am a Choleric person,
which means that I am a practical, successful,
independent, goal- oriented analytical,
decisive, competent tough minded. The
personality test helped me to understand
myself how I perceive information and
analyse situations. By having these
personality traits mentioned above it will help
me to be more positive as a Project Manager
in a work place environment.
The lecturer selected students in
accordance to the results from the online
personality test and students were allocated
into groups.
What was learned this
week
On this day I learned what is expected
from the group in a particular period of time.
We discussed the importance of commitment,
goal setting, sharing ideas, and how to work
together in a group
How will I apply myself I intend to attend all lectures and
tutorials. I am reading the assignment brief,
weekly slides, books and doing report finding
research. One of the books the lecture
recommended is The Scale Hall Professional
Scale (Hall,1968). By doing this I will improve
my professional behaviour and apply
professional values in the group.
How do I feel about my
learning?
I feel since starting semester 2, Level 5
I have become more organised and I am able
to prioritise my time more efficiently. I am
able to use weekly logs, weekly journals, time
keeping, and note taking. Which I will be able
to put into folders and having a designated
space for me to keep all my University work
to revise and reflect on.
Any other comments:
………………………………………………………………………………………………
………………………………………………………………………………………………………
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Week 1. On February
11, 2019. PPDI PERSONALITY
TEST.
Lecture class activities
This week I completed a Personality
test. I learnt that I am a Choleric person,
which means that I am a practical, successful,
independent, goal- oriented analytical,
decisive, competent tough minded. The
personality test helped me to understand
myself how I perceive information and
analyse situations. By having these
personality traits mentioned above it will help
me to be more positive as a Project Manager
in a work place environment.
The lecturer selected students in
accordance to the results from the online
personality test and students were allocated
into groups.
What was learned this
week
On this day I learned what is expected
from the group in a particular period of time.
We discussed the importance of commitment,
goal setting, sharing ideas, and how to work
together in a group
How will I apply myself I intend to attend all lectures and
tutorials. I am reading the assignment brief,
weekly slides, books and doing report finding
research. One of the books the lecture
recommended is The Scale Hall Professional
Scale (Hall,1968). By doing this I will improve
my professional behaviour and apply
professional values in the group.
How do I feel about my
learning?
I feel since starting semester 2, Level 5
I have become more organised and I am able
to prioritise my time more efficiently. I am
able to use weekly logs, weekly journals, time
keeping, and note taking. Which I will be able
to put into folders and having a designated
space for me to keep all my University work
to revise and reflect on.
Any other comments:
………………………………………………………………………………………………
………………………………………………………………………………………………………
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/db3794ad-21d8-4116-8ba9-4aae574de5c3-page-50.webp)
49PROJECT PLANNING AND DESIGN IMPLEMENTATION
………………………………………………………………………………………………………
…………………………………………………………
Weekly Learning Log
Name: Sybil John Week 10
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER:
DATES:
Day/date: Nature of Work and Time:
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Research
By doing research I was able to find out
information to how and complete the project
assigned to the group.
Group work Evaluation skills. The process of the
positive results of what the group been doing.
By doing this I gained the skills of
collaboration with the group. As well as,
improvement to my project management
skills in terms of time management, planning,
budgeting, and processing skills.
………………………………………………………………………………………………………
…………………………………………………………
Weekly Learning Log
Name: Sybil John Week 10
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER:
DATES:
Day/date: Nature of Work and Time:
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Research
By doing research I was able to find out
information to how and complete the project
assigned to the group.
Group work Evaluation skills. The process of the
positive results of what the group been doing.
By doing this I gained the skills of
collaboration with the group. As well as,
improvement to my project management
skills in terms of time management, planning,
budgeting, and processing skills.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/42d1f626-af7e-4364-a960-a87bfca3b7c1-page-51.webp)
50PROJECT PLANNING AND DESIGN IMPLEMENTATION
The Belbin and the
Gallup theory
Transferrable task theory tasks
information from level 4 to level 5. For
Example: wisdom and knowledge gained in
terms of reflection.
Weekly Learning Log
Name: sybil John Week 1
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER:1
DATES: 11/2/2019
Day/date: Mondays Nature of Work and Time: Everyday life/
time management skills
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
The Belbin and the
Gallup theory
Transferrable task theory tasks
information from level 4 to level 5. For
Example: wisdom and knowledge gained in
terms of reflection.
Weekly Learning Log
Name: sybil John Week 1
Student ID #:
Tutor:
Project/Placement:
WEEK
NUMBER:1
DATES: 11/2/2019
Day/date: Mondays Nature of Work and Time: Everyday life/
time management skills
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/174d5b0a-945b-4423-bba4-e8757672663f-page-52.webp)
51PROJECT PLANNING AND DESIGN IMPLEMENTATION
Reflection
Reflecting on Action (Shon, 1987)
The understanding of events in life can
be good or bad. In relations to a good event
one reflects on feelings of satisfaction and
accomplishment. However, a bad event one
reflects on what had happened that could
possibly gone wrong. Then plan and try ones
best not to make the same mistakes. Some
people have to take time out or go to a quiet
place to reflect because of their busy life style
and other pressure in life.
Reflecting in Action
Reflecting can also happen in action
whilst multitasking in the workplace.
Evaluation What happened- context
Thinking and feelings- Analyse
Consequences- Evaluate
Review Action Planning
Look back, forwards, and around to
learn.
Improving performance
Satisfaction and results
Weekly Learning Log
Name: Sybil John Week 10
Student ID #:
Tutor:
Reflection
Reflecting on Action (Shon, 1987)
The understanding of events in life can
be good or bad. In relations to a good event
one reflects on feelings of satisfaction and
accomplishment. However, a bad event one
reflects on what had happened that could
possibly gone wrong. Then plan and try ones
best not to make the same mistakes. Some
people have to take time out or go to a quiet
place to reflect because of their busy life style
and other pressure in life.
Reflecting in Action
Reflecting can also happen in action
whilst multitasking in the workplace.
Evaluation What happened- context
Thinking and feelings- Analyse
Consequences- Evaluate
Review Action Planning
Look back, forwards, and around to
learn.
Improving performance
Satisfaction and results
Weekly Learning Log
Name: Sybil John Week 10
Student ID #:
Tutor:
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/90a6e173-fa3d-4bd7-be36-9a30f878bd23-page-53.webp)
52PROJECT PLANNING AND DESIGN IMPLEMENTATION
Project/Placement:
WEEK
NUMBER:
10 DATES: 4/15/2019
Day/date: Nature of Work and Time:
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Research
By doing research I was able to find out
information to how and complete the project
assigned to the group.
Group work Evaluation and judgement skills. The
process of the positive results of what the
group been doing. By doing this I gained the
skills of collaboration with the group. As well
as, improvement to my project management
skills in terms of time management, planning,
budgeting, and processing skills.
The Belbin and the
Gallup theory
Transferrable task theory tasks
information from level 4 to level 5. For
Example: wisdom and knowledge gained in
terms of reflection.
Project/Placement:
WEEK
NUMBER:
10 DATES: 4/15/2019
Day/date: Nature of Work and Time:
Activities What did I learn or gain from these
activities?
Relate this analysis in relation to
knowledge and understanding; cognitive skills;
and graduate skills.
Research
By doing research I was able to find out
information to how and complete the project
assigned to the group.
Group work Evaluation and judgement skills. The
process of the positive results of what the
group been doing. By doing this I gained the
skills of collaboration with the group. As well
as, improvement to my project management
skills in terms of time management, planning,
budgeting, and processing skills.
The Belbin and the
Gallup theory
Transferrable task theory tasks
information from level 4 to level 5. For
Example: wisdom and knowledge gained in
terms of reflection.
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/6007f42e-a1ed-45c8-bda6-9b706616a2cc-page-54.webp)
53PROJECT PLANNING AND DESIGN IMPLEMENTATION
Critical Incident Log Sheet
Name:
Student ID #:
Tutor: Fiona Oghorie
Project/Placement GIS Project
Incident:
Date Time Event/Action Taken What did I
learn?
Critical Incident Log Sheet
Name:
Student ID #:
Tutor: Fiona Oghorie
Project/Placement GIS Project
Incident:
Date Time Event/Action Taken What did I
learn?
![Document Page](https://desklib.com/media/document/docfile/pages/project-planning-and-design-implementati-7ajv/2024/09/12/9107e5b2-c205-4256-8ccc-d42ba88e1dc5-page-55.webp)
54PROJECT PLANNING AND DESIGN IMPLEMENTATION
1 out of 55
Related Documents
![[object Object]](/_next/image/?url=%2F_next%2Fstatic%2Fmedia%2Flogo.6d15ce61.png&w=640&q=75)
Your All-in-One AI-Powered Toolkit for Academic Success.
 +13062052269
info@desklib.com
Available 24*7 on WhatsApp / Email
Unlock your academic potential
© 2024  |  Zucol Services PVT LTD  |  All rights reserved.