This project report analyzes the various aspects associated with the planning, scope, risk, and success of Astra PLC's new application development aimed at securing the supply chain of raw materials to the steel industry. The report details the project plan, including activities like market study, prototype preparation, and marketing strategies, using a Gantt chart for graphical representation. It evaluates potential risks such as cost overruns, delays in app design, testing failures, competition, and compatibility issues. Key performance indicators (KPIs) such as active users, retention rates, number of users, cohort analysis, and lifetime value are identified as crucial for measuring the application's success. The Gantt chart is emphasized as a tool for ensuring timely completion of tasks and overall project success.
Document Page
Project
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
Table of Contents
1.0 Introduction................................................................................................................................3
2.0 Project plan............................................................................................................................3
3.0 Project scope.........................................................................................................................3
4.0 Project Risk...........................................................................................................................3
5.0 Project success......................................................................................................................4
Conclusion.......................................................................................................................................6
Document Page
1.0 Introduction
The present report is aimed at analysing the various aspects that are associated with project
planning, project scope, project success and project risk. There is development of Astra PLC new
application, it is a diversified resource organisation (Rush, 2018). The main motive of the brand
is to secure the supply chain of raw materials to the steel industry. Present report is based on
preparation of project plan, analysing of project success that can help in the process of achieving
the laid aims and objectives.
2.0 Project plan
For the purpose of creating of a project plan it is very important to analyse various activities
based on the time duration that is allotted to each activity. Such as in initial stages it will include
approval plan, drawing of plan, studying of market, market strategy, preparation of prototype of
the app, materials, facilitates, internal production function, evaluation of the strategies. Further
there is ficus on marketing aspect (Bhowmik and et.al., 2018). Each activity is associated with a
specific time duration then further it will help in the process of completion of the various set of
activities as per specified time period. For this purpose there will be use of Gantt chart in order to
have proper graphical representation of all the activities. There is launching of Astra plc new
application for the purpose of managing the customer services. In order to deal with the
customers queries, demands and preferences it has become very important to achieve the
required competitive advantage which can lead towards dealing with changing customer
preferences.
3.0 Project scope
The main scope of the project is to analyse the various potential risks and achievement of
success in the course of launching the project. There will be evaluation of the various aspects of
the project that can assist in the successful launching of the app. There is launching of Astra plc
new application for the purpose of managing the customer services. In order to deal with the
customers queries, demands and preferences it has become very important to achieve the
required competitive advantage which can lead towards dealing with changing customer
preferences. The present project report will help in the process of analysing the various aspects
which is going to lead towards understand the changing customer preferences. There will be
different elements that are related with the activities of the present application development plan.
Document Page
Apart from this it will help in the process of evaluating the risk factors that are associated with
the project that have to be overcome apart from this there will be testing of the newly developed
application that will be done in this project report. Further the scope of project lies in the view
that it is going to help in the context of analysing the various KPI measures which is going to
help in measurement of the success of the project. The Gantt chart that is developed in this
project will lead towards evaluation of the each activity is divide as per the available time period.
4.0 Project Risk
There are some of the risks which may affect the present process of launching of app in context
of Astra. Such as some of such risks are mentioned below:
Cost overruns: There is a specific financial budget which is being formulated by the
management for the purpose of managing different activities but there can be instances where
the app development billing rates are higher and may lead to high overrunns cost. There can also
be situation of cost getting out of control.
Delay in app design: There can also be situation when the available time period may be limited.
There is situation here can be issues of wastage of time.
Testing of the app: After preparation of the app prototype there will may be issues related with
testing of app whee the app can fail and not meet up to the laid standards of performance
(Abdelaziz, Kim and Teramoto, 2021). This issues can affect the long term functioning of app
and there will be again al the efforts made towards re working on each of the aspect of the app.
Competition: In case of astra plc there are issues which may lead to difficulty in surviving in the
market because of already existing applications that can pose high amount of threat.
Compatibility issues: In case of new app development for astra plc there can be some of the
compatibility issues that may arise when they are no longer supported by the centre. There can
be overrun of of budget that will affect the present functioning of application.
5.0 Project success
After there is completion of application development project it is important to analyse several
Key performance indicators which have to be assessed to help and understand the level of
success of the application:
Active users: In present scenario the number of active users that is associate the the number of
people who have downloadable the app and active engagement is vert important to track the
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
couple of metrics. Retention: The success of the application can also be understood by analysing
the way customers are retained through different retention.
Number of users: It is the first measure if the success of app that is number of people who have
actually downloaded and intended to use the app (Bhowmik and et.al., 2018). It can help in the
process d tracking the sources of application for astra plc.
Cohort analysis: It is also a tool that can be used for the purpose of understanding the way there
can be creation of long term users or understand the number of people who are quitting the use of
application.
Lifetime value: It is another key metric that tells the value of each customer is bringing to the
app. In present scenario in case of Astra plc app that is mainly focussed on evaluating the
changing customer preference and solving the customer queries, this KPI measures will be a
metric by analysing the average time customer is using the application. It can be in terms of
revenue or profit while there is calculation of marketing cost that is applied to determine in
advance so that calculations can be made consistent (Sethi and et.al. 2020).
Gantt chart: It is a specific chart that will be used in the present scenario for the purpose of
understanding the specific time that is associated with each activity so that it cam help in
achievement of long term success. It will ensure completion of each element and function as per
specific time duration.
Document Page
Document Page
Conclusion
It is conclude from the above mentioned aspects that the process of launching of the
application there are many different activities that are required to be performed in order to ensure
successful launching. For this purpose Gantt chart is sued as a technique for dividing the work as
per specific tasks. It helps in the smooth flow of activities and timely completion of launching
functions.
tabler-icon-diamond-filled.svg

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
References
Books and journal
Rush, S.C., 2018. Launching a perceptual mapping study: Applications to examining teachers’
perceptions of disability and school-based mental health services. SAGE Publications Ltd.
Sethi and et.al. 2020. Launching WordPress-Blogs and Domains. International Journal of
Innovative Research in Computer Science & Technology (IJIRCST), ISSN, pp.2347-5552.
Bhowmik and et.al., 2018. Interaction of anionic dyes with polyaniline implanted cellulose:
organic π-conjugated macromolecules in environmental applications. Journal of Molecular
Liquids, 261, pp.189-198.
Abdelaziz, A.A., Kim, H.H. and Teramoto, Y., 2021. Towards launching a stable wide plasma
jet from a single tube: II. Scaling parameters from the tube geometry and electrical
characteristics. Journal of Physics D: Applied Physics, 54(39), p.395204.
Bhowmik, and et.al., 2018. Interaction of anionic dyes with polyaniline implanted cellulose:
organic π-conjugated macromolecules in environmental applications. Journal of Molecular
Liquids, 261, pp.189-198.
chevron_up_icon
1 out of 8
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]