Project procurement and control Student’s name Institution Affiliation(s)
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Approaches to Procurement Management A procurement management plan is designed to define the process and requirements for the project. This plan will unite the scope of the project with the risks associated with procurement. The plan will elaborate on the process from procurement planning to procurement closure. Standard operating procedures minimize risks and increase efficiency. Procurement management provides us with a standard operating procedure for the procurement of products required to complete the project. Procurement management saves not only monetary cost but also saves time cost. It streamlines the workforce and recommends the most suitableworkforce for a particular job. From the first step of documentation to the contract closure, procurement management takes into account all the risks that may occur in the process. The damage of these risks can be enormous. However; procurement management deals with these risks beforehand and protects the organization from loss(Araújo et al., 2017). The procurement process runs smoothly as all the precautionary steps were taken. There was no risk of understatement or overstatement of goods which protected the project from bearing the high cost. Due to the extensive market knowledge, the budgeted amounts and expected amounts were close. The procurement team member was skillful enough that they did not allow the negotiations to come to a halt. An ideal vendor was chosen that would fulfill the contract. There were no unanticipated increases in cost as all the negotiations were recorded. Products were delivered on time and were of expected quality. In all, the procurement part of the project was completed in an ideal cost. The organization was able to save all the unnecessary costs and expenses which could have amounted to 60 % – 70 % of the ideal cost above the ideal cost(Kivilä, Martinsuo, & Vuorinen, 2017).
Approach to successful delivery and project control The execution of appropriate frameworks and strategies to maintain the effectiveness of project control is a source of critical concern for project managers specifically because of the attachment of particular requirements with specific projects as put forth in the client’s demands. It is therefore important to explore the critical factors which essentially determine the extent to which a project can be characterized as successful in meeting the outlined objectives (Vanhoucke, 2019). In accordance with this understanding, the most important element to ensuring effective control can be labeled as the determination of a critical path and the management of time. Also, Integral concepts in effective project control and management comprise of understanding the significance of time management and scheduling(Shokr & Torabi, 2017). Good procurement management contributes and directly correlates to the success of a business. By doing the initial parts of the project in a very organized manner, savings are generated. For one, time is engaged in the most manageable manner in order to prevent delays and conflicts of schedules in the implementation of the project plan since materials and commodities need not be scarce when they are needed in the operations. Secondly, hard savings in terms of purchase dealings and best pricing alternatives are being employed when such good practices are in place. Finally, the achievement of project control is also applicable when discussing the long term objectives of a project.
References Araújo, M. C. B., Alencar, L. H., & de Miranda Mota, C. M. (2017). Project procurement management: A structured literature review.International Journal of Project Management, 35(3), 353–377. https://doi.org/10.1016/j.ijproman.2017.01.008 Kivilä, J., Martinsuo, M., & Vuorinen, L. (2017). Sustainable project management through project control in infrastructure projects.International Journal of Project Management,35(6), 1167–1183. https://doi.org/10.1016/j.ijproman.2017.02.009 Shokr, I., & Torabi, S. A. (2017). An enhanced reverse auction framework for relief procurement management.International Journal of Disaster Risk Reduction,24, 66–80. https://doi.org/10.1016/j.ijdrr.2017.05.019 Vanhoucke, M. (2019). Tolerance limits for project control: An overview of different approaches.Computers & Industrial Engineering,127, 467–479. https://doi.org/10.1016/j.cie.2018.10.035