Project Procurement Management Assignment (Doc)

7 Pages1618 Words96 Views
   

Added on  2020-12-09

Project Procurement Management Assignment (Doc)

   Added on 2020-12-09

ShareRelated Documents
Project Procurement
Project Procurement Management Assignment (Doc)_1
Table of ContentsTASK...............................................................................................................................................11. Bid proposal............................................................................................................................12. Contract management technique.............................................................................................3REFERENCES................................................................................................................................5
Project Procurement Management Assignment (Doc)_2
TASK1. Bid proposalMinistry of Defence of the Kingdom of the NetherlandsBID NO. 2018-188ANNUAL CONTRACT FOR SEEKING TOWELS AND OVERALLS CONSISTMINIMUM 10% RECYCLED POST-CONSUMER TEXTILE FIBRESBIDS DUE JANUARY 17, 20192:00 P.M.The Ministry of Defence of the Kingdom of the Netherlands is requesting bids for towelsconsisting minimum of 10% recycled post-consumer textile fibers. All the bidders needs toattach price forms with submissions. The provision of cost and contract is provisional underclauses of MODNL. The following terms and conditions requires to be kept by organizations while submitting thebids - Technical – In order to proceed with recycling activities effectively, organization must requireto implement advance equipment and machinery which ensure massive reduction in fabricwaste. Therefore, it is required for firms to demonstrate the quality remaining fabric and thepossible amount that considered in recycled fibers through microscopic testing. Formanufacturing services, it is required to implement advance feature equipment that assist inreducing wastage as well as costs Muthu, S. S. (2014). Through this manufacturing industry canmake possible changes in recycling fabrics. Requirement of technology should have to be underthe consumption of - CO2: 68,880kg Energy: 23,530 MJ Water use: 233,478,000 litersManagement – In order to work under the contract of MODNL, worker of the organizationrequires to have proper knowledge regarding recycling practices of textiles. Therefore,management requires to distribute roles and responsibilities properly after analyzing staff1
Project Procurement Management Assignment (Doc)_3

End of preview

Want to access all the pages? Upload your documents or become a member.