Limited-time offer! Save up to 50% Off | Solutions starting at $6 each  

Project Procurement Management Assignment (Doc)

Added on - 08 Dec 2020

Trusted by +2 million users,
1000+ happy students everyday
Showing pages 1 to 3 of 7 pages
Project Procurement
Table of ContentsTASK...............................................................................................................................................11. Bid proposal............................................................................................................................12. Contract management technique.............................................................................................3REFERENCES................................................................................................................................5
TASK1. Bid proposalMinistry of Defence of the Kingdom of the NetherlandsBID NO. 2018-188ANNUAL CONTRACT FOR SEEKING TOWELS AND OVERALLS CONSISTMINIMUM 10% RECYCLED POST-CONSUMER TEXTILE FIBRESBIDS DUE JANUARY 17, 20192:00 P.M.TheMinistry of Defence of the Kingdom of the Netherlands is requesting bids for towelsconsisting minimum of 10% recycled post-consumer textile fibers. All the bidders needs toattach price forms with submissions. The provision of cost and contract is provisional underclauses of MODNL.The following terms and conditions requires to be kept by organizations while submitting thebids -Technical– In order to proceed with recycling activities effectively, organization must requireto implement advance equipment and machinery which ensure massive reduction in fabricwaste. Therefore, it is required for firms to demonstrate the quality remaining fabric and thepossible amount that considered in recycled fibers through microscopic testing. Formanufacturing services, it is required to implement advance feature equipment that assist inreducing wastage as well as costs Muthu, S. S. (2014). Through this manufacturing industry canmake possible changes in recycling fabrics. Requirement of technology should have to be underthe consumption of -CO2: 68,880kgEnergy: 23,530 MJWater use: 233,478,000 litersManagement– In order to work under the contract of MODNL, worker of the organizationrequires to have proper knowledge regarding recycling practices of textiles. Therefore,management requires to distribute roles and responsibilities properly after analyzing staff1
desklib-logo
You’re reading a preview
Preview Documents

To View Complete Document

Click the button to download
Subscribe to our plans

Download This Document