logo

Project Report: Inventory Tracking System

   

Added on  2020-03-28

8 Pages1617 Words122 Views
COMPETENCYDEMONSTRATION REPORTCareer Episode 1AMIR FAGHIH LARIJANI

CE 1.1 Project InformationName of the project: Inventory Tracking Software Improvement ProjectLocation of the project: [PLEASE FILL]Project Duration: [PLEASE FILL]Organization: [PLEASE FILL]Role and Designation during the time: Team MemberCE 1.2 Project BackgroundCE 1.2.1 Characteristics of the projectThis project had been developed based on the improvement of the already in use radiotracking method in warehouses and production line processes in different factories. The project isto become an advanced inventory tracking system software. For the development of the bestquality software I had followed methods which were to be considered important for thedevelopment of such software’s. The different factors which needed to be included into thesystem had been included into the system so that the objectives and the client requirements aremet to the point. I had taken care of doing some research based on the previous version of thesoftware already in use in the different organisations. The basic objective is to have a radiotracking software.

CE 1.2.2 Objectives developed for the projectFor the completion of this project I had developed the following list of objectives so as todeliver the best quality project to my client and to make the project as per the requirements of theproject:To produce a software which would be able to track objects and products on theground of production and warehouse.To make it simple for anyone to use without any prior knowledge about the softwareTo make a radio inventory tracking system softwareTo make the application in the form of a web application. CE 1.2.3 My area of workI had studied the data base implementations of the software’s, conducted survey from theusers of the software to get to know the drawbacks and the usability of the software. All theseresearch materials were used for the development of the project software. This was to help in theimprovement of the experience for the users of this software. The software is to have many userswho can be trained as well as untrained users. I had also helped my team members inunderstanding the innovation which I had devised to be added into the system.

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Project on Small Scale ERP Engine Design
|8
|1628
|54

Competency Demonstration Report Assignment
|9
|1610
|217

Development of College Automation System Project
|7
|1675
|183

Competency Demonstration Report Humidity Control
|8
|1624
|83

Assignment on Professional Engineering
|13
|2753
|149

ITC 493 - Designing and Development of Autonomous Mobile Robot
|7
|1712
|57