Project and Risk Management: Cost-Benefit Analysis and Budgeting for Amazon Bangladesh Infrastructure

Verified

Added on  2023/05/30

|24
|5406
|370
AI Summary
This report discusses cost-benefit analysis and budgeting for building infrastructure for Amazon Bangladesh. It includes cash flow estimates, funding sources, and budgeting tasks.

Contribute Materials

Your contribution can guide someone’s learning journey. Share your documents today.
Document Page
Running head: PROJECT AND RISK MANAGEMENT
PROJECT AND RISK MANAGEMENT
Name of the Student
Name of the University
Author Note:

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
1PROJECT AND RISK MANAGEMENT
Table of Contents
Section 5..............................................................................................................................2
Introduction..........................................................................................................................2
Cost-benefit......................................................................................................................3
Budgeting.........................................................................................................................4
Financial Appraisal..........................................................................................................8
Management plan Matrix.................................................................................................8
Conclusion...........................................................................................................................9
Section 7............................................................................................................................10
Introduction........................................................................................................................10
Project Stakeholder Management..................................................................................10
Communication Plan.....................................................................................................12
Communication Matrix..................................................................................................13
Conclusion.........................................................................................................................15
Section 8............................................................................................................................16
Scope management........................................................................................................16
Closing of the project.....................................................................................................17
Post Implementation review..........................................................................................18
Key performance Indicator............................................................................................19
Conclusion.........................................................................................................................20
References..........................................................................................................................22
Document Page
2PROJECT AND RISK MANAGEMENT
Section 5
Introduction
This particular report mainly deals with two important aspects like cost benefit analysis
and budget for building project for Amazon Bangladesh. Cash flow estimates will mainly
highlight the source of funding which can arise form profits as well depreciation. It mainly
makes use of proper funding like repayment of loan installments.
Input values
Cost-Benefit Analysis for Building the infrastructure for Amazon to expand business
in Bangladesh
Hardware $ 20,000,000.00
Software $ 1,000,000.00
Development team salaries $ 7,300,000.00
Training $ 1,700,000.00
Total Development Cost $ 30,000,000.00
Hardware $ 20,000,000.00
Software $ 500,000.00
Operational Labor $ 9,500,000.00
Total Operational Cost $ 30,000,000.00
Approximate salary savings $ 15,000,000.00
Reduced operating cost $ 3,000,000.00
Total Benefit $ 18,000,000.00
Document Page
3PROJECT AND RISK MANAGEMENT
Discount Rate Used 5.00%
Cost-benefit
Project Cost-
Benefit
Analysis
Analysis
Variables:
Discount
Rate Used 5.00%
Annual
Benefits
$18,00
0,000.0
0
Annual
Operational
Costs
$30,00
0,000.0
0
One-Time
Development
Cost
$30,00
0,000.0
0
Year of
Project
0 1 2 3 4 5
TOTAL
S
Economic
Benefit $0.00
$
18,000,
000.00
$
18,000,
000.00
$
18,000,0
00.00
$
18,000,0
00.00
$
18,000,0
00.00
Discount Rate 1.0000 0.9524 0.9070 0.8638 0.8227 0.7835
PV of Benefits $0.00
$17,142
,857.14
$16,326
,530.61
$15,549,
076.77
$14,808,
644.55
$14,103,
471.00
NPV of all
BENEFITS $0.00
$
17,142,
857.14
$
33,469,
387.76
$
49,018,4
64.53
$
63,827,1
09.07
$
77,930,5
80.07
$
77,930,5
80.07
One-Time
COSTS
$(30,00
0,000.0
0)

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
4PROJECT AND RISK MANAGEMENT
Recurring
Costs $0.00
$(30,00
0,000.0
0)
$(30,00
0,000.0
0)
$
(30,000,
000.00)
$
(30,000,
000.00)
$
(30,000,
000.00)
Discount Rate 1.0000 0.9524 0.9070 0.8638 0.8227 0.7835
PV of
Recurring
Costs $0.00
$(28,57
1,428.5
7)
$(27,21
0,884.3
5)
$
(25,915,
127.96)
$
(24,681,
074.24)
$
(23,505,
784.99)
NPV of all
COSTS
$(30,00
0,000.0
0)
$(58,57
1,428.5
7)
$(85,78
2,312.9
3)
$(111,69
7,440.88
)
$(136,37
8,515.12
)
$(159,88
4,300.12
)
$(159,88
4,300.12
)
Overall NPV
$
(81,953,
720.05)
Overall ROI
-0.5126
Budgeting
Task Mode Task Name Duratio
n Start Finish Predecesso
rs Resource Names Cost
Auto
Schedule
d
Building the
infrastructure
for Amazon
to expand
business in
Bangladesh
368
days
Fri
16-
11-
18
Tue
14-04-
20
$258,568.00
Auto
Scheduled
Project
planning
47
days
Fri
16-
11-18
Mon
21-01-
19
$15,600.00
Auto
Scheduled
Analyzing
the requirement 6 days
Fri
16-
11-18
Fri 23-
11-18 Project manager $1,920.00
Auto
Scheduled
Project
nature analysis 5 days
Mon
26-
11-18
Fri 30-
11-18 2 Project planner $1,400.00
Auto
Scheduled
Resource
Estimation 4 days
Mon
03-
12-18
Thu 06-
12-18 3 Finance manager $1,600.00
Auto
Scheduled
Time
schedule
estimation
5 days
Fri
07-
12-18
Thu 13-
12-18 4 Project manager $1,600.00
Document Page
5PROJECT AND RISK MANAGEMENT
Auto
Scheduled
Estimation
of budget 10 days
Fri
14-
12-18
Thu 27-
12-18 5 Finance manager $4,000.00
Auto
Scheduled
Estimation
of manpower 8 days
Fri
28-
12-18
Tue 08-
01-19 6 Project manager $2,560.00
Auto
Scheduled
Analysis of
resources 9 days
Wed
09-
01-19
Mon 21-
01-19 7 Project planner $2,520.00
Auto
Scheduled
Project
planning
completion
phase
0 days
Mon
21-
01-19
Mon 21-
01-19 8 Project manager $0.00
Auto
Scheduled
Initiation
phase
105
days
Tue
22-
01-19
Mon
17-06-
19
$52,168.00
Auto
Scheduled Procurement of
fund
7 days
Tue
22-
01-19
Wed 30-
01-19 9 Sponsor $0.00
Auto
Scheduled Stakeholders
appointment
8 days
Thu
31-
01-19
Mon 11-
02-19 11 Project manager $2,560.00
Auto
Scheduled Arrangement of
meetings
6 days
Tue
12-
02-19
Tue 19-
02-19 12 Project manager $1,920.00
Auto
Scheduled Arrangement of
financial plan
9 days
Wed
20-
02-19
Mon 04-
03-19 13 Finance manager $3,600.00
Auto
Scheduled
Appointing
workers 8 days
Tue
05-
03-19
Thu 14-
03-19 14 Project planner $2,240.00
Auto
Scheduled
Preparation
of blueprint 7 days
Fri
15-
03-19
Mon 25-
03-19 15 Site supervisor $3,360.00
Auto
Scheduled Procurement of
land area
5 days
Tue
26-
03-19
Mon 01-
04-19 16 Site supervisor $2,400.00
Auto
Scheduled
Release of
legal notice 7 days
Tue
02-
04-19
Wed 10-
04-19 17 Contractor,Site supervisor $6,160.00
Auto
Scheduled
Allocating
the budget 9 days
Thu
11-
04-19
Tue 23-
04-19 18 Finance manager,Sponsor $3,600.00
Auto
Scheduled
Resource
procurement 8 days
Wed
24-
04-19
Fri 03-
05-19 19 Contractor,System planner $5,568.00
Auto
Scheduled
Division of
time
7 days Mon
06-
Tue 14-
05-19
20 Contractor,Project planner $4,760.00
Document Page
6PROJECT AND RISK MANAGEMENT
05-19
Auto
Scheduled
Duty
allocation 8 days
Wed
15-
05-19
Fri 24-
05-19 21 Contractor,Finance
manager,Sponsor $6,400.00
Auto
Scheduled
Risk
analysis 9 days
Mon
27-
05-19
Thu 06-
06-19 22 Risk manager,Project
planner $5,400.00
Auto
Scheduled
Risk
mitigation plan 7 days
Fri
07-
06-19
Mon 17-
06-19 23 Risk manager,Project
planner $4,200.00
Auto
Scheduled
Completion
of project
initiation
0 days
Mon
17-
06-19
Mon 17-
06-19 24 Project manager $0.00
Auto
Scheduled
Execution
phase
178
days
Tue
18-
06-19
Thu 20-
02-20 $163,728.00
Auto
Scheduled
Land area
preparation 12 days
Tue
18-
06-19
Wed 03-
07-19 25
Site
supervisor,Contractor,Projec
t planner
$13,920.00
Auto
Scheduled
Assortment
of resources 13 days
Thu
04-
07-19
Mon 22-
07-19 27 Contractor,Project planner $8,840.00
Auto
Scheduled
Construction of
building for
Amazon
9 days
Tue
23-
07-19
Fri 02-
08-19 28 Project planner,Contractor $6,120.00
Auto
Scheduled
Framework
construction of
Amazon
10 days
Mon
05-
08-19
Fri 16-
08-19 29 Site supervisor,Contractor $8,800.00
Auto
Scheduled
Selection of
entry and exit
spaces
11 days
Mon
19-
08-19
Mon 02-
09-19 30 Site supervisor,System
planner $8,536.00
Auto
Scheduled
Application
of bricks 14 days
Tue
03-
09-19
Fri 20-
09-19 31 Contractor,Site
supervisor,System planner $16,464.00
Auto
Scheduled Plumbing 12 days
Mon
23-
09-19
Tue 08-
10-19 32 Plumber,Project
manager,System planner $10,272.00
Auto
Scheduled
Installation
of electric
circuit
13 days
Wed
09-
10-19
Fri 25-
10-19 33 Site supervisor,Project
planner,System planner $13,728.00
Auto
Scheduled
Concerete
application 15 days
Mon
28-
10-19
Fri 15-
11-19 34
Contractor,Project
manager,Project
planner,System planner
$19,440.00
Auto
Scheduled
Application
of colour 11 days
Mon
18-
11-19
Mon 02-
12-19 35 Risk manager,Project
manager,Project planner $10,120.00
Auto 10 days Tue Mon 16- 36 Risk manager,System $6,160.00

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
7PROJECT AND RISK MANAGEMENT
Scheduled Implementation
of system
03-
12-19 12-19 planner
Auto
Scheduled
Application
of tiles 9 days
Tue
17-
12-19
Fri 27-
12-19 37 Contractor,Finance
manager,Site supervisor $11,520.00
Auto
Scheduled
Film
processing
implementation
15 days
Mon
30-
12-19
Fri 17-
01-20 38
System
planner,Contractor,Site
supervisor
$17,640.00
Auto
Scheduled
Warehouse
construction 13 days
Mon
20-
01-20
Wed 05-
02-20 39 System
planner,Contractor,Plumber $12,168.00
Auto
Scheduled
Central
heating zones
construction
11 days
Thu
06-
02-20
Thu 20-
02-20 40 $0.00
Auto
Scheduled
Project
execution
completion
0 days
Thu
20-
02-20
Thu 20-
02-20 41 Project manager $0.00
Auto
Scheduled
Development
phase
35
days
Fri
21-
02-20
Thu 09-
04-20 $26,152.00
Auto
Scheduled
Board
formation of
Amazon
8 days
Fri
21-
02-20
Tue 03-
03-20 42 System planner,Project
manager $4,928.00
Auto
Scheduled
Preparation
of statement
vision
7 days
Wed
04-
03-20
Thu 12-
03-20 44 Contractor,Project planner $4,760.00
Auto
Scheduled
Preparation
of standard
service
9 days
Fri
13-
03-20
Wed 25-
03-20 45
System
planner,Contractor,Project
manager
$9,144.00
Auto
Scheduled
Parking a
lot
implementation
6 days
Thu
26-
03-20
Thu 02-
04-20 46 Finance manager,Project
manager $4,320.00
Auto
Scheduled Finalization 5 days
Fri
03-
04-20
Thu 09-
04-20 47 Project manager,Project
planner $3,000.00
Auto
Scheduled
Development
phase
completion
0 days
Thu
09-
04-20
Thu 09-
04-20 48 Project manager $0.00
Auto
Scheduled
Closure
phase 3 days
Fri
10-
04-20
Tue 14-
04-20 $920.00
Auto
Scheduled
Sign off
stakeholder 2 days
Fri
10-
04-20
Mon 13-
04-20 49 Project manager $640.00
Auto
Scheduled
Review of
post project 1 day
Tue
14-
04-20
Tue 14-
04-20 51 Project planner $280.00
Document Page
8PROJECT AND RISK MANAGEMENT
Auto
Scheduled
Completion
of project
closure phase
0 days
Tue
14-
04-20
Tue 14-
04-20 52 Project manager $0.00
Financial Appraisal
Financial appraisal is considered to be objective for evaluation of profitability and
financial strength of the business unit (Kantor and Streitfeld 2015). The financial appraisal
mainly comprises of three aspects like cost of the project, estimation of cash flow and lastly
projecting balanced sheets. Cash flow estimation is considered to be an important factor for
ensuring the availability of the cash. It is mainly used for ensuring the requirements of the
project that is infrastructure for Amazon Bangladesh from time to time (Wingfield et al. 2018).
Management plan Matrix
Communication Format Frequency Owner Distribution Escalation
Weekly Status
Update
E-mail Once every
week
Project
manager
All project team
members and major
stakeholders of
Amazon Bangladesh
Project
CEO
Follow up of
Action item
Call or
Email
Once every
two days
PMO Everyone who comes
up with action with
Tls
COO
Usage of budget Face to
Face and
Interval of CFO Key stakeholders of
Amazon Bangladesh
CEO
Document Page
9PROJECT AND RISK MANAGEMENT
E-mail forty days Project
Update of
Reviewed Risk
Face to
Face
Interval of
forty days
PMO COO PM
Conclusion
In the above pages, Amazon is planning to make investment of 60 million dollars for its
Bangladesh Infrastructure project. A proper cost-benefit analysis and budget of the overall
project have been provided. The start date of the project is January 2019 and has been planned to
end by December 2019. The main expenses of the whole project are land procurement, office
building, purchasing of vehicle and lands and lastly testing market. The last part mainly deals
with effect of financial appraisal on overall budget of the project.
Section 7
Introduction
This particular section of the report deals with stakeholder management for the expanding
project of Amazon. It is expected that Amazon is preparing a platform where its operation in
Bangladesh can be easily started (Hossain et al. 2018). It is expected that the project will last for
a tenure of 1 year. The whole project is inclusive of a market research which aims to provide
proper authority for Amazon. Stakeholders can be considered to be group of people who are
mainly impacted by a project. A stakeholder can be either of two type that is supporter and or a
resistor. Project stakeholder management requires involvement of stakeholders, analysis of
expectation and its influences (Ashraf 2017).

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
10PROJECT AND RISK MANAGEMENT
Project Stakeholder Management
The method of identifying certain individuals who are generally impacted by a project is
known as stakeholder identification. Project manager can easily focus on certain number of
stakeholders which is needed to identifying the stakeholder method. Stakeholders are inclusive
of sponsors, management, government and lastly society. Stakeholders can easily create positive
and negative impact on the deliverables of the project. Stakeholders of Amazon Bangladesh
needs to be taken into account in the beginning stage of the project so that all the given
requirements are taken into account (Uddin 2016). Stakeholder can be easily classified in the
beginning stage of the Amazon Bangladesh project for understanding the requirements.
Stakeholder can be easily classified on the idea of interest in the given project. It can easily
influence the outcome of the project.
Stakeholder method can easily receive inputs from various aspect like Project charter,
project documents, enterprise environment factors, organizational process assets (Szabo et
al.2016). Both internal and external parties which are related to Amazon Bangladesh project can
be easily identified by making use of project charter. The parties which are involved in this
procurement contract can easily identify the key stakeholders of this project. Stakeholder
management requires taking consideration of various interest and along with values of
stakeholders (Tabassum 2017). It needs to be addressed at the duration of this Amazon
Bangladesh project so that all the involved stakeholders are happy after the closing phase of the
project. This particular branch of management is considered to be vital as it can help the
organization to easily achieve its strategic objectives by taking into account the external and
internal stakeholders (Neehal, Karim and Islam 2017). It is mainly done by building a positive
relationship with the other stakeholders which is done through good management of their
Document Page
11PROJECT AND RISK MANAGEMENT
expectation. It is important as it can be used for analyzing the current relationship with the
stakeholder of Amazon Bangladesh (Fair and Oldmixon 2015). The relationship can be changed
into partnership which can be used for building trust and encouraging collaboration with the
other stakeholder of Amazon Bangladesh.
Stakeholder management in this business sense tends to work with the help of a strategy.
The overall strategy is created by the help of information which is gathered by various process
like:
Stakeholder Identification: It is important for having an understanding the stakeholder
who are involved in the Amazon Bangladesh project like internal or external (Hussain et al.
2017). The best method of stakeholder identification is building a stakeholder map for it.
Stakeholder Analysis: By the help of stakeholder analysis, Project manager of Amazon
Bangladesh can easily identify the need, interfaces and common relationship of the various
stakeholders.
Stakeholder matrix: At this method, manager can easily analyze the position of
stakeholders with the help of gathered information at the time of stakeholder analysis method
(Lalremruata et al.2015). Stakeholder can easily have positioned themselves as per the level of
influence or enrichment which is provided in the project.
Stakeholder management: It is considered to be as one of the important methods of
stakeholder management where various stakeholders of Amazon Bangladesh are involved with
the managers (Ishtiaque and Sarwar 2016). It is considered to be important as it creates a
platform where managers and stakeholders can easily discuss with each other.
Document Page
12PROJECT AND RISK MANAGEMENT
Communication of Information: It is expected that communication can be easily agreed
in such a way it can be easily managed between the stakeholders of the project.
Stakeholder agreement: It helps in setting up the objective of any project like Amazon
Bangladesh (Imtiaz 2016)
. All the given stakeholders of the project need to sign the agreement which is considered
to be collection of decision.
Communication Plan
Communication plays a key role in keeping this Amazon Bangladesh on proper task
(Heldman 2018). Project manager is mainly charged for guiding various aspects of this project. It
generally specifies the communication which is inclusive of both method and frequency. It
totally depends on the requirements of this project. A proper understanding with respect to
purpose of communication plan can easily help managers in having a proper plan goal (Imtiaz
2016). Frequent communication generally allows employees to be productive in nature. When
the project members are kept in a loop about the project happening then they can easily feel more
comfortable about their duties (Heagney 2016). They are mainly equipped with proper
information which is needed for proper working instead of frequent stopping. Various project
members of Amazon Bangladesh can easily work together with proper communication. It allows
a proper communication and effective performance on this Amazon Bangladesh project. A
proper communication plan generally allows a project manager to lead the team for desired
outcome of this project (Skerrett et al.2018). Without proper communication with the various
stakeholders, project managers can easily fail to meet the needs of Amazon Bangladesh project.

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
13PROJECT AND RISK MANAGEMENT
Project manager needs to have clear communication with the stakeholders for analyzing the need
of the project.
Communication Matrix
Communi
cation
Type
Objective
of
Communi
cation
Mediu
m
Freque
ncy
Audience Owner Delivera
bles
Format
Kickoff
Meeting
A proper
introductio
n is there
between
project
team and
project.
Face to
face
One-
off
Shareholders
Project team
Stakeholders
Project
Manager
Meeting
minutes
Agenda
SharePoint
site and
internal
logging
system
Team
meeting of
project
Review of
weekly
status of
the project
with team.
Review of
last
performanc
Face to
face,
confer
ence
call
On
weekly
basis
that is
every
Monda
y
Project team Meeting
minutes
Project
Schedule
Agenda
Meeting
minutes
Project
Schedule
Soft copy of
project
SharePoint
site and
project
website
Document Page
14PROJECT AND RISK MANAGEMENT
e
Design
Meeting
Discussion
on urgent
points.
Developin
g technical
design
solution for
project and
validate
As
require
d
Content,
Strategies,
Designer team
Technician
Leader
Agenda
Meeting
Minutes
Platform for
offline testing
Project
website
Status
meeting of
project on
monthly
basis
Reporting
of status of
the project
to senior
manageme
nt
On
monthl
y basis
PMO
Stakeholders
Project
Manager
Update of
slide
Project
Schedule
Soft copy
Logs on
weekly basis
Report of
Project
Status
Report of
status of
the project
which is
inclusive
of cost,
On
both
monthl
y and
weekly
basis.
Project Sponsor
Project team
Stakeholders
PMO
Project
manager
Project
Status
report
Project
schedule
SharePoint
and project
website
Document Page
15PROJECT AND RISK MANAGEMENT
issues and
activities.
Conclusion
In the above pages of the report, an infrastructure development as Amazon is planning to
expand its business in Bangladesh. The ultimate goal of the organization is to build a profitable
operation in the organization which has many stocks for Amazon. Bangladesh is known to be
target country of Amazon and the country has many subcontinents. The project many involves
work in different cities of Bangladesh. The organization is planning to start its procuring office
in its capital state that is Dhaka.
Section 8
Introduction
Amazon Bangladesh project mainly focuses on providing necessary infrastructure for
proper launching of operation. Scope mainly comes up with outputs, benefits and the work which
is needed for producing it. It is mainly the scope of the work which is known to be a deciding
factor for managing various projects (Braddock et al.2015). The method of managing scope of
the project mainly depends on certain number of things like nature of objective and defining the
objectives.
Scope management
Scope management can be defined as the method by which outputs, benefits, and
outcomes can be easily defined and controlled easily (Marcelino-Sádaba et al.2014). The scope
of the project is mainly inclusive of inputs, but it can be extended for covering all the given

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
16PROJECT AND RISK MANAGEMENT
benefits. The scope of the program is mainly inclusive of benefits and results of change
management (Celli et al.2018). The scope of the project can be easily defined by the objectives
for which it is designed in proper way. Scope management comes up with main six main zones
which are identification and control of scope of the Amazon Bangladesh project.
Proper management of requirement and accessing of stakeholders want and their
needs (Guerin, Martin, and van Gorp, 2018). Requirements are needed to be
solution free. It mainly highlights the way for understanding the way in which
they are met.
Solution development needs the requirements of stakeholders and investigating
methods which can be used for providing the best value.
Benefits of management need to the requirements to be expressed in the benefits
and properly managing it through proper delivery (Walker, Harley and Mills
2015). It mainly tends to run through requirement management and development
of proper solution and making use of change management.
Change management mainly focuses on transformation of business which can use
certain outputs and benefits.
Change control can be stated as a proper kind of mechanism which is needed for
capturing and accessing various kind of changes in scope. It mainly highlights
that only beneficial changes can be done in the project of Amazon Bangladesh.
Closing of the project
Project Closure Phase is considered to be forth and last phase of the project. Project
closure involves proper handling of deliverables of this infrastructure development project to the
stakeholders (MINE and AREA, 2015). After that there is passing of document to the business
Document Page
17PROJECT AND RISK MANAGEMENT
and cancelling of orders. It mainly requires staff and proper equipment. It also intends to inform
the stakeholders about the closing phase of the project. After the closing of the project, a post
implementation review comes into action. It is mainly used for analyzing the success of the
project and identification of various lesson learned from the project(Bhattacharya, Oppenheim
and Stern 2015). There are certain number of activities which needs template for completing
each and every phase of the activity. There are mainly four phases of this project that are
research and analysis, development, recruitment and lastly final preparation. The first step which
is taken for understanding the closer of the project is all about building a project closure report. It
is considered for understanding the project closure report which is needed for smooth
competition of the project (Winch and Leiringer, 2016). There are mainly eight steps for closing
of the project like
Work was done as per requirement: As soon as the project is completed, all the needed
deliverables of this infrastructure development project needs to be completed and deliver to the
customer of Amazon from Bangladesh.
Complete closure of procurement: As the project is closing, the project manager of
Amazon Bangladesh should complete the remaining payment (Winch and Leiringer, 2016). It is
generally made to the suppliers and partners.
Gaining formal acceptance: Both formal acceptance and project deliverables are mainly
the customer. Generally, the infrastructure development organization should provide written
document which needs to be signed off or even documented (MINE and AREA, 2015). It mainly
highlights the project needs to be complete and accepting the output of this infrastructure
development project for Amazon Bangladesh.
Document Page
18PROJECT AND RISK MANAGEMENT
Index and achieving records: The finalized documents needs to be properly finalized.
Both the final version of the project plans of Amazon Bangladesh and all the required documents
are mainly achieved in the records of Amazon.
Release of resources: As soon as the project is totally completed, all the required details
of project resources are properly closed. The lesson is mainly leaned various project needs which
are properly collected and after that the resources are released.
Post Implementation review
Post-implementation review is mainly conducted after the completing phase of the
project. It is mainly provided prior to making some final improvements (Walker, Harley and
Mills 2015). It is mainly done for this infrastructure which has been long enough for judging it. It
mainly highlights for understanding the tenure of completion this infrastructure development
project. It mainly highlights the objectives of the project and effective project management
practices (Celli et al.2018). Documents which are result of post-implementation review report
are considered to be closeout reports (Bhattacharya, Oppenheim and Stern 2015). Conduction of
a PIR on timely basis will help in identifying various lessons which are learned in this
infrastructure development project of Amazon Bangladesh. It will ultimately aim in development
of the infrastructure of Amazon Bangladesh. Elements of lesson help in gaining objectives for
the upcoming project.
Key performance Indicator
A KPI can be defined as one of the measurable values which is needed for understanding
the effectiveness of any project for achieving its objectives. Various organization like amazon
makes use of KPI for evaluation of various level of success for achieving the targets. A high

Paraphrase This Document

Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
Document Page
19PROJECT AND RISK MANAGEMENT
level KPI generally focus on overall performance of the given enterprise. On the contrary a low
level of KPI focus on employees or departments likes sales and marketing.
Fig 3: KPI
(Source: Celli et al.2018)
Document Page
20PROJECT AND RISK MANAGEMENT
Conclusion
From the above pages, it can be easily stated that this report is all about Amazon which is
planning to expand its business in Bangladesh. It is considered to be as one of biggest online
retailer of the world. The organization is mainly associated with selling of goods in various
location of the world. The organization tends to provide a range of products that are digital
content, retail goods, business, and many others. At present, the organization tends to operate in
more than 16 countries. The project will be followed in some of the leading states of the country.
It expected that the project will be started in Jan 2019 and will end in Dec of same year. The
main expenses of the project are land procurement, building an office, purchasing various
vehicle and lastly testing markets. It is expected that the whole project will be completed within
60 million dollars. In the above pages the report, project costing, budgeting, and financial
appraisal has been provided. After that stakeholder management and communication plan of the
project has been discussed in details. The last section of the report mainly deals with managing
scope, closing of project and lastly post-implementation review plan. The key stakeholders of the
project are top management, contractors, subcontractors, government teams and lastly internal
and external customers.
Document Page
21PROJECT AND RISK MANAGEMENT
References
Ashraf, S.S., 2017. Barriers in growth of Daraz Bangladesh from customer’s point of view: how
to make the online shopping experience better.
Bhattacharya, A., Oppenheim, J. and Stern, N., 2015. Driving sustainable development through
better infrastructure: Key elements of a transformation program. Brookings Global Working
Paper Series.
Braddock, D.L., Hemp, R., Rizzolo, M.C., Tanis, E.S., Haffer, L. and Wu, J., 2015. The state of
the states in intellectual and developmental disabilities: Emerging from the great recession.
Washington, DC: American Association on Intellectual and Developmental Disabilities.
Celli, G., Pilo, F., Pisano, G. and Soma, G.G., 2018, May. Including voltage dips mitigation in
cost-benefit analysis of storages. In Harmonics and Quality of Power (ICHQP), 2018 18th
International Conference on (pp. 1-6). IEEE.
Fair, C. and Oldmixon, S., 2015. Think Again: Islamism and Militancy in Bangladesh. The
National Interest, 13.
Guerin, B., Martin, A. and van Gorp, A., 2018. Cost-benefit analysis. Evaluating interventions
that prevent or counter violent extremism, p.37.
Heagney, J., 2016. Fundamentals of project management. Amacom.
Heldman, K., 2018. PMP: project management professional exam study guide. John Wiley &
Sons.

Secure Best Marks with AI Grader

Need help grading? Try our AI Grader for instant feedback on your assignments.
Document Page
22PROJECT AND RISK MANAGEMENT
Hossain, M., Vadas, R., Ruiz-Carus, R. and Galib, S.M., 2018. Amazon Sailfin Catfish
Pterygoplichthys pardalis (Loricariidae) in Bangladesh: A Critical Review of Its Invasive Threat
to Native and Endemic Aquatic Species. Fishes, 3(1), p.14.
Hussain, A., Mkpojiogu, E.O., Musa, J.A. and Mortada, S., 2017, October. A user experience
evaluation of Amazon Kindle mobile application. In AIP Conference Proceedings(Vol. 1891,
No. 1, p. 020060). AIP Publishing.
Imtiaz, M., 2016. Content management system of Daraz Bangladesh.
Ishtiaque, A.S. and Sarwar, A., 2016. E-commerce in Bangladesh.
Kantor, J. and Streitfeld, D., 2015. Inside Amazon: Wrestling big ideas in a bruising
workplace. New York Times, 15, pp.74-80.
Lalremruata, A., Magris, M., Vivas-Martínez, S., Koehler, M., Esen, M., Kempaiah, P., Jeyaraj,
S., Perkins, D.J., Mordmüller, B. and Metzger, W.G., 2015. Natural infection of Plasmodium
brasilianum in humans: man and monkey share quartan malaria parasites in the Venezuelan
Amazon. EBioMedicine, 2(9), pp.1186-1192.
Marcelino-Sádaba, S., Pérez-Ezcurdia, A., Lazcano, A.M.E. and Villanueva, P., 2014. Project
risk management methodology for small firms. International journal of project
management, 32(2), pp.327-340.
MINE, P.O. and AREA, C., 2015. Cost Benefit Analysis.
Neehal, N., Karim, D.Z. and Islam, A., 2017, December. Cloud-POA: A cloud-based map only
implementation of PO-MSA on Amazon multi-node EC2 Hadoop Cluster. In Computer and
Information Technology (ICCIT), 2017 20th International Conference of (pp. 1-6). IEEE.
Document Page
23PROJECT AND RISK MANAGEMENT
Skerrett, D.M., Gibson, M., Darwin, L., Lewis, S., Rallah, R. and De Leo, D., 2018. Closing the
gap in Aboriginal and Torres Strait Islander youth suicide: A social–emotional wellbeing service
innovation project. Australian Psychologist, 53(1), pp.13-22.
Szabo, S., Brondizio, E., Hetrick, S., Matthews, Z., Renaud, F., Nicholls, R., Sebesvari, Z., da
Costa, S., Dearing, J., Foufoula-Georgiou, E. and Tejedor, A., 2016. Population dynamics in the
context of environmental vulnerability: comparison of the Mekong, Ganges-Brahmaputra and
Amazon delta regions.
Tabassum, R., 2017. Enhancing female customers at Daraz Bangladesh.
Uddin, M., 2016. Daraz Bangladesh Limited is changing the online shopping experiences: the
successful launch of fatafati friday.
Walker, D.H.T., Harley, J. and Mills, A., 2015. Performance of project alliancing in Australasia:
a digest of infrastructure development from 2008 to 2013. Construction Economics and
Building, 15(1), p.1.
Winch, G. and Leiringer, R., 2016. Owner project capabilities for infrastructure development: A
review and development of the “strong owner” concept. International Journal of Project
Management, 34(2), pp.271-281.
Wingfield, N.I.C.K., Thomas, K.A.T.I.E. and Abelson, R.E.E.D., 2018. Amazon, Berkshire
Hathaway and JPMorgan team up to try to disrupt health care. New York Times. January, 30.
1 out of 24
circle_padding
hide_on_mobile
zoom_out_icon
[object Object]

Your All-in-One AI-Powered Toolkit for Academic Success.

Available 24*7 on WhatsApp / Email

[object Object]