Project Schedule1 PROJECT Schedule Name Professor Date Introduction Project schedule/program is an essential tool in project management because it provides a road map to successful completion of the project. The project schedule communicates the works or activities to be performed, the timeframe or duration for each activity and the human resource needed to perform the work. Project scheduling is one of the key elements of project planning. It is important to ensure that all key activities of the project are included in the project schedule. For the proposed LC-01A building project, the project schedule contains all key activities from site preparation to handing over. The project schedule presented here contains the activities that need to be done, the duration needed to complete the activities, and the stakeholders responsible for performing the activities. The project schedule is presented in form of a Gantt chart, as shown in table 1 below. As shown in the project schedule, some activities are overlapping, which will help in reducing the time of completing the project. The project manager will be responsible for supervising ongoing works to ensure that they are done in accordance with the project specifications and the relevant building standards and codes. The design team will be responsible
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
Project Schedule2 for inspecting ongoing work to ensure compliance with the design documents and relevant standards. Table 1: Project schedule Activity Duration (weeks) Person in charge Week 1-4 Week 5-8 Week 9-12 Week 13-16 Week 17-20 Week 21-24 Week 25-28 Week 29-32 Week 33-36 Week 37-40 Week 41-44 Week 45-48 Week 49-52 Site fencing1PM & C Site clearing1C Site excavation1PM & C Grading & levelling2PM & C Foundation excavation 1PM & C Foundation construction 2PM, DT & C Erecting scaffolding1PM & C Columns construction 3PM, DT & C Floor slabs construction 2PM, DT & C Walling & partitions6C Roofing5PM & C Installation of windows & doors 8C Plumbing works6C Electrical works6C Specialty installations 10C Insulation5C Plastering14C Rendering10C Drywall installation4C Painting10C Underlayment2C Flooring and carpet2PM & C Connection to water main 1PM & C Connection to power1PM & C
Project Schedule3 main Connection to sewerage system 1PM & C Landscaping9PM & C Finishes – electrical & plumbing 3PM & C External worksPM & C Clean upC Inspection and handing over PM, DT, C & BI Legend: PM = project manager, C = contractor/subcontractor, DT = design team, and BI = building inspector.