The scope of this project is to upgrade the network infrastructure from existing
infrastructure design of Simple Studios Pty Ltd. This implementation will support the
increased scale of production. The employees will have better physical space and upgraded
infrastructure of the devices to meet customer’s deadline and handle the production size. The
new storage (datacentre hosts) will be accessed remotely by the server (Erl, Puttini and
Mahmood 2013). The hosts' datacentre is no longer need to connect with the server
physically. It will allow the business to reduce the investments into infrastructure maintaining
and preservation.
Overview
Virtualization techniques shift the thought process from physical to logical network
infrastructure. VMware uses the physical storage resources as logical resources. Hence,
VMware builds an abstraction layer between the physical components and the actual
computing that takes place on the cloud platform (Gallagher, S., 2013). The VMware Cloud
Automation Design and Deploy service works as infrastructure as a service (IaaS) and helps
in upgrading from existing infrastructure to a new model of delivery methods. The
infrastructure as a Service with cloud computing model has become a very practical solution
to reduce cost and improve the use of resources. vSphere is a VMware cloud computing
platform that allows managing virtualized deployments (Chaolong, Hanning and Lili 2016).
The vSphere will provide the private cloud by using the company's own datacentres. It is
expected that the new infrastructure will provide virtual servers with a specific IP address to
access the data storages.
Project scope. The scope of this project is to upgrade_1
Deliverables
i. Analysis: Feasibility study, analysis of the system requirement and
configuration of the upgraded device.
ii. Design: The network design including architecture, virtual center server
(vCenter), components functionality diagrams and authentication activity
design.
iii. ESXi configuration: Installation of ESXi in VMware and setting a static IPv4
address and default gateway in ESXi host.
iv. Connection testing: Test connection by using ping on the used static IP
address.
v. Deployment: Installation and configuration of software package vCenter
server which will act as a datacentre for the other virtual machines and ESXi
hosts.
vi. Cloud storage: Creation of new datacentre hosts using previously set IP
address. The data center will add virtual disks that are physically connected to
the server and hosts machine.
vii. Data mitigation: Installation of Microsoft SQL server and create the database
tables and objects (Wu et al. 2014). Loading of the data in cloud storage using
the import feature in My SQL server.
viii. Data migration: Using drag and drop feature to move file or directories from
one host to another.
Resources
The project will need a project manager while the group members are going to play
different roles. For setting up a virtual machine, resources allocation settings are the first
Project scope. The scope of this project is to upgrade_2

End of preview

Want to access all the pages? Upload your documents or become a member.

Related Documents
Server Virtualization
|68
|2188
|20

Analyzing Requirements for Deploying Virtual Server in Production Industry
|5
|962
|181

Install ESXi on a VM - Desklib
|120
|3629
|301

Server Virtualization
|67
|761
|370

Server Virtualization: Installation and Configuration of VMware and Ubuntu Virtual Machine
|25
|3197
|279

Design Task - Information Storage and Management for Enterprise Data
|39
|818
|131