1PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION Table of Contents 1.0 Introduction..............................................................................................................................2 2.0 Project Portfolio.......................................................................................................................3 2.1 Background and Context of the Project...............................................................................3 2.2 Models and Theories Used in Analysis................................................................................3 2.3 Project Phases and their Effectiveness.................................................................................4 4 Skills Developed to Solve Work Based Problems................................................................10 2.5 Actions Taken / Not Taken................................................................................................11 2.6 Learning Taken from Project.............................................................................................12 3.0 Conclusion..............................................................................................................................12 Bibliography.................................................................................................................................14 Appendix......................................................................................................................................17
2PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION 1.0 Introduction The purpose of this report is to develop a portfolio of evidence through utilizing various activities and methodologies such as identification of the market, analyzing problems in the current scenario, critical thinking and many academic researches and academics. A student society has been proposed for building a better society that will be responsible for delivering qualified and high quality academics among the GSM students. The delivery of the event will be proposed through utilizing EMBOK model that focuses on three crucial objectives including creating, developing, and delivering the event of organizing and building the student society. Proper planning, analysis and managerial or leadership skill will be needed to host the event successfully including the framework of the EMBOK that mainly focuses on the phases, processes, core values, and domains in relation to the project being delivered. This report emphasizes on the identification of the methods and processes those are capable of delivering the event in successful manner. Issues and risks are major point of concern for this report in manner to identify and eliminate the issues and solving the problems, those might affect the delivery of the project influencing its qualities and constraints in negative manner. The student society will be helpful in providing better options for the GSM students and helping them to accomplish better and higher grades in the academics along with the concept of learning knowledge and skills. Market analysis and proposed planning will be helpful in delivering the objectives of the project.
3PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION 2.0 Project Portfolio 2.1 Background and Context of the Project The project is all about creating a student society that can boost the personal development of the individuals through gaining extra knowledge from experienced players in the same field. It will be an attempt of providing the facilities that can enhance the development practice, personal growth, and motivation towards reaching the objectives and goals in the life. The data and information collected through the market research will be helpful in delivering and setting goals of the project. Society has been affecting the capacity and capability of the students learning in the GSM however, approach will be to bring up the members from the same society those can contribute in the development of the individuals studying at GSM. The solution for the identified problem is the development of a student society that can contribute in the development of the students and motivate them towards accomplishing the better activities those can lead them to a successful life living. 2.2 Models and Theories Used in Analysis Firstly, primary data analysis will be executed for the consideration of the aspects related to the needs and requirements of the users. It will also helpful in identifying how effective could it be propose the solution for the identified problem. Stakeholders are overall the point of concern and output will be considering the beneficial results for the Gallup strength model will be utilized for the accomplishment and delivery of the project’s goals and objectives. This will be helpful in setting the positive goals and positive mindset for the delivery of the project considering the identification of the weaknesses and strengths of the team being developed for the execution of the project.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
4PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION 2.3 Project Phases and their Effectiveness Followingarethecrucialphasesthoseneedstobeaccomplishedinmannerto successfully host the event and accomplish all the constraints of the project in an efficient and effective manner. The sequential execution and completion of the following activities will be helpful in accomplishing the goals and objectives of the event being proposed: ProjectPlanning– It can be stated as the most crucial aspect of the overall project as it emphasizes on the determination of all the objectives and circumstances those might affect the delivery and execution of the project. It also includes the execution of the market analysis focusing the problems and identifying the solutions, those might be helpful in meeting the needs andrequirementsofthestakeholders.Themajoridentifiedcourseinthisphaseisthe identification of the problems and issues those might hold the project from being a successful efficient event. ProjectInitiation– This is the phase followed after the planning considering the initiation of the objectives related to the project those are necessary and crucial for laying path of the project. It includes the presentation of the proposal and draft, identification of the goals and objectives, estimation of the budget, market analysis, identification of the resources and solutions those could fulfil the needs and requirements of the customers, schedule and risks, and many more those should be stated clearly in the beginning of the project. In this phase, the project is initiated and preparatory works are started. ProjectExecution– The objective of executing the above two phases is to start the work on the execution of the project as the planning has been successfully delivered and it is the time to implement the findings and results those have been identified during the initiation phase. The
5PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION crucial aspects of the project delivery will be identified in this section considering the budget, schedule and accomplishment of the activities as the successful delivery of these constraints will be determining the quality of the project. Project Closing– In this phase, the project documentation is prepared and then reviewed by the project manager. Once satisfactory results are gained, the stakeholders sign off and the project manager closes the project officially. It is to be hereby noted that these phases of the project must be executed in the right order by linking the work packages with each other in order to complete the project effectively and successfully. For this particular project on focus, the project schedule is shown in the following table including the stakeholders assigned and the estimated costs for each of the work packages. WBSTask NameDuratio nStartFinish Pred ecess ors Resource NamesCost 0Development of a Society of Student73 daysMon 5/14/18 Wed 8/22/18$515,680.00 1Phase 1: Project Planning16 daysMon 5/14/18 Mon 6/4/18$210,120.00 1.1 Analyzing and identifying the Problems in present scenario 2 daysMon 5/14/18 Tue 5/15/18Team leader, Project Manager$6,000.00 1.2 Proposing society of a student as the Solution 1 dayWed 5/16/18 Wed 5/16/182Team leader$1,400.00 1.3 Evaluating the feasibility of the proposed solution 2 daysThu 5/17/18 Fri 5/18/183Finance Manager, Team leader$5,600.00
6PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION 1.4Risk Assessment10 daysMon 5/21/18 Fri 6/1/18Project Manager, Team leader$193,320.00 1.4.1Identification of the Risks2 daysMon 5/21/18 Tue 5/22/184Project Manager, Team leader, Team Selection Committee$8,320.00 1.4.2Risk Prioritization3 daysWed 5/23/18 Fri 5/25/186 Finance Manager, Market Analyst, Resources[1], Team Selection Committee $70,080.00 1.4.3Risk Handling documentation2 daysMon 5/28/18 Tue 5/29/187 Finance Manager, Project Manager, Team Selection Committee $8,320.00 1.4.4 Risk Mitigation strategies documentation 3 daysWed 5/30/18 Fri 6/1/188Market Analyst, Resources[1], Team leader, Training Costs[1]$76,600.00 1.5Approval of Project1 dayMon 6/4/18 Mon 6/4/185Project Manager, Finance Manager, Market Analyst$3,800.00 2Second Phase: Project Initiation15 daysTue 6/5/18 Mon 6/25/18$23,600.00 2.1 Assigning roles and responsibilities of the stakeholders 2 daysTue 6/5/18 Wed 6/6/1810Project Manager$3,200.00 2.2 Arranging Volunteers for the accomplishment of activities 2 daysThu 6/7/18 Fri 6/8/1812Project Manager$3,200.00 2.3Project Charter Development1 dayMon 6/11/18 Mon 6/11/1813Project Manager$1,600.00 2.4Setting scope of the Project2 daysTue 6/12/18 Wed 6/13/1814Project Manager$3,200.00 2.5 Estimation of the budget of the project 1 dayThu 6/14/18 Thu 6/14/1815Finance Manager$1,400.00 2.6Determination of1 dayFriFri16Team leader$1,400.00
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
7PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION the project Assumptions and Constraints 6/15/186/15/18 2.7 Developing the schedule of the project 2 daysMon 6/18/18 Tue 6/19/1817Project Manager$3,200.00 2.8 Sub-Dividing the Project activities among the stakeholders 2 daysWed 6/20/18 Thu 6/21/1818Project Manager$3,200.00 2.9 Approval for the Execution of the project 2 daysFri 6/22/18 Mon 6/25/1819Project Manager$3,200.00 3Third Phase: Project Execution42 daysTue 6/26/18 Wed 8/22/18$281,960.00 3.1 Assign different sectors to different internal stakeholders 2 daysTue 6/26/18 Wed 6/27/1820Project Manager$3,200.00 3.2 Providing room for the execution of the work 1 dayThu 6/28/18 Thu 6/28/1822Project Manager$1,600.00 3.3 Securing and collecting the financial help from sponsors 2 daysFri 6/29/18 Mon 7/2/1823Finance Manager$2,800.00 3.4 Communication with different students 2 daysTue 7/3/18 Wed 7/4/1824Team leader, Team Selection Committee$5,120.00 3.5Preparing List of students Applying for involving in the 1 dayThu 7/5/18 Thu 7/5/18 25Team leader$1,400.00
8PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION host 3.6 Select the Students eligible for the society 15 daysFri 7/6/18 Thu 7/26/1826 Team Selection Committee, Resources[1], Third Party Management[1] $82,400.00 3.7 Executing the Survey of the questionnaire 2 daysFri 7/27/18 Mon 7/30/1827 Database for the management of the data[1], Finance Manager, Project Manager, Resources[1], Team Selection Committee $93,320.00 3.8Market research execution3 daysTue 7/31/18 Thu 8/2/1828 Project Manager, Team leader, Third Party Management[1], Training Costs[1] $24,000.00 3.9 Determination of the team skills and knowledge 4 daysFri 8/3/18 Wed 8/8/1829 Finance Manager, Project Manager, Team Selection Committee $16,640.00 3.10Project Closing10 daysThu 8/9/18 Wed 8/22/18 Market Analyst, Team leader, Third Party Management$51,480.00 3.10.1Project Review2 daysThu 8/9/18 Fri 8/10/1830Team leader, Project Manager$6,000.00 3.10.2Documentation of Project3 daysMon 8/13/18 Wed 8/15/1832Team leader, Team Selection Committee$7,680.00 3.10.3Final Appraisal3 daysThu 8/16/18 Mon 8/20/1833Project Manager$4,800.00 3.10.4Stakeholder Sign Off1 dayTue 8/21/18 Tue 8/21/1834Finance Manager, Team leader, Project Manager$4,400.00 3.10.5Official Closing1 dayWed 8/22/18 Wed 8/22/1835Project Manager$1,600.00 Gantt chart:
9PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION Figure 1: Gantt Chart (Source: Created by Author)
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
10PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION 4 Skills Developed to Solve Work Based Problems Many challenges and problems were encountered while working on the project of developing a student network society however; that resulted in the positive manner as I developed many skills those will be helpful in delivering the future projects successfully. These knowledge and skills helped me in generating following personal development skills: Technical Knowledge application: I identified that for the successful accomplishment and delivery of the project, theoretical knowledge is not enough in technical aspects as the scenario keeps changing as we proceed with the project. However, I took this project as a lesson and tried to gather technical knowledge as much possible ad implemented them in the present and future projects. Completely relying on the theoretical knowledge could never led to the accomplishment of the project in successful manner as proper decision-making is needed in the context of the changes arising during the growth and development of the project. Team Work: Working alone could never result in a beneficial manner, as it is a crucial aspect to consider as many aspects as much possible and stick with the plan. Team is always comprised of individuals from different backgrounds and different skills and thus, innovative and creative ideas are always encountered during the execution and development of the project. It is an essential factor to work and collaborate within the team and manage them is the biggest challenge. I tried to manage the team members within the team and kept the conflicts miles away from the project. Ability to Identify Problems– I passed this major quality during the development of the project as I identified many problems those had restricted me in delivering the objectives and scope of the project. It is very often visible that individuals fail to pick out the exact trouble and
11PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION apply any remedial measures that do not have an effect on the real hassle in any way. I had embraced my quality of problem identification and their prioritization as per the need of the project. In-Depth Knowledge of the Solution– Some other are not unusual trouble observed in the course of the projects is that the individuals recognize the answer to a trouble however does now not recognize to use the identical efficaciously in an effort to cope with the problem. I was nicely handling the problems encountered during the execution and therefore, earlier than the challenge, I evaluated feasible challenges and troubles and studied their possible answers therefore. This helped me to use solutions to the troubles correctly without dropping an awful lot time or resources. 2.5 Actions Taken / Not Taken It was also a crucial objective to identify which action should be taken and which should not be taken and I considered it as a crucial objective for the development and execution of the project. Actions Taken– the primary activity was to execute the market analysis in manner to identify the needs and requirements of the targeted customers those were the students of the GSM University. In manner to solve the problem identified in relation to the studies and personal development of the students, I proposed the above option as a solution and consulted with my team members on whether it would be helpful for delivering the project or not. Actions Not Taken– I had not executed the project unless the scope and objective for the delivery of the project was very clear, that resulted in positive manner as the identified objectives, and scopes were the center of concern during the overall execution of the project.
12PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION 2.6 Learning Taken from Project Practical skills and knowledge were gathered during and after the development and execution of the project that will be helpful in the present and future scenarios of my life. List of the skills developed can be listed as: Project Management Skills– I was well introduced with the theoretical knowledge of the project management however; this project helped me in realizing the concept of the project management in the real world. Value of Team Work– Team and their contribution in the development and growth of the project plays very crucial role in delivering the positive outcomes from the project. It helped in tackling with the problems encountered and introducing creative and innovative approaches for the project. Time Management Skills– There are various activities involved during hosting an event like this and time should be managed according to the left and activities done. There should be a routine for the delivery of the project and activities as enlisted in the above activity diagram. 3.0 Conclusion It can be concluded that for the project would not be successful without having proper knowledge and skills necessary for the execution of the project. I had developed many skills and knowledge and it can be stated that practical experience is never been the same as that of the theoretical knowledge. However, it is very crucial to consider the theoretical steps for the delivery of the project as it would have never been started if I had not any theoretical knowledge about the management of hosting.
Secure Best Marks with AI Grader
Need help grading? Try our AI Grader for instant feedback on your assignments.
14PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION Bibliography Achpal, A., Kumar, V.B. and Mahesh, K., 2016. Modeling Ontology Semantic Constraints in Relational Database Management System. InProceedings of the International MultiConference of Engineers and Computer Scientists(Vol. 1). Arasu, A., Babcock, B., Babu, S., Cieslewicz, J., Datar, M., Ito, K., Motwani, R., Srivastava, U. and Widom, J., 2016. Stream: The stanford data stream management system. InData Stream Management(pp. 317-336). Springer, Berlin, Heidelberg. Binder, J., 2016.Global project management: communication, collaboration and management across borders. Routledge. Boud, D., Cohen, R. and Sampson, J. eds., 2014.Peer learning in higher education: Learning from and with each other. Routledge. Carrasco, R.A., Blasco, M.F., GarcÃa-Madariaga, J. and Herrera-Viedma, E., 2017. Integrating a Tourism Service Quality Evaluation Linguistic Multi-criteria Decision Making Model into a Relational Database Management System. InAdvances in Fuzzy Logic and Technology 2017(pp. 408-418). Springer, Cham. Deelman, E., Vahi, K., Juve, G., Rynge, M., Callaghan, S., Maechling, P.J., Mayani, R., Chen, W., da Silva, R.F., Livny, M. and Wenger, K., 2015. Pegasus, a workflow management system for science automation.Future Generation Computer Systems,46, pp.17-35. Fleming, Q.W. and Koppelman, J.M., 2016, December. Earned value project management. Project Management Institute.
15PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION Hababeh, I., Khalil, I. and Khreishah, A., 2015. Designing high performance web-based computing services to promote telemedicine database management system.IEEE transactions on services computing,8(1), pp.47-64. Harrison, F. andLock,D., 2017.Advancedprojectmanagement:astructuredapproach. Routledge. Heagney, J., 2016.Fundamentals of project management. AMACOM Div American Mgmt Assn. Kerzner, H. and Kerzner, H.R., 2017.Project management: a systems approach to planning, scheduling, and controlling. John Wiley & Sons. Kerzner, H., 2018.Project management best practices: Achieving global excellence. John Wiley & Sons. Lee, H., Chapiro, J., Schernthaner, R., Duran, R., Wang, Z., Gorodetski, B., Geschwind, J.F. and Lin, M., 2015. How I do it: a practical database management system to assist clinical research teams with data collection, organization, and reporting.Academic radiology,22(4), pp.527-533. Nidzwetzki, J.K. and Güting, R.H., 2016.DISTRIBUTED SECONDO: An extensible highly available and scalable database management system. FernUniversität, Fakultät für Mathematik und Informatik. Prout, A., Kepner, J., Michaleas, P., Arcand, W., Bestor, D., Bergeron, B., Byun, C., Edwards, L., Gadepally, V., Hubbell, M. and Mullen, J., 2015, September. Enabling on-demand database computing with MIT SuperCloud database management system. InHigh Performance Extreme Computing Conference (HPEC), 2015 IEEE(pp. 1-6). IEEE.
Paraphrase This Document
Need a fresh take? Get an instant paraphrase of this document with our AI Paraphraser
16PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION Reddy, T.B., Thomas, A.D., Stamatis, D., Bertsch, J., Isbandi, M., Jansson, J., Mallajosyula, J., Pagani, I., Lobos, E.A. and Kyrpides, N.C., 2014. The Genomes OnLine Database (GOLD) v. 5: ametadatamanagementsystembasedonafourlevel(meta)genomeproject classification.Nucleic acids research,43(D1), pp.D1099-D1106. Schwalbe, K., 2015.Information technology project management. Cengage Learning. Verzuh, E., 2015.The fast forward MBA in project management. John Wiley & Sons. Walker, A., 2015.Project management in construction. John Wiley & Sons. Yunus, M.A.M., Krishnan, S.K.G., Nawi, N.M. and Surin, E.S.M., 2017. Study on Database ManagementSystemSecurityIssues.JOIV:InternationalJournalonInformatics Visualization,1(4-2), pp.192-194.
17PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION Appendix The Gantt chart of the project is as follows. IDTask Mode Task NameDurationStartFinishPredecessorsResource Names 0Development of Vehicle Database for Haulage Company 135 daysMon 5/14/18 Fri 11/16/18 1Project Planning7 daysMon 5/14/18Tue 5/22/18 2Survey and Analysis of Problems in Current System 2 daysMon 5/14/18 Tue 5/15/18 IT Manager,Project Manager 3Proposal of Solution 1 dayWed 5/16/18 Wed 5/16/18 2IT Manager 4Testing for the Feasibility of the Solution 2 daysThu 5/17/18 Fri 5/18/183Finance Manager,IT Manager 5Risk Assessment 1 dayMon 5/21/18 Mon 5/21/18 4Project Manager,IT Manager6Approval of Project1 dayTue 5/22/18Tue 5/22/185Project Manager 7Project Initiation15 daysWed 5/23/18Tue 6/12/18 8Assign Respective Roles to the Right 2 daysWed 5/23/18 Thu 5/24/18 6Project Manager 9Hire Consultant and Database Developer 2 daysFri 5/25/18Mon 5/28/18 8Project Manager 10Develop Project Charter 1 dayTue 5/29/18 Tue 5/29/18 9Project Manager 11Identify Project Scope 2 daysWed 5/30/18 Thu 5/31/18 10Project Manager 12Estimate a Feasible Budget 1 dayFri 6/1/18Fri 6/1/1811Finance Manager 13Determine Assumptions and Constraints 1 dayMon 6/4/18 Mon 6/4/18 12IT Manager 14Develop Project Schedule 2 daysTue 6/5/18Wed 6/6/18 13Project Manager 15Divide Work Packages among Team Members 2 daysThu 6/7/18Fri 6/8/1814Project Manager 16Green Light for Proceeding with Project 2 daysMon 6/11/18 Tue 6/12/18 15Project Manager 17Project Execution103 daysWed 6/13/18Fri 11/2/18 18Assign Roles to Team Members 2 daysWed 6/13/18 Thu 6/14/18 16Project Manager 19Provide Room for Project Work 1 dayFri 6/15/18Fri 6/15/1818Project Manager 20Secure Budget from Sponsor 2 daysMon 6/18/18 Tue 6/19/18 19Finance Manager 21Start Developmet of Database 2 daysWed 6/20/18 Thu 6/21/18 20IT Manager,Database Developer22Prepare List of Features to be Added 1 dayFri 6/22/18Fri 6/22/1821IT Manager 23Install New Hardware 15 daysMon 6/25/18 Fri 7/13/1822Database Developer,Hardware[1],Vendor Costs[1]24Install Support Software 4 daysMon 7/16/18 Thu 7/19/18 23Database Developer,Software[1] 25Develop Initial Database 10 daysFri 7/20/18Thu 8/2/1824Database Developer 26Develop Company Website 2 daysFri 8/3/18Mon 8/6/18 25Database Developer 27Run the Functions of the Prototype 5 daysTue 8/7/18Mon 8/13/18 26Database Developer 28Test the Prototype 4 daysTue 8/14/18 Fri 8/17/1827Database Developer 29Solving Errors of Prototype 5 daysMon 8/20/18 Fri 8/24/1828Database Developer 30Develop Full Version of the Database 25 daysMon 8/27/18 Fri 9/28/1829Database Developer 31Final Testing15 daysMon 10/1/18 Fri 10/19/18 30Database Developer,System Tester32Training of Company Staffs 10 daysMon 10/22/18 Fri 11/2/1831Training Costs[1],System Tester33Project Closing10 daysMon 11/5/18Fri 11/16/18 34Project Review 2 daysMon 11/5/18 Tue 11/6/18 32IT Manager,Project Manager35Documentation of Project 3 daysWed 11/7/18 Fri 11/9/1834IT Manager,Database Developer36Final Appraisal3 daysMon 11/12/18Wed 11/14/1835Project Manager 37Stakeholder Sign Off1 dayThu 11/15/18Thu 11/15/1836Finance Manager,IT Manager,Project Manager 38Offi cial Closing1 dayFri 11/16/18Fri 11/16/1837Project Manager IT Manager,Project Manager IT Manager Finance Manager,IT Manager Project Manager,IT Manager Project Manager Project Manager Project Manager Project Manager Project Manager Finance Manager IT Manager Project Manager Project Manager Project Manager Project Manager Project Manager Finance Manager IT Manager,Database Developer IT Manager Database Developer,Hardware[1],Vendor Costs[1] Database Developer,Software[1] Database Developer Database Developer Database Developer Database Developer Database Developer Database Developer Database Developer,System Tester Training Costs[1],System Tester IT Manager,Project Manager IT Manager,Database Developer Project Manager Finance Manager,IT Manager,Project Manager Project Manager FSSMTWTFS Feb 25, '18Apr 29, '18Jul 1, '18Sep 2, '18Nov 4, '18 Figure 1: Gantt Chart of the Project
18PROJECT/PLACEMENT DESIGN AND IMPLEMENTATION (Source: Created by Author)